← Back
Two family brick
57-09 134 STREET
QUEENS · Queensboro Hill · BIN 4139153
💬 Discuss this project
2024Year Built
3Stories
B1Building Class
R4-1Zoning
3,883 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 4,000 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof2p · 1 filing · 11 docs
Floor 330p · 1 filing · 20 docs
Floor 229p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar30p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2023$1.3M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRISE CONTRACTING GROUP, INC1307/22/2026
CHUN FENG, ARCHITECT107/31/2024
FLUSHING ENGINEERING SERVICE PC103/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC2003/21/2026
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JIN SUN CONSTRUCTION INCGeneral Contractor3207/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506207/22/2026
BRIAN ILL DEVELOPMENT LLC1402207/22/2026
HIRISE CONTRACTING GROUP,8228905/21/2026
SQ. ARCH, LLC4802107/31/2024
Building Lifecycle
All (132)Filed (13)Permit Issued (15)Signed Off (5)Violation (6)Inspection (9)Objection (54)Special Inspection (30)
08/26/2026
Special inspection requirement — Footing and Foundation
BRIAN ILL
08/26/2026
Special inspection requirement — Air barrier - visual inspection
BRIAN ILL
08/26/2026
Special inspection requirement — Chimneys and vents
BRIAN ILL
08/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/26/2026
Special inspection requirement — Air barrier — testing
BRIAN ILL
08/26/2026
Special inspection requirement — Maintenance information
BRIAN ILL
08/26/2026
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ILL
08/26/2026
Special inspection requirement — Structural Steel - Details
BRIAN ILL
08/26/2026
Special inspection requirement — Heating Systems
BRIAN ILL
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
08/26/2026
Special inspection requirement — Fenestration areas
BRIAN ILL
08/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
BRIAN ILL
08/26/2026
Special inspection requirement — Fenestration air leakage
BRIAN ILL
08/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/26/2026
Special inspection requirement — Masonry
BRIAN ILL
08/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
08/26/2026
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
08/26/2026
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
08/26/2026
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
08/26/2026
Special inspection requirement — Final
BRIAN ILL
08/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ILL
08/26/2026
Special inspection requirement — Insulation placement and R values
BRIAN ILL
08/26/2026
Special inspection requirement — Interior lighting power
BRIAN ILL
08/26/2026
Special inspection requirement — Ventilation and air distribution system
BRIAN ILL
08/26/2026
Special inspection requirement — Permanent certificate
BRIAN ILL
08/26/2026
Special inspection requirement — Metering
BRIAN ILL
08/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ILL
07/22/2026
Filed — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-P8
05/21/2026
Filed — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-P6
07/14/2025
Filed — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-P3
03/17/2025
Signed off — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-S1
02/27/2025
Signed off — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-S2
02/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/21/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01081255-I1
01/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/16/2024
Filed — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-P2
12/12/2024
Permit issued — Curb Cut
Q00951427-S2-CC
12/12/2024
Permit issued — Plumbing
Q00951427-S1-EW-SP
12/11/2024
Signed off — Alteration
INSTALL 8' CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00950202-I1
11/21/2024
Filed — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-P1
10/28/2024
Filed — New Building
INSTALL 18' SHARE DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00951427-S2
08/13/2024
Permit issued — General Construction
Q00951427-I1-GC
08/02/2024
Permit issued — Solar
Q01081255-I1-SL
07/31/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01081255-I1
07/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/10/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/06/2024
Permit issued — Sprinklers
Q00951427-S1-PL
04/30/2024
Permit issued — Construction Fence
Q00950202-I1-FN
04/29/2024
Permit issued — Foundation
Q00951427-I1-MS
04/29/2024
Permit issued — Earth Work
Q00951427-I1-ST
04/29/2024
Permit issued — Foundation
Q00951427-I1-GC
02/07/2024
Permit issued — Foundation
Q00951427-I1-GC
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJIN L. LIN12/12/2024
DOB NOWPlumbingSigned-offRALPH W. LANDOLFI JR.12/12/2024
DOB NOWGeneral ConstructionPermit IssuedJIN L. LIN08/13/2024
DOB NOWSolarSigned-offAMERGY SOLAR INC08/02/2024
DOB NOWSprinklersSigned-offWATSON'S PLBG, HTG, & BDG05/06/2024
DOB NOWConstruction FenceSigned-offJIN L. LIN04/30/2024
DOB NOWFoundationSigned-offJIN L. LIN04/29/2024
DOB NOWEarth WorkSigned-offJIN L. LIN04/29/2024
DOB NOWFoundationPermit IssuedJIN L. LIN04/29/2024
DOB NOWFoundationPermit IssuedJIN L. LIN02/07/2024
DOB NOWMechanical SystemsSigned-offJIN L. LIN02/07/2024
DOB NOWEarth WorkSigned-offJIN L. LIN02/06/2024
DOB NOWEarth WorkSigned-offJIN L. LIN02/06/2024
DOB NOWFull DemolitionSigned-offJIN L. LIN01/11/2024
DOB NOWConstruction FenceSigned-offJIN L. LIN12/19/2023
BISPLISSUEDPAL-MAR PLBG & HTG INC02/01/2019
BISOTISSUEDPAL-MAR PLUMBING&HEATING01/28/2019
1 project · most recent 07/22/2026
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2026Signed-offJIN SUN CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
A.O. Smith GCR-40 200 36,000 BTU · Water Heater ×18
Williamson GWA-100-N-T 100,000 BTU · Boiler ×18
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×108
Air King EB30BL 130 CFM · Kitchen Exhaust ×18
1 project · most recent 07/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/22/2026Signed-offWATSON'S PLBG, HTG, & BDGGas, Storm, Water/Sanitary
3 projects · most recent 02/03/2025
General Wiring
FiledStatusContractorScope
02/03/2025CompleteCL ELECTRICAL CORPGeneral Wiring
07/31/2024CompleteI.P. ELECTRIC INC—
07/08/2024CancelledPOWER SURGE ELECTRIC, INC—
2 projects · most recent 07/22/2026
Steel Masonry Concrete Wood
FiledStatusContractorScope
07/22/2026Signed-offRRP PLUMBING CORPSteel, Concrete, Masonry, Wood
03/15/2023——Steel, Masonry
1 project · most recent 07/22/2026
Earthwork
FiledStatusContractorScope
07/22/2026Signed-offRRP PLUMBING CORPEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/26/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
08/26/2026Fenestration and door U-factor and product ratingsBRIAN ILLenergy_progress
08/26/2026Air barrier - visual inspectionBRIAN ILLenergy_progress
08/26/2026Maintenance informationBRIAN ILLenergy_progress
08/26/2026Fenestration air leakageBRIAN ILLenergy_progress
08/26/2026MeteringBRIAN ILLenergy_progress
08/26/2026Electric vehicle service equipment requirementsBRIAN ILLenergy_progress
08/26/2026Permanent certificateBRIAN ILLenergy_progress
08/26/2026Ventilation and air distribution systemBRIAN ILLenergy_progress
08/26/2026Fenestration areasBRIAN ILLenergy_progress
08/26/2026Interior lighting powerBRIAN ILLenergy_progress
08/26/2026Insulation placement and R valuesBRIAN ILLenergy_progress
08/26/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
08/26/2026Duct leakage testing, insulation and designBRIAN ILLenergy_progress
08/26/2026FinalBRIAN ILLprogress
08/26/2026Footing and FoundationBRIAN ILLprogress
08/26/2026Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/26/2026Energy Code Compliance InspectionsBRIAN ILLprogress
08/26/2026Structural Steel - WeldingXIAOHONG ZHAOspecial
08/26/2026Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
08/26/2026Heating SystemsBRIAN ILLspecial
08/26/2026Mechanical SystemsBRIAN ILLspecial
08/26/2026Subgrade InspectionsXIAOHONG ZHAOspecial
08/26/2026Chimneys and ventsBRIAN ILLspecial
08/26/2026Structural Steel - DetailsBRIAN ILLspecial
Latest 25 of 150.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/24/2026Q00950202-I1Request digital key ↗
08/24/2026Q00947773-P1Request digital key ↗
08/24/2026Q00947773-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
12/19/2024421683020Open ↗
01/18/2019421928249Open ↗
▸BISWORK PERMIT APPLICATION2
02/05/2019421928249Open ↗
01/29/2019421928249Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram8
08/16/2026Q00951427-I1Open ↗
08/16/2026Q00951427-P8Open ↗
08/16/2026Q00951427-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/16/2026Q00951427-I1Open ↗
08/16/2026Q00951427-P8Open ↗
08/16/2026Q00951427-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00951427-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWSpecial Inspector Seal & Signature19
09/26/2026Q00951427-P8Open ↗
09/26/2026Q00951427-P8Open ↗
09/26/2026Q00951427-P8Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/26/2026Q00951427-P8Open ↗
09/26/2026Q00951427-P8Open ↗
09/23/2026Q00951427-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026Q00842474-I1Open ↗
08/24/2026Q00947773-P1Open ↗
08/24/2026Q00947773-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/29/2019421928249Open ↗
01/18/2019421928249Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/18/2019421928249Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/18/2019421928249Open ↗
▸Trade Schedules & Equipment12
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/16/2026Q00951427-P3Open ↗
08/16/2026Q00951427-P2Open ↗
08/16/2026Q00951427-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
11/11/2021421928249Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/18/2019421928249Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00947773-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00947773-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00947773-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00947773-I1Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist8
08/16/2026Q00951427-I1Open ↗
08/16/2026Q00951427-P8Open ↗
08/16/2026Q00951427-P3Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST2
11/13/2024440815361Open ↗
01/18/2019421928249Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00842474-I1Open ↗
08/13/2026Q00951427-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/13/2024440815361Open ↗
▸BISTenant Protection Plan and Notes1
01/18/2019421928249Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00951427-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00951427-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026Q00947773-I1Open ↗
08/24/2026Q00947773-P1Open ↗
08/15/2026Q00842474-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/18/2019421928249Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00947773-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/29/2019421928249Open ↗
01/18/2019421928249Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/11/2021421928249Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/11/2021421928249Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/11/2021421928249Open ↗
▸Inspections & Test Reports11
▸DOB NOWSOIL REPORT7
08/16/2026Q00951427-P8Open ↗
08/16/2026Q00951427-P4Open ↗
08/16/2026Q00951427-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00842474-I1Open ↗
08/13/2026Q00951427-I1Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/11/2021421928249Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00951427-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
06/06/2025440815361Open ↗
05/22/2025440815361Open ↗
▸BISFINAL1
11/11/2021421928249Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
11/11/2021421928249Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/18/2019421928249Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/12/2021421928249Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01081255-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction2
06/06/2025440815361Open ↗
05/22/2025440815361Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/11/2021421928249Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
01/18/2019421928249Open ↗
▸BISCOST AFFIDAVIT1
01/18/2019421928249Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
01/18/2019421928249Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/27/2023440815361Open ↗
▸Other Documents51
▸BISBPP - SUPPORTING DOCUMENTATION15
06/06/2025440815361Open ↗
06/06/2025440815361Open ↗
06/06/2025440815361Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProperty Ownership Certification10
08/24/2026Q00947773-P1Open ↗
08/24/2026Q00947773-I1Open ↗
08/16/2026Q00951427-P8Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/16/2026Q00951427-P8Open ↗
08/16/2026Q00951427-P5Open ↗
08/16/2026Q00951427-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial8
08/16/2026Q00951427-I1Open ↗
08/16/2026Q00951427-P8Open ↗
08/16/2026Q00951427-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStructure Photographs2
08/13/2026Q00947773-P1Open ↗
08/13/2026Q00947773-I1Open ↗
▸DOB NOWFinal Survey2
08/13/2026Q00951427-I1Open ↗
08/13/2026Q00842474-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/13/2024440815361Open ↗
▸BISPERMANENT CERTIFICATE1
11/11/2021421928249Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00947773-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00951427-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00947773-I1Open ↗