← Back
BuildNYC
Elevator apt, fireproof without stores
Arverne View
57-17 ROCKAWAY BEACH BOULEVARD · BIN 4590624
💬 Discuss this project
1974Year Built
19Stories
D3Building Class
R6Zoning
1,085,148 sfGross Floor Area
1,091Units
LL97 CoveredRent Stabilized581 Active Violations 577 unresolved · 4 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: HP Arverne Preservation Housing Company · 589,394 sf lot · 1.84 FAR built · Flood zone AE
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Building alteration and structural work2p · 1 filing · 6 docs
Floor 1Building alteration and structural work1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rand Engineering & Architecture110/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering & Arch203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Restorationspecialty_contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266110/28/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
02/09/2026
Signed off — Alteration
Q01070307-I1
02/19/2025
Permit issued — General Construction
Q01070307-I1-GC-CX
10/28/2024
Filed — Alteration
Q01070307-I1
09/13/2024
Special inspection requirement — Concrete - Cast-In-Place
James Vignola
09/13/2024
Special inspection requirement — Masonry
James Vignola
09/13/2024
Special inspection requirement — Post-installed Anchors
James Vignola
09/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Vignola
06/21/2024
Special inspection requirement — Final
James Vignola
12/19/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/19/2023
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/19/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/13/2024Concrete - Cast-In-PlaceJames Vignolaspecial
09/13/2024MasonryJames Vignolaspecial
09/13/2024Post-installed AnchorsJames Vignolaspecial
09/13/2024Structural Stability – Alterations of existing buildingsJames Vignolaspecial
06/21/2024FinalJames Vignolaprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01070307-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01070307-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01070307-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01070307-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01070307-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q01070307-I1Open ↗