← Back
Two family frame
57-26 79 AVENUE
QUEENS · BIN 4085853
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R4-1Zoning
1,972 sfGross Floor Area
2Units
Two family frame · Owner of record: BENAMY MANAGEMENT LLC · 2,450 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENAMY MANAGEMENT3207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2019$375K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAHMAL SABAHA PE CONSULTING ENGR808/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO PLBG AND HTG INCFire Protection407/08/2026
ARCO PLBG AND HTG INCPlumbing407/08/2026
RAE MGMT INCGeneral Contractor303/21/2026
ANNMARIE KHAN & ANDRE KHAGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519407/24/2023
Building Lifecycle
All (78)Filed (8)Permit Issued (10)Signed Off (3)Inspection (10)Objection (31)Special Inspection (16)
08/20/2026
Signed off — Alteration
Propose new plumbing fixtures throughout with related components. Filed in Conjunction with New Building Application # 421743616.
Q00227717-I1
08/17/2026
Filed — Alteration
Q01446779-I1
08/10/2026
Objection raised — Scope
08/04/2026
Signed off — Alteration
PROPOSE CONSTRUCTION FENCE AS PER PLANS. NO CHANGE TO USE BULK OR EGRESS.
Q00227759-I1
07/30/2026
Signed off — Alteration
Propose sprinkler system throughout with related components as per plans. No Change to use bulk or egress.
Q00269973-I1
07/13/2026
Objection resolved — Resolved
02/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/02/2025
Permit issued — Sprinklers
Q00269973-I1-EW-SP
06/02/2025
Permit issued — Plumbing
Q00227717-I1-PL
03/11/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
03/11/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/16/2024
Permit issued — Plumbing
Q00227717-I1-PL
08/17/2023
Permit issued — Construction Fence
Q00227759-I1-FN
08/03/2023
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/03/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
08/03/2023
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
08/03/2023
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
08/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/02/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/26/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2023
Filed — Alteration
Propose new plumbing fixtures throughout with related components. Filed in Conjunction with New Building Application # 421743616.
Q00227717-P2
06/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/09/2023
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
06/08/2023
Objection resolved — Addressed
05/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2023
Objection raised — Scope
05/12/2023
Filed — Alteration
Propose sprinkler system throughout with related components as per plans. No Change to use bulk or egress.
Q00269973-P1
05/11/2023
Filed — Alteration
Propose new plumbing fixtures throughout with related components. Filed in Conjunction with New Building Application # 421743616.
Q00227717-P1
05/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/05/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
05/05/2023
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
05/05/2023
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
05/05/2023
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
05/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
05/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/27/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/12/2023
Permit issued — Sprinklers
Q00269973-I1-EW-SP
10/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/07/2022
Permit issued — Plumbing
Q00227717-I1-PL
10/07/2022
Permit issued — Sprinklers
Q00269973-I1-EW-SP
09/24/2021
Permit issued — Plumbing
Q00227717-I1-PL
09/23/2021
Permit issued — Sprinklers
Q00269973-I1-EW-SP
09/10/2021
Permit issued — Construction Fence
Q00227759-I1-FN
12/04/2019
Objection raised — Admin
12/04/2019
Objection resolved — Addressed
12/04/2019
Objection raised — Scope
12/04/2019
Objection resolved — Addressed
12/04/2019
Objection raised — Zoning
12/02/2019
Filed — Alteration
CURB CUT APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 421743616. PROPOSE 8'-0" CURB CUT WITH 1'-6" SPLAY ON 79 AVENUE 95' FROM CYPRESS AVENUE.
Q00271429-I1
11/25/2019
Objection raised — Structural
11/25/2019
Objection resolved — Addressed
11/25/2019
Objection raised — Structural
11/25/2019
Objection resolved — Addressed
11/25/2019
Objection raised — Inspections
11/25/2019
Objection resolved — Addressed
11/25/2019
Objection raised — Scope
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC06/02/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC06/02/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC02/16/2024
DOB NOWConstruction FenceSigned-offANNMARIE KHAN & ANDRE KHA08/17/2023
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC04/12/2023
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC10/07/2022
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC10/07/2022
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC09/24/2021
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC09/23/2021
DOB NOWConstruction FenceSigned-offRAE MGMT INC09/10/2021
BIS—ISSUEDANNMARIE KHAN & ANDRE KHA09/12/2023
BIS—ISSUEDANNMARIE KHAN & ANDRE KHA07/13/2022
BIS—ISSUEDANNMARIE KHAN & ANDRE KHA03/01/2022
BIS—ISSUEDANNMARIE KHAN & ANDRE KHA10/18/2021
BIS—ISSUEDANNMARIE KHAN & ANDRE KHA10/18/2021
1 project · most recent 05/12/2023
FiledStatusContractorScope
05/12/2023Signed-offARCO PLBG AND HTG INC24 heads
1 project · most recent 07/24/2023
Gas Water/Sanitary
FiledStatusContractorScope
07/24/2023Signed-offARCO PLBG AND HTG INCGas, Water/Sanitary
1 project · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
1 project · most recent 11/19/2019
Fence
FiledStatusContractorScope
11/19/2019Signed-offANNMARIE KHAN & ANDRE KHAFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/11/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/27/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/03/2023HVAC insulation and sealing Younes Abouyaalaenergy_progress
08/03/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/03/2023Maintenance informationYounes Abouyaalaenergy_progress
08/03/2023HVAC and service water heating equipment Younes Abouyaalaenergy_progress
08/03/2023HVAC and service water heating system controls Younes Abouyaalaenergy_progress
08/03/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
08/03/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/09/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/09/2023Sprinkler SystemsYounes Abouyaalaspecial
05/05/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/05/2023Maintenance informationYounes Abouyaalaenergy_progress
05/05/2023HVAC insulation and sealing Younes Abouyaalaenergy_progress
05/05/2023HVAC and service water heating equipment Younes Abouyaalaenergy_progress
05/05/2023HVAC and service water heating system controls Younes Abouyaalaenergy_progress
05/05/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
05/05/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing3
08/24/2026Q00227717-P2Request digital key ↗
08/24/2026Q00227717-P1Request digital key ↗
08/24/2026Q00227717-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/15/2026Q00269973-I1Request digital key ↗
08/15/2026Q00269973-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026Q00227759-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/18/2026Q01446779-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00271429-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
05/11/2023421743616Open ↗
12/27/2022421743616Open ↗
08/04/2022421743616Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
03/06/2025421743616Open ↗
10/21/2021421743616Open ↗
10/21/2021421743616Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
12/06/2019421743616Open ↗
12/06/2019421743616Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/26/2020421743616Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/28/2022421743616Open ↗
▸BISZONING DIAGRAM1
03/16/2020421743616Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00227759-I1Open ↗
08/28/2026Q00271429-I1Open ↗
08/24/2026Q00269973-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/21/2021421743616Open ↗
03/19/2020421743616Open ↗
03/19/2020421743616Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00227717-P1Open ↗
09/02/2026Q00227717-P1Open ↗
08/23/2026Q00227717-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00227717-P1Open ↗
09/01/2026Q00269973-I1Open ↗
08/23/2026Q00227717-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
03/07/2020421743616Open ↗
02/26/2020421743616Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/21/2021421743616Open ↗
▸BISSTREET TREES SITE PLAN1
09/28/2022421743616Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/21/2021421743616Open ↗
02/26/2020421743616Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/27/2021421743616Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
10/21/2021421743616Open ↗
09/27/2021421743616Open ↗
▸DOB NOWHydrant Flow Test Letter2
08/15/2026Q00269973-I1Open ↗
08/15/2026Q00269973-P1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/19/2020421743616Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/21/2021421743616Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/27/2021421743616Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE4
12/27/2022421743616Open ↗
03/04/2020421743616Open ↗
01/06/2020421743616Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/21/2021421743616Open ↗
02/26/2020421743616Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
09/03/2023421743616Open ↗
08/30/2022421743616Open ↗
02/26/2020421743616Open ↗
▸BISBOROUGH INTAKE FORM2
03/06/2025421743616Open ↗
10/21/2021421743616Open ↗
▸Other Documents3
▸DOB NOWHydraulic Calculations2
08/13/2026Q00269973-I1Open ↗
08/13/2026Q00269973-P1Open ↗
▸BISPLOT DIAGRAM1
02/26/2020421743616Open ↗