57-30 58 AVENUE
QUEENS · BIN 4161735
💬 Discuss this project
1966Year Built
3Stories
W1Building Class
R4Zoning
511,684 sfGross Floor Area
1Units
LL97 Covered6 Open Violations 2 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 570,100 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 20 docs
Floor 3Under Construction2p · 2 filings · 20 docs
Floor 2Under Construction11p · 4 filings · 20 docs
Floor 1Under Construction18p · 3 filings · 20 docs
BasementUnder Construction3p · 3 filings · 20 docs
Sub-BasementUnder Construction1p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION2709/29/2026
NYC SCHOOL CONSTRUCTION AUTHORITY3907/15/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE 040203/22/2026
DEPARTMENT OF EDUCATION1603/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
DOE 0 040203/22/2026
DOE BENJAMIN N CARDOZ040103/22/2026
DOE BEN CARDOZO HS 040203/22/2026
BOARD OF ED Q415303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCON CORPGeneral Contractor1804/09/2026
F & S GENERAL CONSTRUCTIOGeneral Contractor807/08/2026
BEST NY CONSTRUCTION INCGeneral Contractor609/29/2026
A & A PLUMBING SYSTEMS INGeneral Contractor407/08/2026
CEDOMIR MARAElectrical303/21/2026
HEXAGON CONSTRUCTION & ELGeneral Contractor207/15/2026
PARALLEL PLBG & HTG CO INElectrical103/21/2026
RICHARDSON, WElectrical103/21/2026
A&A PLBG SYSTEMS, INCFire Protection107/08/2026
J & D CARRYING & CONSTRUCGeneral Contractor104/09/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
A & A PLUMBING SYSTEMS INPlumbing107/08/2026
FRANCIS RICHARDSElectrical103/21/2026
HEXAGON CONST & ELECL GRPElectrical103/22/2026
HOLDER, ANCILElectrical103/21/2026
LEVINSON & SANTORO ELEC CElectrical103/22/2026
PANTELIDIS, ALEXANDERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001503/13/2026
JPC LOGISTICS DBA JPCL EN351106/28/2022
Building Lifecycle
All (172)Filed (28)Permit Issued (30)Signed Off (1)Violation (60)Inspection (5)Objection (18)Special Inspection (30)
09/28/2026
Permit issued — Construction Fence
Q01255032-I1-FN
09/28/2026
Permit issued — Support of Excavation
Q01255108-I1-SE
07/16/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/14/2026
Permit issued — General Construction
Q07996873-I1-GC
07/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2026
Permit issued — Sprinklers
Q00814792-I1-EW-SP
06/01/2026
Special inspection requirement — Post-installed Anchors
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/14/2026
Permit issued — Sprinklers
Q00814792-I1-PL
05/07/2026
Filed — Alteration
CONVERT (3) SCIENCE PREP ROOMS INTO (1) SCIENCE PREP ROOM AND (2) SCIENCE LABS. INSTALL NEW PARTITIONS, MILLWORK, FLOOR AND CEILING FINISHES. REPLACE CEILING AND LIGHTING IN THE STUDENT DINING AND SERVING AREA.
Q01324121-S4
04/28/2026
Permit issued — General Construction
Q00814792-S1-GC
04/28/2026
Special inspection requirement — Structural Steel - Details
04/28/2026
Special inspection requirement — Final
04/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/28/2026
Special inspection requirement — Structural Steel - Welding
04/24/2026
Permit issued — Support of Excavation
Q01288525-I1-SE
04/24/2026
Permit issued — Sidewalk Shed
Q01312197-I1-SH
04/16/2026
Permit issued — General Construction
Q00604550-I1-GC-CX
04/15/2026
Permit issued — Construction Fence
Q01288520-I1-FN
03/27/2026
Objection resolved — Addressed
03/18/2026
Violation issued (FDNY_NOV, closed)
03/13/2026
Filed — Alteration
PLUMBING & SPRINKLER WORK PAA.
Q00814792-P5
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
03/13/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/13/2026
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
03/12/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/12/2026
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
02/20/2026
Permit issued — Support of Excavation
Q01255108-I1-SE
02/17/2026
Permit issued — Construction Fence
Q01255032-I1-FN
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
01/09/2026
Objection raised — Other
01/09/2026
Objection raised — Other
01/06/2026
Objection raised — Other
01/06/2026
Objection raised — Other
01/06/2026
Objection raised — Other
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/05/2026
Objection resolved — Addressed
12/29/2025
Permit issued — Support of Excavation
Q01255108-I1-SE
12/23/2025
Filed — Alteration
CONVERT (3) SCIENCE PREP ROOMS INTO (1) SCIENCE PREP ROOM AND (2) SCIENCE LABS. INSTALL NEW PARTITIONS, MILLWORK, FLOOR AND CEILING FINISHES. REPLACE CEILING AND LIGHTING IN THE STUDENT DINING AND SERVING AREA.
Q01324121-S3
12/23/2025
Filed — Alteration
CONVERT (3) SCIENCE PREP ROOMS INTO (1) SCIENCE PREP ROOM AND (2) SCIENCE LABS. INSTALL NEW PARTITIONS, MILLWORK, FLOOR AND CEILING FINISHES. REPLACE CEILING AND LIGHTING IN THE STUDENT DINING AND SERVING AREA.
Q01324121-S1
12/23/2025
Filed — Alteration
Remove and replace three drinking fountain. Remove (2) WC and (1) Lav and connected piping, and replace with (1) WC, (1) Urinal, and (1) Lav with new roughing.
Q01331603-S1
12/19/2025
Filed — Alteration
CONVERT (3) SCIENCE PREP ROOMS INTO (1) SCIENCE PREP ROOM AND (2) SCIENCE LABS. INSTALL NEW PARTITIONS, MILLWORK, FLOOR AND CEILING FINISHES. REPLACE CEILING AND LIGHTING IN THE STUDENT DINING AND SERVING AREA.
Q01324121-I1
12/19/2025
Filed — Alteration
Remove and replace three drinking fountain. Remove (2) WC and (1) Lav and connected piping, and replace with (1) WC, (1) Urinal, and (1) Lav with new roughing.
Q01331603-I1
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
12/19/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
12/17/2025
Special inspection requirement — Lighting controls
12/17/2025
Special inspection requirement — Shutoff dampers
12/17/2025
Special inspection requirement — Maintenance information
12/17/2025
Special inspection requirement — Post-installed Anchors
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/17/2025
Special inspection requirement — Maintenance information
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedBEST NY CONSTRUCTION INC09/28/2026
DOB NOWSupport of ExcavationPermit IssuedBEST NY CONSTRUCTION INC09/28/2026
DOB NOWGeneral ConstructionPermit IssuedHEXAGON CONSTRUCTION & EL07/14/2026
DOB NOWSprinklersPermit IssuedA&A PLBG SYSTEMS, INC06/05/2026
DOB NOWSprinklersPermit IssuedA & A PLUMBING SYSTEMS IN05/14/2026
DOB NOWGeneral ConstructionPermit IssuedA & A PLUMBING SYSTEMS IN04/28/2026
DOB NOWSupport of ExcavationPermit IssuedA & A PLUMBING SYSTEMS IN04/24/2026
DOB NOWSidewalk ShedPermit IssuedA & A PLUMBING SYSTEMS IN04/24/2026
DOB NOWGeneral ConstructionPermit IssuedF & S GENERAL CONSTRUCTIO04/16/2026
DOB NOWConstruction FencePermit IssuedA & A PLUMBING SYSTEMS IN04/15/2026
DOB NOWSupport of ExcavationPermit IssuedBEST NY CONSTRUCTION INC02/20/2026
DOB NOWConstruction FencePermit IssuedBEST NY CONSTRUCTION INC02/17/2026
DOB NOWSupport of ExcavationPermit IssuedBEST NY CONSTRUCTION INC12/29/2025
DOB NOWConstruction FencePermit IssuedJ D CARRYING CONSTRUC12/11/2025
DOB NOWConstruction FencePermit IssuedBEST NY CONSTRUCTION INC11/14/2025
DOB NOWGeneral ConstructionPermit IssuedHEXAGON CONSTRUCTION EL10/16/2025
DOB NOWMechanical SystemsPermit IssuedF & S GENERAL CONSTRUCTIO03/26/2025
DOB NOWConstruction FenceSigned-offROCON CORP10/03/2024
DOB NOWGeneral ConstructionPermit IssuedF & S GENERAL CONSTRUCTIO04/18/2024
DOB NOWSidewalk ShedSigned-offROCON CORP04/04/2024
DOB NOWGeneral ConstructionPermit IssuedROCON CORP03/19/2024
DOB NOWMechanical SystemsPermit IssuedF & S GENERAL CONSTRUCTIO07/24/2023
DOB NOWSidewalk ShedSigned-offROCON CORP05/01/2023
DOB NOWGeneral ConstructionPermit IssuedROCON CORP05/01/2023
DOB NOWSidewalk ShedSigned-offROCON CORP04/04/2023
DOB NOWSidewalk ShedSigned-offROCON CORP03/20/2023
DOB NOWGeneral ConstructionPermit IssuedROCON CORP05/14/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC05/14/2022
DOB NOWConstruction FenceSigned-offROCON CORP04/04/2022
DOB NOWConstruction FenceSigned-offROCON CORP03/23/2022
BISOTISSUEDROCON CORP03/26/2026
BISOTISSUEDROCON CORP03/26/2026
BISMHISSUEDROCON CORP03/26/2026
BISPLISSUEDROCON CORP05/01/2025
BISOTISSUEDROCON CORP03/19/2025
BISOTISSUEDROCON CORP03/19/2025
BISOTISSUEDROCON CORP03/19/2025
BISMHISSUEDROCON CORP03/19/2025
BISPLISSUEDVARSITY PLBG AND HTG INC01/22/2025
BISPLISSUEDROCON CORP05/08/2024
+ 40 more permits on file
2 projects · most recent 06/28/2022
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/28/2022——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PKA-A24KA7.TH 24,000 BTU · Condensing Unit ×1
PUZ-A24NKA7 24,000 BTU · Heat Pump Outdoor ×1
03/18/2022Permit IssuedROCON CORPHeating Systems
Heating
Burnham Burnham 2L800 Boiler ×1
1 project · most recent 03/13/2026
Sprinkler System
FiledStatusContractorScope
03/13/2026Permit IssuedA&A PLBG SYSTEMS, INCSprinkler System
2 projects · most recent 03/13/2026
Water/Sanitary
FiledStatusContractorScope
03/13/2026Permit IssuedA & A PLUMBING SYSTEMS INWater/Sanitary
12/23/2025——Water/Sanitary
25 projects · most recent 05/29/2026
General Wiring Lighting
FiledStatusContractorScope
05/29/2026CompletePRECISION ELECL CONT CORPGeneral Wiring
05/05/2026CompleteA & S ELECTRIC INC.—
04/10/2026Permit IssuedMNBC ELECTRICAL CORP—
03/23/2026CompleteA & S ELECTRIC INC.—
03/18/2026Permit IssuedWILLDAN ELECTRICAL OF NYLighting
02/04/2026CompleteCORE ELECTRIC MEP INDS LLGeneral Wiring
01/12/2026CompleteA & S ELECTRIC INC.—
12/18/2025Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
04/11/2025CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
04/07/2025CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
03/27/2025CompleteGEMINI ELECTRIC CO., INC.—
09/11/2024CompleteANCO ELECTL CONTCTNG INC—
06/28/2024CompleteGEMINI ELECTRIC CO., INC.—
05/10/2024Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
03/19/2024CompleteANCO ELECTL CONTCTNG INC—
2 projects · most recent 03/13/2026
FiledStatusContractorScope
03/13/2026Permit IssuedA&A PLBG SYSTEMS, INC1 scope_items
10/15/2025Permit IssuedBEST NY CONSTRUCTION INC2 scope_items
4 projects · most recent 11/13/2025
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
11/13/2025Permit IssuedA & A PLUMBING SYSTEMS INSidewalk Shed
10/16/2025Permit IssuedA & A PLUMBING SYSTEMS INFence
07/22/2025Permit IssuedBEST NY CONSTRUCTION INCFence
06/08/2023——Scaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/16/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
06/01/2026Post-installed Anchors—special
05/18/2026Structural Stability – Alterations of existing buildings—special
04/28/2026Structural Steel - Details—special
04/28/2026Final—progress
04/28/2026Structural Steel - Welding—special
04/28/2026Structural Steel - High Strength Bolting—special
03/13/2026Post-installed AnchorsNELSON LOPEZspecial
03/13/2026Sprinkler SystemsNELSON LOPEZspecial
03/13/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/12/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/12/2026Sprinkler SystemsNELSON LOPEZspecial
03/12/2026Post-installed AnchorsNELSON LOPEZspecial
01/12/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
01/06/2026HVAC-R and service water piping design and insulation—energy_progress
12/19/2025Post-installed AnchorsNELSON LOPEZspecial
12/19/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
12/19/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
12/17/2025Shutoff dampers—energy_progress
12/17/2025Fire-Resistant Penetrations and Joints—special
12/17/2025Interior lighting power—energy_progress
12/17/2025Lighting controls—energy_progress
12/17/2025Maintenance information—energy_progress
12/17/2025Fire-Resistant Penetrations and Joints—special
12/17/2025Energy Code Compliance Inspections—progress
12/17/2025Post-installed Anchors—special
Latest 25 of 79.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Benjamin N. Cardozo High SchooleEducation—
Project Q01288525 Alteration · Permit Entire · 10/16/2025
Benjamin N. Cardozo High SchoolEducation—
Project Q00766157 Alteration · Approved · 06/28/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 212 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
08/26/2026Q00686840-I1Request digital key ↗
08/26/2026Q00686699-I1Request digital key ↗
08/26/2026Q00766157-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/21/2026Q01098412-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
08/10/2009420056049Open ↗
08/03/2009420051641Open ↗
08/03/2009420051641Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
12/11/2009420051641Open ↗
07/28/2009420056049Open ↗
07/21/2009420051641Open ↗
▸Seals & Professional Certifications66
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/24/2026Q00879856-I1Open ↗
08/24/2026Q00604550-P1Open ↗
08/24/2026Q00604550-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/29/2026Q01331603-S1Open ↗
08/29/2026Q01331603-S1Open ↗
08/25/2026Q00766157-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026Q00686699-I1Open ↗
08/31/2026Q00814792-I1Open ↗
08/29/2026Q01331603-S1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/04/2010420051641Open ↗
07/28/2009420056049Open ↗
07/21/2009420051641Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/11/2009420051641Open ↗
07/21/2009420051641Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/28/2009420051641Open ↗
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/18/2026Q01312197-I1Open ↗
08/13/2026Q01255032-I1Open ↗
08/13/2026Q00879856-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026Q07996873-I1Open ↗
08/13/2026Q00686699-S1Open ↗
08/13/2026Q00686699-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/28/2009420056049Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/21/2009420051641Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00604550-I1Open ↗
▸Approvals, Objections & Sign-offs63
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
08/18/2026Q07996873-I1Open ↗
08/18/2026Q07996873-P1Open ↗
08/18/2026Q01288525-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)27
08/18/2026Q07996873-P1Open ↗
08/18/2026Q07996873-I1Open ↗
08/18/2026Q00814792-P5Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/18/2026Q00814792-I1Open ↗
08/18/2026Q00814792-S1Open ↗
08/13/2026Q00604550-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/28/2009420056049Open ↗
07/21/2009420051641Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026Q00604550-I1Open ↗
08/13/2026Q00686840-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/04/2010420051641Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/04/2010420051641Open ↗
07/21/2009420051641Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
07/28/2009420056049Open ↗
07/21/2009420051641Open ↗
▸BISADDITIONAL INFORMATION1
07/21/2009420051641Open ↗
▸Other Documents32
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
08/18/2026Q07996873-I1Open ↗
08/18/2026Q00814792-I1Open ↗
08/18/2026Q00814792-P5Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/18/2026Q01288525-I1Open ↗
08/13/2026Q01255108-I1Open ↗
▸BISPLOT DIAGRAM1
07/21/2009420051641Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026Q00686840-I1Open ↗