← Back
BuildNYC
Primarily 4 family with 1 store or office
57-34 61ST STREET
QUEENS · Maspeth · BIN 4060114
💬 Discuss this project
1915Year Built
2Stories
S4Building Class
R4-1Zoning
2,731 sfGross Floor Area
5Units
1 Active Violation ▸
Primarily 4 family with 1 store or office · 2,500 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
AtticSprinkler and plumbing work for buildingUnder Construction17p · 1 filing · 20 docs
Floor 2Sprinkler and plumbing work for buildingUnder Construction18p · 1 filing · 20 docs
Floor 1Sprinkler and plumbing work for buildingUnder Construction17p · 1 filing · 20 docs
CellarSprinkler and plumbing work for buildingUnder Construction22p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC Engineering1110/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC Engineering1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
High Quality ConstructionGeneral Contractor104/09/2026
Mercury Building AssociatesGeneral Contractor109/10/2026
American Standard P&H CororpPlumbing107/08/2026
American Standard PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABC Engineering1515410/02/2026
Building Lifecycle
All (60)Filed (11)Permit Issued (4)Violation (3)Inspection (4)Objection (8)Special Inspection (30)
10/02/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P9
10/02/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P8
09/25/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
09/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
HUI ZENG
09/25/2026
Special inspection requirement — Interior lighting power
HUI ZENG
09/25/2026
Special inspection requirement — Fenestration air leakage
HUI ZENG
09/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
HUI ZENG
09/25/2026
Special inspection requirement — Air barrier - visual inspection
HUI ZENG
09/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
09/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
09/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
09/25/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
09/25/2026
Special inspection requirement — Sprinkler Systems
HUI ZENG
09/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
09/25/2026
Special inspection requirement — Fenestration areas
HUI ZENG
09/09/2026
Permit issued — General Construction
Q00950065-I1-GC
07/20/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P7
07/20/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Addressed
06/10/2026
Objection raised — Cost
06/09/2026
Objection raised — Other
06/09/2026
Objection raised — Other
06/09/2026
Objection raised — Other
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P5
05/20/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P6
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
05/07/2026
Special inspection requirement — Fenestration air leakage
HUI ZENG
05/07/2026
Special inspection requirement — Fenestration areas
HUI ZENG
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
05/07/2026
Special inspection requirement — Interior lighting power
HUI ZENG
05/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
HUI ZENG
05/07/2026
Special inspection requirement — Air barrier - visual inspection
HUI ZENG
05/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
HUI ZENG
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
05/07/2026
Special inspection requirement — Sprinkler Systems
HUI ZENG
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
05/04/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/16/2026
Violation issued (ECB, closed)
Construction
04/16/2026
Violation issued (ECB, closed)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/21/2026
Special inspection requirement — Fenestration air leakage
HUI ZENG
01/21/2026
Special inspection requirement — Sprinkler Systems
HUI ZENG
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
12/31/2025
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P4
12/31/2025
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P3
11/05/2025
Permit issued — Sprinklers
Q00950065-S1-PL
11/05/2025
Permit issued — Plumbing
Q00950065-S1-EW-SP
11/03/2025
Permit issued — General Construction
Q00950065-I1-GC
03/20/2025
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P1
03/20/2025
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-P2
08/19/2024
Objection resolved — Addressed
08/07/2024
Objection raised — Scope
07/24/2024
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-S1
03/04/2024
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK (ATTIC ONLY) AND PLUMBING WORK (CEL, 1ST-2ND FL) OF EXISTING TWO STORY W/ ATTIC RESIDENTIAL & COMMERCIAL BUILDING.
Q00950065-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMercury Building Associates09/09/2026
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp11/05/2025
DOB NOWSprinklersPermit IssuedAmerican Standard Plumbing11/05/2025
DOB NOWGeneral ConstructionPermit IssuedHigh Quality Construction11/03/2025
1 project · most recent 10/02/2026
Sprinkler System
FiledStatusContractorScope
10/02/2026Permit IssuedAmerican Standard PlumbingSprinkler System
1 project · most recent 10/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/02/2026Permit IssuedAmerican Standard P&HGas, Water/Sanitary
2 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026Permit IssuedJ Y ElectricGeneral Wiring
05/18/2021CompleteWilldan Electrical of NY—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
09/25/2026Energy Code Compliance InspectionsHUI ZENGprogress
09/25/2026Fire-Resistance Rated ConstructionHUI ZENGprogress
09/25/2026Interior lighting powerHUI ZENGenergy_progress
09/25/2026Fenestration air leakageHUI ZENGenergy_progress
09/25/2026Fenestration and door U-factor and product ratingsHUI ZENGenergy_progress
09/25/2026Air barrier - visual inspectionHUI ZENGenergy_progress
09/25/2026HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
09/25/2026HVAC-R and service water heating equipmentHUI ZENGenergy_progress
09/25/2026HVAC-R and service water heating system controlsHUI ZENGenergy_progress
09/25/2026Energy Code Compliance InspectionsHUI ZENGprogress
09/25/2026Sprinkler SystemsHUI ZENGspecial
09/25/2026Fire-Resistant Penetrations and JointsHUI ZENGspecial
09/25/2026Fenestration areasHUI ZENGenergy_progress
05/07/2026HVAC-R and service water heating equipmentHUI ZENGenergy_progress
05/07/2026Fenestration air leakageHUI ZENGenergy_progress
05/07/2026Fenestration areasHUI ZENGenergy_progress
05/07/2026Energy Code Compliance InspectionsHUI ZENGprogress
05/07/2026Interior lighting powerHUI ZENGenergy_progress
05/07/2026Fenestration and door U-factor and product ratingsHUI ZENGenergy_progress
05/07/2026Air barrier - visual inspectionHUI ZENGenergy_progress
05/07/2026Fire-Resistance Rated ConstructionHUI ZENGprogress
05/07/2026HVAC-R and service water heating system controlsHUI ZENGenergy_progress
05/07/2026HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
05/07/2026Energy Code Compliance InspectionsHUI ZENGprogress
05/07/2026Sprinkler SystemsHUI ZENGspecial
Latest 25 of 59.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q00950065-P2Request digital key ↗
08/20/2026Q00950065-P1Request digital key ↗
08/20/2026Q00950065-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
10/04/2026Q00950065-P8Open ↗
10/04/2026Q00950065-P9Open ↗
08/20/2026Q00950065-P7Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
10/04/2026Q00950065-P8Open ↗
10/04/2026Q00950065-P8Open ↗
10/04/2026Q00950065-P9Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/04/2026Q00950065-P8Open ↗
10/04/2026Q00950065-P9Open ↗
08/20/2026Q00950065-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
10/04/2026Q00950065-P9Open ↗
09/01/2026Q00950065-P6Open ↗
08/30/2026Q00950065-S1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
10/04/2026Q00950065-P8Open ↗
10/04/2026Q00950065-P9Open ↗
08/20/2026Q00950065-P2Open ↗
Showing 3 of 10 on file for this type