← Back
Two family frame
57-39 79 AVENUE
QUEENS · BIN 4085846
💬 Discuss this project
1910Year Built
4Stories
B2Building Class
R4-1Zoning
4,746 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 9,741 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIK MANAGEMENT CONSTRUCTION503/22/2026
OWNER OF 57-39 COOPER AVE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EOC-NY102/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MMSR CONSULTING GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VIK MANAGEMENT CONSTRUCTIGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EOC-NY6548202/22/2023
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (3)
03/29/2023
Signed off — Alteration
Q00832569-I1
03/01/2023
Permit issued — General Construction
Q00832569-I1-GC
02/22/2023
Filed — Alteration
Q00832569-I1
02/22/2023
Special inspection requirement — Post-installed Anchors
David Merabyan
02/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
02/21/2023
Special inspection requirement — Final
David Merabyan
02/06/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2002
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offVIK MANAGEMENT CONSTRUCTI03/01/2023
BIS—ISSUEDV.I.K_CONTR.10/17/2005
BIS—ISSUEDV.I.K_CONTR.04/21/2005
BIS—ISSUEDV.I.K_CONTR.09/02/2003
BIS—ISSUEDV.I.K_CONTR.05/29/2003
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
02/22/2023Post-installed AnchorsDavid Merabyanspecial
02/21/2023Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
02/21/2023FinalDavid Merabyanprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026Q00832569-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00832569-I1Open ↗
09/01/2026Q00832569-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026Q00832569-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00832569-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026Q00832569-I1Open ↗