P.S. 221 the North Hills School
57-40 MARATHON PARKWAY · BIN 4171759
💬 Discuss this project
1964Year Built
3Stories
W1Building Class
R3-2Zoning
75,600 sfGross Floor Area
0Units
LL97 Covered4 Open Violations 1 unresolved · 3 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 102,500 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof44p · 3 filings · 20 docs
Floor 234p · 2 filings · 20 docs
Floor 134p · 2 filings · 20 docs
Basement1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION209/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY2707/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION303/22/2026
DOE 040203/22/2026
DEPT OF EDUCATION P.S.221203/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
PS 221 DOE1403/22/2026
DEPT. OF EDUCATION 0103/22/2026
BOARD OF EDUCATION Q 221103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROHAN ENGINEERING, PC106/09/2026
NYC SCA404/22/2026
AME SERVICES INC405/21/2024
NYC SCHOOL CONSTRUCTION AUTHORITY103/14/2023
NYCSCA103/13/2023
SCA110/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY603/21/2026
AME SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARMY CONSTRUCTION LLCGeneral Contractor2407/08/2026
CHAPMAN & EVANS INCGeneral Contractor407/08/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
CEDOMIR MARAElectrical103/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
CREAMER ENVIRONMENTAL INCGeneral Contractor106/28/2026
MAR-SAL PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400904/22/2026
Building Lifecycle
All (111)Filed (12)Permit Issued (17)Signed Off (3)Violation (47)Inspection (2)Objection (6)Special Inspection (24)
06/26/2026
Permit issued — Construction Fence
Q01410822-I1-FN
06/09/2026
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE FOR SOIL REMIDIATION
Q01410822-I1
05/13/2026
Violation issued (ECB, open)
Construction
05/13/2026
Violation issued (ECB, open)
Construction
05/13/2026
Violation issued (ECB, open)
Construction
04/22/2026
Filed — Alteration
Remove & replace Existing Windows, total Roof and Parapet replacement, Masonry Repairs thruought and replace roof top bulkhead doors.
Q00841912-P1
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
04/22/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
04/22/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
04/22/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
04/22/2026
Special inspection requirement — Final
NELSON LOPEZ
12/30/2025
Signed off — Alteration
Filing for the installation of construction fence on behalf of contractor
Q00913267-I1
10/30/2025
Permit issued — Mechanical Systems
Q00841912-S1-MS
06/23/2025
Signed off — Alteration
Filing for the installation of pipe scaffolding on behalf of contractor
Q00912378-I1
06/02/2025
Signed off — Alteration
Q00917911-I1
02/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2024
Permit issued — Mechanical Systems
Q00841912-S1-MS
11/05/2024
Permit issued — General Construction
Q00841912-I1-ST
11/05/2024
Permit issued — General Construction
Q00841912-I1-GC
11/05/2024
Permit issued — General Construction
Q00841912-S4-GC
10/08/2024
Permit issued — Supported Scaffold
Q00912378-I1-SF
10/08/2024
Permit issued — Sidewalk Shed
Q00917911-I1-SH
09/06/2024
Permit issued — Construction Fence
Q00913267-I1-FN
05/21/2024
Filed — Alteration
Filing for the installation of pipe scaffolding on behalf of contractor
Q00912378-P1
05/21/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2024
Permit issued — Plumbing
Q00841912-S3-PL
01/09/2024
Permit issued — Mechanical Systems
Q00841912-S1-MS
11/09/2023
Permit issued — General Construction
Q00841912-I1-ST
11/09/2023
Permit issued — Structural
Q00841912-I1-GC
11/09/2023
Permit issued — General Construction
Q00841912-S4-GC
10/10/2023
Permit issued — Sidewalk Shed
Q00917911-I1-SH
10/06/2023
Permit issued — Supported Scaffold
Q00912378-I1-SF
09/05/2023
Permit issued — Construction Fence
Q00913267-I1-FN
08/30/2023
Filed — Alteration
Filing for the installation of construction fence on behalf of contractor
Q00913267-I1
08/29/2023
Filed — Alteration
Filing for the installation of pipe scaffolding on behalf of contractor
Q00912378-I1
08/29/2023
Filed — Alteration
Q00917911-I1
03/27/2023
Objection raised — Other
03/27/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Other
03/24/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Other
03/24/2023
Objection resolved — Addressed
03/14/2023
Filed — Alteration
Remove & replace Existing Windows, total Roof and Parapet replacement, Masonry Repairs thruought and replace roof top bulkhead doors.
Q00841912-S4
03/14/2023
Filed — Alteration
Remove & replace Existing Windows, total Roof and Parapet replacement, Masonry Repairs thruought and replace roof top bulkhead doors.
Q00841912-S1
03/13/2023
Filed — Alteration
Remove & replace Existing Windows, total Roof and Parapet replacement, Masonry Repairs thruought and replace roof top bulkhead doors.
Q00841912-S3
03/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
03/13/2023
Special inspection requirement — Exterior lighting power
NELSON LOPEZ
03/13/2023
Special inspection requirement — Lighting controls
NELSON LOPEZ
03/10/2023
Filed — Alteration
Remove & replace Existing Windows, total Roof and Parapet replacement, Masonry Repairs thruought and replace roof top bulkhead doors.
Q00841912-I1
03/10/2023
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/09/2023
Special inspection requirement — Energy Code Compliance Inspections
03/09/2023
Special inspection requirement — Post-installed Anchors
11/17/2022
Filed — Alteration
Q221- remove and replace existing A/A units to facilitate the Roofing work being done at existing school. as per plans filed herewith
Q08039734-I1
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedCREAMER ENVIRONMENTAL INC06/26/2026
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS10/30/2025
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS12/19/2024
DOB NOWGeneral ConstructionSigned-offARMY CONSTRUCTION LLC11/05/2024
DOB NOWGeneral ConstructionPermit IssuedARMY CONSTRUCTION LLC11/05/2024
DOB NOWGeneral ConstructionPermit IssuedARMY CONSTRUCTION LLC11/05/2024
DOB NOWSupported ScaffoldSigned-offARMY CONSTRUCTION LLC10/08/2024
DOB NOWSidewalk ShedSigned-offARMY CONSTRUCTION LLC10/08/2024
DOB NOWConstruction FenceSigned-offARMY CONSTRUCTION LLC09/06/2024
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC02/20/2024
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS01/09/2024
DOB NOWGeneral ConstructionSigned-offARMY CONSTRUCTION LLC11/09/2023
DOB NOWStructuralPermit IssuedARMY CONSTRUCTION LLC11/09/2023
DOB NOWGeneral ConstructionPermit IssuedARMY CONSTRUCTION LLC11/09/2023
DOB NOWSidewalk ShedSigned-offARMY CONSTRUCTION LLC10/10/2023
DOB NOWSupported ScaffoldSigned-offARMY CONSTRUCTION LLC10/06/2023
DOB NOWConstruction FenceSigned-offARMY CONSTRUCTION LLC09/05/2023
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY03/16/2017
BISOTISSUEDBRONX BASE BUILDERS LTD01/04/2013
BISPLISSUEDWITTMANN PLUMBING ASSOCIATES INC06/13/2006
BISOTISSUEDGAZEBO CONTRACTING CORPORATION06/13/2006
BISOTISSUEDGAZEBO CONTRACTING CORPORATION06/13/2006
BISPLISSUEDA BERWIND PLUMBING & HEATING CO11/21/2003
BISOTISSUEDPHOENIX SERVICES CORPORATION08/05/2003
BISOTISSUEDLOBO CONSTRUCTION SERVICES INC07/29/2002
BISEQISSUEDPHOENIX SERVICES CORPORATION03/13/2002
BISPLISSUEDA BERWIND PLUMBING & HEATING CO01/23/2002
BISOTISSUEDPHOENIX SERVICES CORPORATION01/23/2002
BISEQISSUEDSPRING SCAFFOLDING12/24/2001
BISEQISSUEDMANHATTAN DEMOLITION10/31/2001
BISFBISSUEDRICHARD MORTMAN12/07/1995
BISPLISSUEDGEORGE BASSOLINO INCORPORATED05/27/1993
BISFBISSUEDDIERKS HTG CO INC08/10/1992
2 projects · most recent 04/22/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026Signed-offCHAPMAN & EVANS INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PKA-A30KA7 30,000 BTU · Vrf Indoor ×1
PUZ-A30NHA7 30,000 BTU · Condensing Unit ×1
11/17/2022——Air Conditioning Systems
Cooling
Mitsubishi Electric ACC-1 30 BTU · Split System ×1
1 project · most recent 04/22/2026
Storm
FiledStatusContractorScope
04/22/2026Permit IssuedMAR-SAL PLBG & HTG, INCStorm
15 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026Permit IssuedTELECOMMUNICATION ELEC COGeneral Wiring
02/12/2026CompleteCHARAN ELEC'L ENTERP'S IN—
07/08/2025Permit IssuedEVEREST ELECTRIC CORPGeneral Wiring
02/14/2024CompleteHIGH VOLT ELEC CORP. OFGeneral Wiring
01/12/2024CompleteANCO ELECTL CONTCTNG INC—
11/08/2023Permit IssuedSTANCO SYSTEM ELEC'L CONT—
10/06/2023Permit IssuedSTANCO SYSTEM ELEC'L CONT—
07/19/2023CompleteCHARAN ELEC'L ENTERP'S IN—
12/28/2022CompleteCHARAN ELEC'L ENTERP'S IN—
08/19/2022CompleteABM ELECTRIC, INCGeneral Wiring
03/23/2020CompleteCHARAN ELEC'L ENTERP'S IN—
01/16/2019CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
10/29/2018CompleteCHARAN ELEC'L ENTERP'S IN—
06/05/2018CompleteCHARAN ELEC'L ENTERP'S IN—
01/16/2018CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 04/22/2026
Concrete Steel Masonry
FiledStatusContractorScope
04/22/2026Signed-offCHAPMAN & EVANS INCSteel, Concrete, Masonry
11/17/2022——Concrete
1 project · most recent 06/09/2026
Fence
FiledStatusContractorScope
06/09/2026Permit IssuedCREAMER ENVIRONMENTAL INCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/22/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/22/2026Post-installed AnchorsNELSON LOPEZspecial
04/22/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
04/22/2026Mechanical SystemsNELSON LOPEZspecial
04/22/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
04/22/2026Maintenance informationNELSON LOPEZenergy_progress
04/22/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
04/22/2026Fire-Resistance Rated ConstructionNELSON LOPEZprogress
04/22/2026FinalNELSON LOPEZprogress
05/21/2024Post-installed AnchorsNELSON LOPEZspecial
03/13/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/13/2023Exterior lighting powerNELSON LOPEZenergy_progress
03/13/2023Lighting controlsNELSON LOPEZenergy_progress
03/10/2023Post-installed AnchorsNELSON LOPEZspecial
03/10/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/09/2023Fire-Resistant Penetrations and Joints—special
03/09/2023Energy Code Compliance Inspections—progress
03/09/2023Post-installed Anchors—special
11/15/2022Construction Operations Influencing Adjacent StructuresNELSON LOPEZspecial
11/15/2022Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
11/15/2022MasonryNELSON LOPEZspecial
10/13/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
10/13/2022MasonryNELSON LOPEZspecial
08/08/2022FinalNELSON LOPEZprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
North Hills WolvesEducation—
Project Q01410822 Alteration · Permit Entire · 06/09/2026
P.S. 221 - QueensEducation—
Project Q08039734 Alteration · Incomplete · 11/17/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026Q00789335-I1Request digital key ↗
08/25/2026Q08039734-S1Request digital key ↗
08/25/2026Q08039734-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026Q00912378-I1Open ↗
08/24/2026Q00912378-P1Open ↗
08/24/2026Q00917911-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00841912-S3Open ↗
09/01/2026Q00912378-P1Open ↗
08/29/2026Q00841912-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q00841912-S4Open ↗
08/22/2026Q00841912-P1Open ↗
08/22/2026Q00841912-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/16/2026Q01410822-I1Open ↗
08/13/2026Q00913267-I1Open ↗
08/13/2026Q00917911-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026Q00841912-S1Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/24/2026Q00912378-P1Open ↗
08/24/2026Q00912378-I1Open ↗
08/24/2026Q00917911-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/17/2026Q00841912-P1Open ↗
08/16/2026Q01410822-I1Open ↗
08/13/2026Q00841912-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/17/2026Q00841912-S1Open ↗
08/13/2026Q00841912-S3Open ↗
08/13/2026Q00912378-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026Q00841912-S3Open ↗
08/13/2026Q00841912-S4Open ↗
08/13/2026Q00841912-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents15
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal12
08/17/2026Q00841912-P1Open ↗
08/16/2026Q01410822-I1Open ↗
08/13/2026Q00917911-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/13/2026Q00912378-I1Open ↗
08/13/2026Q00917911-I1Open ↗
08/13/2026Q00913267-I1Open ↗