← Back
One family attached or semi-detached
57-44 81 STREET
QUEENS · Middle Village · BIN 4066575
💬 Discuss this project
1938Year Built
1Stories
A5Building Class
R4Zoning
1,419 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,700 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Sub-Basement5p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2022$815K—— → —$574/sf building
12/15/2014$620K—— → —$437/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DINGS ENGINEERING P.C.403/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DINGS ENGINEERING PC603/21/2026
YBL NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DINGS ENGINEERING PC2051201/25/2022
Building Lifecycle
All (37)Filed (4)Permit Issued (3)Signed Off (2)Violation (9)Inspection (9)Objection (4)Special Inspection (6)
09/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/11/2022
Signed off — Alteration
Remove a kitchen, and no-bearing partitions, legalize 3 piece bathroom, install new laundry at the basement level, to remove ECB violation 39042402L;39041515N;39041514L;39042401J, no change of egress, use, and bulk of the building.
Q00542774-I1
07/05/2022
Signed off — Alteration
Remove a kitchen, and no-bearing partitions, legalize 3 piece bathroom, install new laundry at the basement level, to remove ECB violation 39042402L;39041515N;39041514L;39042401J, no change of egress, use, and bulk of the building.
Q00542774-S1
05/04/2022
Permit issued — Plumbing
Q00542774-S2-PL
03/18/2022
Filed — Alteration
Remove a kitchen, and no-bearing partitions, legalize 3 piece bathroom, install new laundry at the basement level, to remove ECB violation 39042402L;39041515N;39041514L;39042401J, no change of egress, use, and bulk of the building.
Q00542774-S2
03/02/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/28/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/17/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
02/02/2022
Special inspection requirement — Final
Yanqi Ding
02/02/2022
Special inspection requirement — Interior lighting power
Yanqi Ding
01/27/2022
Objection resolved — Addressed
01/25/2022
Filed — Alteration
Remove a kitchen, and no-bearing partitions, legalize 3 piece bathroom, install new laundry at the basement level, to remove ECB violation 39042402L;39041515N;39041514L;39042401J, no change of egress, use, and bulk of the building.
Q00542774-P1
01/25/2022
Objection raised — Scope
01/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
01/21/2022
Special inspection requirement — Final
Yanqi Ding
01/21/2022
Special inspection requirement — Interior lighting power
Yanqi Ding
12/09/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/06/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/02/2021
Permit issued — Plumbing
Q00542774-S1-PL
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/27/2021
Permit issued — General Construction
Q00542774-I1-GC
08/23/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Zoning
07/04/2021
Filed — Alteration
Remove a kitchen, and no-bearing partitions, legalize 3 piece bathroom, install new laundry at the basement level, to remove ECB violation 39042402L;39041515N;39041514L;39042401J, no change of egress, use, and bulk of the building.
Q00542774-S1
06/28/2021
Filed — Alteration
Remove a kitchen, and no-bearing partitions, legalize 3 piece bathroom, install new laundry at the basement level, to remove ECB violation 39042402L;39041515N;39041514L;39042401J, no change of egress, use, and bulk of the building.
Q00542774-I1
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Plumbing
05/21/2021
Violation issued (ECB, closed)
Unknown
05/21/2021
Violation issued (ECB, closed)
Construction
09/24/2011
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC05/04/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC09/02/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC08/27/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/28/2022Fail-Final General Construction Non-Directive 14FailView ↗
02/17/2022Fail-Final General Construction Non-Directive 14FailView ↗
12/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/06/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/08/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/02/2022Fire-Resistant Penetrations and JointsYanqi Dingspecial
02/02/2022FinalYanqi Dingprogress
02/02/2022Interior lighting powerYanqi Dingenergy_progress
01/21/2022Fire-Resistant Penetrations and JointsYanqi Dingspecial
01/21/2022FinalYanqi Dingprogress
01/21/2022Interior lighting powerYanqi Dingenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00542774-S1Request digital key ↗
08/27/2026Q00542774-S2Request digital key ↗
08/15/2026Q00542774-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00542774-P1Open ↗
08/13/2026Q00542774-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00542774-P1Open ↗
09/01/2026Q00542774-P1Open ↗
08/31/2026Q00542774-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00542774-I1Open ↗
08/27/2026Q00542774-P1Open ↗
08/27/2026Q00542774-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00542774-P1Open ↗
08/31/2026Q00542774-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00542774-S1Open ↗
08/27/2026Q00542774-S2Open ↗
08/15/2026Q00542774-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00542774-I1Open ↗