FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
Architectural modifications to take place on the facade and roof as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents · 4 drawing sheets
Bulkhead7p · 1 filing · 12 docs
Architecture
Architectural modifications to take place on the facade and roof as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents · 7 drawing sheets
Floor 43Under Construction1 filing · 7 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications to take place on the 41st, 42nd, and 42nd MER space Construction floor per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as Marketing 45th, 46th, and 47th floor)
On file for this project
7 documents
Floor 42Under Construction1 filing · 7 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications to take place on the 41st, 42nd, and 42nd MER space Construction floor per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as Marketing 45th, 46th, and 47th floor)
On file for this project
7 documents
Floor 41Under Construction10p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Mechanical modifications to take place on the 41st, 42nd, and 42nd MER space Construction floor per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as Marketing 45th, 46th, and 47th floor)
On file for this project
7 documents
Standpipe modifications taking place on the 37-39th floor as indicated on the drawings. (Build-out) (39-41st floor Marketing
On file for this project
30 documents · 6 drawing sheets
Structural modifications taking place on the 36th - 37th floors as indicated on the drawings. (40th - 41st Marketing floors)
On file for this project
19 documents · 5 drawing sheets
Floor 4010p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Standpipe modifications taking place on the 37-39th floor as indicated on the drawings. (Build-out) (39-41st floor Marketing
On file for this project
30 documents · 6 drawing sheets
Structural modifications taking place on the 36th - 37th floors as indicated on the drawings. (40th - 41st Marketing floors)
On file for this project
19 documents · 5 drawing sheets
Floor 3912p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Standpipe modifications taking place on the 37-39th floor as indicated on the drawings. (Build-out) (39-41st floor Marketing
On file for this project
30 documents · 7 drawing sheets
Structural modifications taking place on the 36th - 37th floors as indicated on the drawings. (40th - 41st Marketing floors)
On file for this project
19 documents · 5 drawing sheets
Floor 388p · 4 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Standpipe modifications to take place on the 34th Floor (38th marketing floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Sprinkler modifications to take place on the 34th Floor (38th marketing floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
15 documents · 1 drawing sheet
Plumbing modifications taking place on the 34th Floor (38th marketing floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 373p · 1 filing · 11 docs
ElectricalMechanical
Mechanical Modifications taking place on the 33rd floor (37th marketing floor) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
11 documents · 3 drawing sheets
Floor 364p · 2 filings · 6 docs
ElectricalPlumbing
Plumbing modifications taking place on the 32nd floor (36th marketing floor) as indicated on the drawings. No change in use, egress or occupancy
On file for this project
3 documents · 2 drawing sheets
Mechanical modifications taking place on the 32nd floor (36th marketing floor) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Floor 35
Floor 343p · 2 filings · 20 docs
Fire ProtectionPlumbing
Sprinkler modifications to take place on the 34th Floor (38th marketing floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
15 documents · 1 drawing sheet
Plumbing modifications taking place on the 34th Floor (38th marketing floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 332p · 2 filings · 9 docs
DMPlumbing
Construction modifications taking place on the 28th & 29th floors (32-33rd marketing floors)
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications taking place on the 29th & 30th floors (33rd & 34th marketing floors) as indicated on the drawings.
On file for this project
6 documents · 1 drawing sheet
Floor 32
Floor 31
Floor 309p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Mechanical modifications related to interior demolition on the 30th floor (34th floor marketing) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
General Construction to take place on the 26th Construction floor as per drawings filed herewith. No change in egress, use, or occupancy. (Floor Listed as 30th Marketing Floor)
On file for this project
6 documents · 2 drawing sheets
Mechanical modifications to take place on the 26th Construction Floor as per drawings filed herewith. No change in use, egress, or occupancy. (Floor listed as 30th Marketing Floor)
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2911p · 7 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbing
Minor interior demolition. Install new interior partitions, doors, suspended ceilings, flooring and finishes on the 25th Floor (CO)/ 29th Floor (MKT) as per plans (Morgan Stanley Flagship: Package 4.) No change to use, egress or occupancy.
On file for this project
5 documents · 4 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 2, 7 & 24th Flrs (CO)/ Mez, 10, 28th Flrs (Mktg) as per plans (Morgan Stanley - Phase 3.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Construction modifications taking place on the 28th & 29th floors (32-33rd marketing floors)
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 28Under Construction12p · 8 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Modifications to the existing HVAC system: Installation of ductwork, diffusers, VAVs, CRAC units, WSHPS, and piping on the 7 & 24th Flrs (CO)/ 10 & 28th Flrs (Mktg) as per plans (Morgan Stanley - Phase 3.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 2, 7 & 24th Flrs (CO)/ Mez, 10, 28th Flrs (Mktg) as per plans (Morgan Stanley - Phase 3.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Installation of new plumbing fixtures and associated CW/sanity piping on the 7 & 24th Floor (CO)/ 10 & 28th Floors (Mktg) as per plans (Morgan Stanley - Package #3.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 279p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
General Construction to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No change in egress, use, or occupancy. (Floor Listed as 24thru27 Marketing Floor)
On file for this project
6 documents · 1 drawing sheet
Mechanical modifications taking place on the 27-29th floors (31-33rdmarketing floors) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
19 documents · 1 drawing sheet
Plumbing modifications taking place on the 27-29th floors(31-33rd marketing floors) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 263p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers · Standpipe
MECHANICAL SYSTEMS MODIFICATIONS ON FLOORS 20, 21, AND 23 (LISTED AS 24, 25, AND 27 MARKETING FLOORS) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS ON FLOORS 20, 21, AND 23 (LISTED AS 24, 25, AND 27 MARKETING FLOORS) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
General Construction to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No change in egress, use, or occupancy. (Floor Listed as 24thru27 Marketing Floor)
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 254p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
Modifications to the existing HVAC System: Relocation and Install new CRAC unit, ductwork, controls and accessories on the 25th Floor (CO)/ 29th Floor (Mktg) as per plans (Morgan Stanley Flagship Package #4.) No change to use, egress or occupancy.
On file for this project
6 documents
Remove (211) existing heads, Install (10) temporary heads and install (236) new sprinkler heads and associated piping on the 25th Floor (CO)/ 29th Floor (Mktg) as per plans (Morgan Stanley - Package #4.) No change to use, egress or occupancy.
On file for this project
7 documents
GENERAL CONSTRUCTION MODIFICATIONS AND RELATED FINISHES ON FLOORS 20, 21, and 23 (LISTED AS 24, 25, and 27 MARKETING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 24Under Construction2p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing HVAC system: Installation of ductwork, diffusers, VAVs, CRAC units, WSHPS, and piping on the 7 & 24th Flrs (CO)/ 10 & 28th Flrs (Mktg) as per plans (Morgan Stanley - Phase 3.) No change to use, egress or occupancy.
On file for this project
6 documents
Herewith filing to establish a new place of assembly on the 2nd floor (marketing mezzanine). Administrative CO corrections: removal of F1-b occupancy on 9th floor (12 M), and removal of F-4 occupancy on 24th floor (28 M).
On file for this project
26 documents
Install (243) new heads on the 7th Flr (C)/ 10th Flr (M); Remove (211) existing heads, Install (10) temporary heads and (232) new heads and associated piping on the 24th Flr (CO)/ 28th Flr (M) as per plans (Morgan Stanley - Package #3.)
On file for this project
8 documents
Latest 3 of 5 filings on this floor.
Floor 238p · 3 filings · 16 docs
ArchitectureFire ProtectionMechanicalPlumbing
GENERAL CONSTRUCTION MODIFICATIONS AND RELATED FINISHES ON FLOORS 20, 21, and 23 (LISTED AS 24, 25, and 27 MARKETING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 5 drawing sheets
Plumbing modifications to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as 24th through 27th floor Marketing)
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No use, egress, or occupancy. (Listed as 24th through 27th floor Marketing)
On file for this project
3 documents · 2 drawing sheets
Floor 228p · 6 filings · 9 docs
ArchitectureDMFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction
Herewith filing to establish a new place of assembly on the 2nd floor (marketing mezzanine). Administrative CO corrections: removal of F1-b occupancy on 9th floor (12 M), and removal of F-4 occupancy on 24th floor (28 M).
On file for this project
26 documents
General Construction to take place on the 18th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as 22nd Marketing floor)
On file for this project
5 documents · 2 drawing sheets
Plumbing modifications to take place on the 17th and 18th construction floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as 21st & 22nd Marketing floor)
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 2110p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Plumbing modifications to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as 24th through 27th floor Marketing)
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No use, egress, or occupancy. (Listed as 24th through 27th floor Marketing)
On file for this project
3 documents · 2 drawing sheets
Standpipe modifications taking place on the 15-17th floors (19-21st marketing floors) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2010p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Plumbing modifications to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as 24th through 27th floor Marketing)
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications to take place on the 20th through 23rd Construction floor as per drawings filed herewith. No use, egress, or occupancy. (Listed as 24th through 27th floor Marketing)
On file for this project
3 documents · 2 drawing sheets
Standpipe modifications taking place on the 15-17th floors (19-21st marketing floors) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 196p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Sprinkler modifications taking place on the 15th floor (19th floor Marketing) as indicated on the drawings
On file for this project
11 documents
Standpipe modifications taking place on the 15-17th floors (19-21st marketing floors) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Mechanical modifications taking place on the 15-17th floors (19-21st marketing floors) as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 189p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 2 drawing sheets
Sprinkler modifications to take place on 18th floor as per drawings filed herewith. No change in use,egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Plumbing modifications to take place on the 18th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1710p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Mechanical modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
18 documents · 2 drawing sheets
Plumbing modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Standpipe modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 169p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Mechanical modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
18 documents · 2 drawing sheets
Plumbing modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Standpipe modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1511p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Mechanical modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
18 documents · 2 drawing sheets
General Construction to take place on the 15th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 3 drawing sheets
Plumbing modifications to take place on the 15th through 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 142p · 2 filings · 9 docs
ArchitecturePlumbing
Replacement of core restroom fixtures on existing roughing and Installation of new plumbing fixtures and associated CW/sanitary piping on the 3-4, 8-10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (Morgan Stanley - Package #2.)
On file for this project
3 documents · 1 drawing sheet
General Construction to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
6 documents · 1 drawing sheet
Floor 13
Floor 122p · 2 filings · 9 docs
ArchitecturePlumbing
Replacement of core restroom fixtures on existing roughing and Installation of new plumbing fixtures and associated CW/sanitary piping on the 3-4, 8-10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (Morgan Stanley - Package #2.)
On file for this project
3 documents · 1 drawing sheet
General Construction to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
6 documents · 1 drawing sheet
Floor 112p · 2 filings · 9 docs
ArchitecturePlumbing
Replacement of core restroom fixtures on existing roughing and Installation of new plumbing fixtures and associated CW/sanitary piping on the 3-4, 8-10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (Morgan Stanley - Package #2.)
On file for this project
3 documents · 1 drawing sheet
General Construction to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
6 documents · 1 drawing sheet
Floor 10Under Construction9p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods
Modifications to the existing HVAC System: Install new CRAC Units, transfer ducts, VAV's and controls on the 3-4, 8-9, 10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (MS Flagship - Package #2.) No change to use, egress or occupancy.
On file for this project
3 documents
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 2, 7 & 24th Flrs (CO)/ Mez, 10, 28th Flrs (Mktg) as per plans (Morgan Stanley - Phase 3.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated CW/sanity piping on the 7 & 24th Floor (CO)/ 10 & 28th Floors (Mktg) as per plans (Morgan Stanley - Package #3.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 9Under Construction3p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing HVAC System: Install new CRAC Units, transfer ducts, VAV's and controls on the 3-4, 8-9, 10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (MS Flagship - Package #2.) No change to use, egress or occupancy.
On file for this project
3 documents
Herewith filing to establish a new place of assembly on the 2nd floor (marketing mezzanine). Administrative CO corrections: removal of F1-b occupancy on 9th floor (12 M), and removal of F-4 occupancy on 24th floor (28 M).
On file for this project
26 documents
Plumbing modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 8Under Construction10p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Modifications to the existing HVAC System: Install new CRAC Units, transfer ducts, VAV's and controls on the 3-4, 8-9, 10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (MS Flagship - Package #2.) No change to use, egress or occupancy.
On file for this project
3 documents
Sprinkler modifications to take place on cellar, 8th floor, and 41st Construction floor (aka 45th Marketing Floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 6 drawing sheets
Plumbing modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 713p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Replacement of core restroom fixtures on existing roughing and Installation of new plumbing fixtures and associated CW/sanitary piping on the 3-4, 8-10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (Morgan Stanley - Package #2.)
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 65p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction
Replacement of core restroom fixtures on existing roughing and Installation of new plumbing fixtures and associated CW/sanitary piping on the 3-4, 8-10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (Morgan Stanley - Package #2.)
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Standpipe System: Installation of new 4 fire piping and connect to existing 6 standpipe riser and provide new OS&Y standpipe isolation valve on the 3-4th Flrs (CO)/ 6-7th Flrs (MKTG) as per plans (MS Flagship - Package #2.)
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Install (240) new sprinkler heads and associated sprinkler piping on the 26th Floor (CO)/ 30th Floor (Mktg) as per plans (Morgan Stanley Flagship.) No change to use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 51p · 1 filing · 11 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Structural modifications taking place on the 3rd & 4th floors (6th & 7th Marketing floors) as indicated on the drawings.
On file for this project
11 documents · 1 drawing sheet
Floor 4Under Construction7p · 4 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing HVAC System: Install new CRAC Units, transfer ducts, VAV's and controls on the 3-4, 8-9, 10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (MS Flagship - Package #2.) No change to use, egress or occupancy.
On file for this project
3 documents
Plumbing modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3Under Construction12p · 5 filings · 17 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing HVAC System: Install new CRAC Units, transfer ducts, VAV's and controls on the 3-4, 8-9, 10th Floors (CO)/ 6-7, 11-12, 14th Floors (Marketing) as per plans (MS Flagship - Package #2.) No change to use, egress or occupancy.
On file for this project
3 documents
Plumbing modifications to take place on the 2nd Construction floor thru 4th construction floor & 7th, 8th, 9th, 10th Construction floor (Listed as Mezz, 6, 7 & 10, 11, 12, and 14th Marketing Floor)
On file for this project
3 documents · 1 drawing sheet
Architectural modifications to take place on the facade and roof as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 21p · 1 filing
Architecture
Issued Permit Scope
General Construction
Herewith filing to establish a new place of assembly on the 2nd floor (marketing mezzanine). Administrative CO corrections: removal of F1-b occupancy on 9th floor (12 M), and removal of F-4 occupancy on 24th floor (28 M).
On file for this project
26 documents · 1 drawing sheet
Floor 12p · 4 filings · 6 docs
ArchitectureGeneralStructural
Issued Permit Scope
General Construction
Structural modifications related to installing an accessory stair from the 1st floor to the cellar. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Mezzanine13p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 2, 7 & 24th Flrs (CO)/ Mez, 10, 28th Flrs (Mktg) as per plans (Morgan Stanley - Phase 3.) No change to use, egress or occupancy.
On file for this project
5 documents · 3 drawing sheets
Modifications to the existing Sprinkler System: Installation of (125) new sprinkler heads and associated sprinkler piping on the 2nd Floor (CO)/ Mezzanine (Mktg) as per plans (Morgan Stanley - Package #3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system: Install ductwork, diffusers, VAVs, CRAC units, WSHPS, piping and install commercial kitchen exhaust ductwork on the 2nd Floor (CO)/ Mezzanine (Marketing) as per plans (Morgan Stanley - Phase 3.)
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Cellar17p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems
GENERAL CONSTRUCTION MODIFICATIONS AND RELATED FINISHES ON FLOORS 20, 21, and 23 (LISTED AS 24, 25, and 27 MARKETING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
Sprinkler modifications to take place on cellar, 8th floor, and 41st Construction floor (aka 45th Marketing Floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 4 drawing sheets
General Construction to take place on Cellar floor as per drawings filed herewith. No change in egress, use, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Basement6p · 3 filings · 16 docs
DMFire ProtectionGeneralMechanicalPlumbing
Mechanical modifications taking place in the cellar as indicated on the drawings.
On file for this project
6 documents · 2 drawing sheets
Sprinkler modifications taking place in the cellar as indicated on the drawings.
On file for this project
4 documents · 1 drawing sheet
Plumbing modifications taking place in the cellar as indicated on the drawings.