← Back
Three families
57 FRANKLIN STREET
BROOKLYN · BIN 3065026
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
M1-2/R6BZoning
2,640 sfGross Floor Area
3Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 57 FRANKLIN STREET, LLC · 1,750 sf lot · 1.51 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Roof1p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
57 FRANKLIN STREET, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2018$2.0M—Private party → 57 FRANKLIN STREET, LLC$758/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSELA ENGINEERING P.C.608/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VSP MECHANICAL INCPlumbing907/08/2026
IP STATE BUILDER INCGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSELA ENGINEERING P.C.353508/18/2023
Building Lifecycle
All (106)Filed (6)Permit Issued (3)Signed Off (3)Violation (19)Inspection (5)Objection (40)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
08/31/2023
Signed off — Alteration
PAA IS FILED TO AMEND PLANS TO AS-BUILD CONDITIONS. PROPOSED CHANGES DO NOT AFFECT APPROVED OCCUPANCY, USE, AND CONSTRUCTION COST. INTERIOR RENOVATION. NO ROOF REPAIR (ROOF OVERHANG ON THE FIRST-FLOOR BACKYARD AND/OR THE MAIN ROOF) IS PART OF THIS APPL.
B00446429-I1
08/28/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Final
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Metering
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Insulation placement and R values
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Maintenance information
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Fenestration air leakage
SERGEY DRABKIN
08/28/2023
Special inspection requirement — Interior lighting power
SERGEY DRABKIN
08/18/2023
Filed — Alteration
PAA IS FILED TO AMEND PLANS TO AS-BUILD CONDITIONS. PROPOSED CHANGES DO NOT AFFECT APPROVED OCCUPANCY, USE, AND CONSTRUCTION COST. INTERIOR RENOVATION. NO ROOF REPAIR (ROOF OVERHANG ON THE FIRST-FLOOR BACKYARD AND/OR THE MAIN ROOF) IS PART OF THIS APPL.
B00446429-P2
08/18/2023
Signed off — Alteration
PAA IS FILED TO AMEND PLANS AND SCHEDULES TO AS-BUILD CONDITIONS. REPLACE & RELOCATE BOILER & HWH IN THE SAME MECHANICAL ROOM ON THE SAME ROUGHING. PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF A 3-FAMILY HOUSE FILED AS JOB B00446429.
B00443084-I1
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Final
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Maintenance information
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Fenestration air leakage
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Insulation placement and R values
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Interior lighting power
SERGEY DRABKIN
08/17/2023
Special inspection requirement — Metering
SERGEY DRABKIN
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
08/06/2023
Objection resolved — Addressed
08/06/2023
Objection resolved — Addressed
08/06/2023
Objection resolved — Addressed
08/04/2023
Objection raised — Accessibility
08/04/2023
Objection raised — Accessibility
08/04/2023
Objection raised — Accessibility
08/04/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Addressed
08/03/2023
Objection raised — Other
08/03/2023
Objection raised — Admin
08/03/2023
Objection raised — Mechanical
08/03/2023
Objection raised — Fire_Protection
07/28/2023
Filed — Alteration
PAA IS FILED TO AMEND PLANS TO AS-BUILD CONDITIONS. PROPOSED CHANGES DO NOT AFFECT APPROVED OCCUPANCY, USE, AND CONSTRUCTION COST. INTERIOR RENOVATION. NO ROOF REPAIR (ROOF OVERHANG ON THE FIRST-FLOOR BACKYARD AND/OR THE MAIN ROOF) IS PART OF THIS APPL.
B00446429-P1
07/28/2023
Filed — Alteration
PAA IS FILED TO AMEND PLANS AND SCHEDULES TO AS-BUILD CONDITIONS. REPLACE & RELOCATE BOILER & HWH IN THE SAME MECHANICAL ROOM ON THE SAME ROUGHING. PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF A 3-FAMILY HOUSE FILED AS JOB B00446429.
B00443084-P1
07/26/2023
Special inspection requirement — Metering
SERGEY DRABKIN
07/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY DRABKIN
07/26/2023
Special inspection requirement — Interior lighting power
SERGEY DRABKIN
07/26/2023
Special inspection requirement — Maintenance information
SERGEY DRABKIN
07/26/2023
Special inspection requirement — Fenestration air leakage
SERGEY DRABKIN
07/26/2023
Special inspection requirement — Insulation placement and R values
SERGEY DRABKIN
07/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY DRABKIN
06/24/2023
Signed off — Alteration
Temporary construction fence in conjunction with ALT B00446429.
B00793015-I1
03/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2023
Violation issued (HPD, open)
A
03/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVSP MECHANICAL INC10/18/2022
DOB NOWConstruction FenceSigned-offIP STATE BUILDER INC08/24/2022
DOB NOWGeneral ConstructionSigned-offIP STATE BUILDER INC08/03/2022
1 project · most recent 04/25/2023
General Wiring
FiledStatusContractorScope
04/25/2023CompleteARC POWER ELECL CONTS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/28/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
08/28/2023Fire-Resistance Rated ConstructionSERGEY DRABKINprogress
08/28/2023FinalSERGEY DRABKINprogress
08/28/2023Structural Stability – Alterations of existing buildingsSERGEY DRABKINspecial
08/28/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
08/28/2023MeteringSERGEY DRABKINenergy_progress
08/28/2023Fenestration and door U-factor and product ratingsSERGEY DRABKINenergy_progress
08/28/2023Insulation placement and R valuesSERGEY DRABKINenergy_progress
08/28/2023Maintenance informationSERGEY DRABKINenergy_progress
08/28/2023Fenestration air leakageSERGEY DRABKINenergy_progress
08/28/2023Interior lighting powerSERGEY DRABKINenergy_progress
08/17/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
08/17/2023Structural Stability – Alterations of existing buildingsSERGEY DRABKINspecial
08/17/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
08/17/2023Fire-Resistance Rated ConstructionSERGEY DRABKINprogress
08/17/2023FinalSERGEY DRABKINprogress
08/17/2023Maintenance informationSERGEY DRABKINenergy_progress
08/17/2023Fenestration air leakageSERGEY DRABKINenergy_progress
08/17/2023Insulation placement and R valuesSERGEY DRABKINenergy_progress
08/17/2023Fenestration and door U-factor and product ratingsSERGEY DRABKINenergy_progress
08/17/2023Interior lighting powerSERGEY DRABKINenergy_progress
08/17/2023MeteringSERGEY DRABKINenergy_progress
08/09/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
07/26/2023MeteringSERGEY DRABKINenergy_progress
07/26/2023Fenestration and door U-factor and product ratingsSERGEY DRABKINenergy_progress
Latest 25 of 34.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00446429-P2Request digital key ↗
08/15/2026B00446429-P1Request digital key ↗
08/15/2026B00446429-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00443084-I1Request digital key ↗
08/14/2026B00443084-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/28/2026B00793015-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/13/2026B00446429-P2Open ↗
08/13/2026B00446429-P1Open ↗
08/13/2026B00446429-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B00446429-I1Open ↗
09/23/2026B00446429-I1Open ↗
09/23/2026B00446429-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B00446429-I1Open ↗
09/23/2026B00446429-I1Open ↗
09/01/2026B00443084-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00443084-I1Open ↗
09/01/2026B00443084-P1Open ↗
09/01/2026B00446429-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWHPD-1: Anti-Harassment Area Checklist6
08/13/2026B00446429-I1Open ↗
08/13/2026B00443084-I1Open ↗
08/13/2026B00443084-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCertificate of No Harassment3
08/13/2026B00446429-P1Open ↗
08/13/2026B00446429-I1Open ↗
08/13/2026B00446429-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00443084-I1Open ↗
09/01/2026B00446429-P2Open ↗
08/15/2026B00446429-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00446429-I1Open ↗