← Back
Two stories - detached, small or mid-size
57 GANSEVOORT BOULEVARD
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5018137
💬 Discuss this project
1930Year Built
2.75Stories
A1Building Class
R3-1Zoning
1,801 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,600 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLAZA CONSTRUCTION107/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/15/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/15/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
07/28/2026
Permit issued — Solar
S01428047-I1-SL
07/15/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01428047-I1
07/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/14/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/08/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/28/2026
1 project · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/14/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/14/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/08/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/08/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/08/2026FinalWalid Abdullaprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026S01428047-I1Open ↗
09/02/2026S01428047-I1Open ↗
09/02/2026S01428047-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S01428047-I1Open ↗
09/02/2026S01428047-I1Open ↗