← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
57 GREENE STREET
MANHATTAN · BIN 1007297
💬 Discuss this project
1877Year Built
6Stories
RMBuilding Class
M1-5/R7XZoning
53,332 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 10,000 sf lot · 5.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 3 docs
BulkheadUnder Construction1p · 1 filing · 5 docs
Floor 15p · 2 filings · 12 docs
Cellar12p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION507/08/2026
PREMIER EQUITIES703/22/2026
TECTONIC BUILDERS103/22/2026
OELBERMANN ASSOCIATES1203/22/2026
OLEBERMANN ASSOCIATES103/22/2026
VICTOR YOHAY PARTNER103/22/2026
IN WINDOW OUTDOOR LLC403/22/2026
IN WINDOW OUTDOOR LLC SUI303/22/2026
GREENE MERCER HOLDINGS1403/22/2026
GREENE STREET LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TECTONIC BUILDERS INCGeneral Contractor407/08/2026
OCEAN PACIFIC INTERIORS *General Contractor307/08/2026
A PLUS PLUMBING CORPPlumbing207/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor207/08/2026
THOMPSON, NElectrical103/21/2026
A + SPRINKLER CORPFire Protection107/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
P & D MECHANICAL CORPFire Protection107/08/2026
HI-TECH C.P.M. CORPGeneral Contractor107/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor104/09/2026
ROCKALL CONSTRUCTION CORPGeneral Contractor104/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
DRILON PLBG & HTG INCPlumbing107/08/2026
BRONXDALE ELECTRIC INCElectrical103/22/2026
BALATON CONSULTING LLCScaffold107/08/2026
EUGENE IOVINE,JR.Electrical103/21/2026
JULIO ALARCONElectrical103/21/2026
RAMNARINE JAGNARINEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819102/20/2026
SPECIAL TESTING & CONSULT1688109/12/2025
CL ENGINEERING P.C.6781709/30/2024
HT ENGINEERING, PLLC6274304/15/2021
Building Lifecycle
All (137)Filed (21)Permit Issued (18)Signed Off (7)Violation (48)Inspection (7)Objection (6)Special Inspection (30)
03/30/2026
Signed off — Alteration
Diamond plate on vault to be repaired and painted.
M01284760-I1
03/12/2026
Permit issued — Supported Scaffold
M01367521-I1-SF
03/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01367521-I1
02/25/2026
Permit issued — Suspended Scaffold
M01359499-I1-SC
02/20/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01359499-I1
02/12/2026
Special inspection requirement — Post-installed Anchors
nayan soni
02/12/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
11/21/2025
Permit issued — General Construction
M01284760-I1-GC
09/12/2025
Filed — Alteration
Diamond plate on vault to be repaired and painted.
M01284760-I1
09/10/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2024
Signed off — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-S3
11/19/2024
Permit issued — Sprinklers
M00898255-S3-EW-SP
10/22/2024
Signed off — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-I1
10/22/2024
Signed off — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-S1
10/22/2024
Signed off — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-S2
10/11/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/10/2024
Special inspection requirement — Final
PETER CHO
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
10/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/30/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-P6
09/30/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-P5
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/26/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
09/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
08/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/06/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-P4
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/10/2024
Permit issued — Sprinklers
M00898255-S3-EW-SP
05/28/2024
Permit issued — Plumbing
M00898255-S1-PL
05/23/2024
Permit issued — Plumbing
M00898255-S1-PL
05/15/2024
Permit issued — Mechanical Systems
M00898255-S2-MS
05/14/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-S3
05/14/2024
Permit issued — General Construction
M00898255-I1-GC
01/10/2024
Objection resolved — Addressed
01/10/2024
Objection resolved — Addressed
01/09/2024
Objection raised — Admin
01/09/2024
Objection raised — Admin
01/05/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-P3
01/05/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-P2
01/05/2024
Filed — Alteration
FILED HEREWITH SPRINKLER WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #M00898255-I1. PROPOSED (4) NEW SPRINKELR HEADS AS PER PLANS FILED HEREWITH.
M00898255-P1
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
01/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
01/02/2024
Special inspection requirement — Final
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/02/2024
Special inspection requirement — Mechanical Systems
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
01/02/2024
Special inspection requirement — Final
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedLAWRENCE EXTERIOR RESTORA03/12/2026
DOB NOWSuspended ScaffoldPermit IssuedLAWRENCE EXTERIOR REST CO02/25/2026
DOB NOWGeneral ConstructionSigned-offROCKALL CONSTRUCTION CORP11/21/2025
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC11/19/2024
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP06/10/2024
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC05/28/2024
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC05/23/2024
DOB NOWMechanical SystemsSigned-offOCEAN PACIFIC INTERIORS *05/15/2024
DOB NOWGeneral ConstructionSigned-offOCEAN PACIFIC INTERIORS *05/14/2024
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO04/27/2022
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP08/25/2021
DOB NOWMechanical SystemsSigned-offTECTONIC BUILDERS INC06/10/2021
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP05/04/2021
DOB NOWSprinklersSigned-offA + SPRINKLER CORP05/04/2021
DOB NOWMechanical SystemsSigned-offTECTONIC BUILDERS INC04/29/2021
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC08/03/2018
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC06/14/2018
DOB NOWConstruction FencePermit IssuedHI-TECH C.P.M. CORP03/08/2018
BISOTISSUEDTECTONIC BUILDERS INC06/21/2021
BISOTISSUEDTECTONIC BUILDERS INC04/15/2021
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY03/25/2021
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY07/25/2019
BISOTISSUEDHI-TECH C.P.M. CORP05/22/2019
BISOTISSUEDHI-TECH C.P.M. CORP03/07/2019
BISOTISSUEDHI-TECH C.P.M. CORP06/27/2018
BISPLISSUEDPOWER PLUMBING & HEATING03/29/2018
BISOTISSUEDHI-TECH C.P.M. CORP03/19/2018
BISPLISSUEDROCK E SMALL PLBG&HTG INC02/07/2018
BISOTISSUEDINDETAIL LLC09/12/2017
BISOTISSUEDCEL TECH ELECTRIC INC07/20/2017
BISOTISSUEDHI-TECH C.P.M. CORP06/19/2017
BISPLISSUEDINTEGRA PLUMBING OF N.Y04/13/2016
BISSDISSUEDINTEGRA PLUMBING INC03/01/2016
BISBLISSUEDACCESS PLUMBING CORP08/05/2015
BISMHISSUEDLTI CONSTRUCTION CORP05/29/2015
BISOTISSUEDD. HALLER INC04/30/2015
BISOTISSUEDD. HALLER INC04/30/2015
BISMHISSUEDD. HALLER INC04/30/2015
BISOTISSUEDD. HALLER INC04/30/2015
BIS—ISSUEDD. HALLER INC04/30/2015
+ 28 more permits on file
1 project · most recent 04/15/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2021Signed-offTECTONIC BUILDERS INCAir Conditioning Systems
Cooling
Mitsubishi Electric PURY-EP120TNU-A 10 tons · Vrf Outdoor ×1
PURY-EP96TNU-A 8 tons · Vrf Outdoor ×1
1 project · most recent 04/14/2021
FiledStatusContractorScope
04/14/2021Signed-offA + SPRINKLER CORP—
1 project · most recent 04/15/2021
Water/Sanitary
FiledStatusContractorScope
04/15/2021Signed-offA PLUS PLUMBING CORPWater/Sanitary
9 projects · most recent 10/24/2024
General Wiring Lighting
FiledStatusContractorScope
10/24/2024CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
01/03/2023CompleteM & M CONTROL WIRING &—
05/12/2022CompleteGEDNEY ELECTRIC, LLCGeneral Wiring
01/05/2022CompleteGEDNEY ELECTRIC, LLCGeneral Wiring, Lighting
04/24/2021Permit IssuedBRONXDALE ELECTRIC INCGeneral Wiring
08/27/2019Permit IssuedMER ELECTRIC, INCGeneral Wiring
05/29/2019Permit IssuedLEADER ELECTRIC CO., INC—
04/02/2018CompleteY.S ELECTRICGeneral Wiring, Lighting
02/19/2018Permit IssuedRIGHTWAY ELECTRICAL INCGeneral Wiring
2 projects · most recent 03/11/2026
Scaffold
FiledStatusContractorScope
03/11/2026Permit IssuedLAWRENCE EXTERIOR RESTORAScaffold
06/12/2018Permit IssuedKAJ NY CONSTRUCTION INCScaffold
1 project · most recent 02/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
02/20/2026Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/11/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/16/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
02/12/2026Post-installed Anchorsnayan sonispecial
02/12/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
09/10/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/10/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
10/10/2024FinalPETER CHOprogress
10/10/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/10/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
10/10/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
10/10/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/26/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
09/26/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/26/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/26/2024FinalCHRISTIAN LOZADAprogress
09/26/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
08/13/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/13/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/06/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/06/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/02/2024Fire-Resistant Penetrations and Joints—special
01/02/2024Energy Code Compliance Inspections—progress
01/02/2024Structural Stability – Alterations of existing buildings—special
01/02/2024Energy Code Compliance Inspections—progress
01/02/2024Final—progress
01/02/2024Fire-Resistance Rated Construction—progress
01/02/2024Fire-Resistant Penetrations and Joints—special
Latest 25 of 39.
▾Documents — 896 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch17
09/06/2026M00023171-I1Request digital key ↗
09/06/2026M00052240-I1Request digital key ↗
09/02/2026M00704627-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00474312-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00176982-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00474305-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00474289-I1Request digital key ↗
▸Applications & Permits202
▸BISPLAN / WORK APPROVAL APPLICATION99
09/21/2021140998348Open ↗
07/23/2021140998348Open ↗
03/26/2021123777369Open ↗
Showing 3 of 99 on file for this type
▸BISWORK PERMIT APPLICATION82
04/15/2021140998348Open ↗
03/26/2021123777369Open ↗
02/24/2021123777369Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWLPC Approval/Permit14
09/03/2026M00474289-I1Open ↗
08/13/2026M00898255-S2Open ↗
08/13/2026M00898255-S1Open ↗
Showing 3 of 14 on file for this type
▸BISDOT Permit - House Connection4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications201
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION111
12/03/2019123671570Open ↗
12/03/2019123671570Open ↗
07/26/2019123776743Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/06/2026M00052240-I1Open ↗
09/03/2026M00474289-I1Open ↗
08/28/2026M00898255-P6Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
02/22/2021140998348Open ↗
07/26/2019123776743Open ↗
07/25/2019123777369Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
07/26/2019123776743Open ↗
07/25/2019123777369Open ↗
06/03/2019123671570Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M00474305-I1Open ↗
09/01/2026M00474305-I1Open ↗
08/31/2026M00898255-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00704627-I1Open ↗
09/01/2026M00474305-I1Open ↗
08/31/2026M00898255-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/22/2021140998348Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/22/2021140998348Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment78
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
10/30/2019123777369Open ↗
10/23/2019123777369Open ↗
10/03/2019123777369Open ↗
Showing 3 of 26 on file for this type
▸BISEQUIPMENT USE PERMITS17
01/07/2019123292267Open ↗
Showing 1 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/07/2019123292267Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes12
07/26/2019123776743Open ↗
07/25/2019123777369Open ↗
06/03/2019123671570Open ↗
Showing 3 of 12 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
09/29/2021140998348Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos50
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
09/23/2021140998348Open ↗
02/22/2021140998348Open ↗
07/26/2019123776743Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/03/2026M00474289-I1Open ↗
08/28/2026M00898255-P6Open ↗
08/28/2026M00898255-P5Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
12/03/2019123671570Open ↗
12/03/2019123671570Open ↗
05/22/2019123671552Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
12/02/2020123671552Open ↗
12/02/2020123535371Open ↗
06/26/2020122984841Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/02/2020123671552Open ↗
12/02/2020123535371Open ↗
06/26/2020122984841Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC EXEMPTION1
02/22/2021140998348Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/25/2021140998348Open ↗
04/15/2021140998348Open ↗
02/22/2021140998348Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs103
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
10/25/2021140998348Open ↗
12/02/2020123671552Open ↗
12/02/2020123535371Open ↗
Showing 3 of 33 on file for this type
▸BISLANDMARKS APPROVAL26
02/22/2021140998348Open ↗
07/25/2019123777369Open ↗
05/22/2019123671552Open ↗
Showing 3 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION21
09/29/2021140998348Open ↗
12/02/2020123671552Open ↗
12/02/2020123535371Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF3
10/25/2021140998348Open ↗
06/26/2020122984841Open ↗
08/01/2018123292267Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01367521-I1Open ↗
▸Cost, Insurance & Ownership60
▸BISCOST AFFIDAVIT58
10/25/2021140998348Open ↗
02/22/2021140998348Open ↗
12/02/2020123671552Open ↗
Showing 3 of 58 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms88
▸BISEFILING COVER SHEET41
06/28/2019123777369Open ↗
06/28/2019123777369Open ↗
06/28/2019123777369Open ↗
Showing 3 of 41 on file for this type
▸BISADDITIONAL INFORMATION33
10/25/2021140998348Open ↗
09/29/2021140998348Open ↗
09/29/2021140998348Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM9
12/03/2019123671570Open ↗
10/23/2019123777369Open ↗
10/01/2019123777369Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
02/22/2021140998348Open ↗
Showing 1 of 5 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M00898255-P1Open ↗
08/13/2026M00898255-I1Open ↗
08/13/2026M00723995-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01359499-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01359499-I1Open ↗