DOB10/24/2022FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
DOB09/17/2019FTM:DUE TO 2 ALRM FIRE OCCURR ON 9/16/19 THE BLDG SUFFER STRCTL DMG AS FOLLOW:MAIN STAIR INSIDE BLDG FROM 1-2 FL & 2-3 FLRS SEVERE COMPROMISE WITH STEPS&RAILING MISSING/BURNT.STAIR@RISK OF FURTHER COLLAPSE.JOIST ARE EXPOSE&MOD FIRE DMG@2&3 ROOF FLRS.OWN ENGAGE NYSPE&ENDORSE CONTRCT TO EVAL WHOLE BLDG&OBT PRMT FOR REPR N/L/T 11/9/19.S/O REPR JOB 3/2/20
DOB09/16/2019DUE TO FIRE
Two family converted from one family · 2,000 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.