Miscellaneous two family
57 JAVA STREET
BROOKLYN · BIN 3064401
💬 Discuss this project
1910Year Built
3Stories
B9Building Class
R6BZoning
2,820 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: 57 JAVA OWNER LLC · 2,500 sf lot · 1.13 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Floor 34p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
2 jobs · most recent 12/09/2022
General Wiring
FiledStatusContractorScope
12/09/2022CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
05/12/2022CompleteDENMAR ELECTRIC CORP—
Building Lifecycle
All (72)Filed (6)Permit Issued (5)Signed Off (4)Violation (3)Inspection (4)Objection (20)Special Inspection (30)
06/01/2023
Signed off — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-S2
05/30/2023
Signed off — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-S1
05/25/2023
Signed off — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-I1
05/19/2023
Signed off — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-S3
03/31/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2023
Permit issued — Mechanical Systems
B00678712-S3-MS
03/01/2023
Objection raised — Other
03/01/2023
Objection resolved — Addressed
02/24/2023
Filed — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-S3
02/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/23/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
02/13/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
01/16/2023
Objection resolved — Addressed
01/10/2023
Objection resolved — Addressed
12/21/2022
Objection raised — Accessibility
12/21/2022
Objection resolved — Addressed
12/06/2022
Objection resolved — Addressed
12/06/2022
Objection resolved — Addressed
11/28/2022
Objection raised — Admin
11/28/2022
Objection raised — Other
11/28/2022
Objection raised — Accessibility
11/28/2022
Objection raised — Zoning
11/17/2022
Violation issued (HPD, closed)
I
11/08/2022
Filed — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-P2
11/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
11/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
11/08/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
11/07/2022
Filed — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-P1
11/03/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/03/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/01/2022
Permit issued — Plumbing
B00678712-S2-PL
10/13/2022
Permit issued — General Construction
B00678712-S1-GC
10/03/2022
Objection resolved — Addressed
09/26/2022
Objection raised — Other
09/21/2022
Filed — Alteration
INTERIOR DEMOLITION BY HAND OF NON-LOAD BEARING PARTITIONS, DOORS, FLOORS AND WALL FINISHES THROUGHOUT THE VACANT BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00678712-S2
Latest 60 of 72 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAX REAL ESTATE1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2021$2.1M—— → —$736/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS602/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANKLYLOFTY CONSTRUCTIONGeneral Contractor603/21/2026
SENTER MANAGEMENT LLCGeneral Contractor407/08/2026
GLENNS PLUMBING SVCS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781502/24/2023
CROSSCHECK INSPECTION SER544103/21/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFRANKLYLOFTY CONSTRUCTION03/17/2023
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC11/01/2022
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION10/13/2022
DOB NOWGeneral ConstructionSigned-offSENTER MANAGEMENT LLC05/25/2022
DOB NOWGeneral ConstructionSigned-offSENTER MANAGEMENT LLC04/18/2022
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/23/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/23/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/23/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/23/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
02/23/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/13/2023FinalCHRISTIAN LOZADAprogress
02/13/2023Mechanical SystemsCHRISTIAN LOZADAspecial
01/20/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/20/2023FinalCHRISTIAN LOZADAprogress
01/20/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/20/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
01/20/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
01/20/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
01/20/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
01/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/20/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
11/08/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/08/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
11/08/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
11/08/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/08/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
11/03/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
11/03/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
11/03/2022Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
11/03/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
Latest 25 of 32.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/15/2026B00678712-S1Contact architect ↗
08/15/2026B00678712-P2Contact architect ↗
08/15/2026B00678712-S2Contact architect ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00678712-S1Open ↗
09/01/2026B00678712-S1Open ↗
08/31/2026B00678712-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00678712-S2Open ↗
08/27/2026B00678712-S1Open ↗
08/13/2026B00678712-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00678712-S1Open ↗
08/31/2026B00678712-P2Open ↗
08/27/2026B00678712-S3Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/15/2026B00678712-S1Open ↗
08/15/2026B00678712-S2Open ↗
08/13/2026B00678712-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00678712-S1Open ↗