← Back
BuildNYC
Other private school
57 LIVINGSTON STREET
BROOKLYN · Brooklyn Heights · BIN 3335935
💬 Discuss this project
1900Year Built
5Stories
W8Building Class
C5-2AZoning
156,070 sfGross Floor Area
1Units
LL97 Covered1 Active Violation ▸FDNY Report ↗
Other private school · 43,068 sf lot · 3.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPacker Collegiate Institute3p · 3 filings · 20 docs
BulkheadPipe scaffold installation1p · 1 filing · 12 docs
AtticPacker Collegiate Institute31p · 3 filings · 20 docs
Floor 3Packer Collegiate Institute41p · 4 filings · 20 docs
Floor 2Packer Collegiate Institute34p · 4 filings · 20 docs
Floor 1Packer Collegiate Institute62p · 10 filings · 20 docs
CellarPacker Collegiate Institute52p · 6 filings · 20 docs
BasementPacker Collegiate Institute4p · 4 filings · 20 docs
Sub-BasementPacker Collegiate Institute47p · 7 filings · 20 docs
Site & exteriorPacker Collegiate Institute10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Packer Collegiate Institute7210/04/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cornerstone Consulting403/21/2026
Design 21473103/21/2026
United Safety Consultants1303/21/2026
Preemptive Solutions & Consulting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold3307/08/2026
Archstone BuildersGeneral Contractor1807/08/2026
Bedrock Plumbing & HeatingPlumbing507/08/2026
Bedrock MechanicalFire Protection207/08/2026
NY City PlumberPlumbing207/08/2026
Bedrock MechanicalPlumbing103/22/2026
D&D Electl Construction CoElectrical103/22/2026
D&D Electl Construction CoElectrical103/21/2026
MC Gowan BuildersGeneral Contractor104/09/2026
Abilene ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eti Consultants76941306/12/2025
P.a.collins Inspections P2168403/25/2025
Concrete Solutions Lab Co5344102/14/2023
Building Lifecycle
All (189)Filed (44)Permit Issued (36)Signed Off (17)Violation (15)Inspection (15)Objection (32)Special Inspection (30)
09/17/2026
Filed — Alteration
B01382341-I1
05/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Signed off — Alteration
Removal of HVAC system as per plans fled herewith. No change in use, egress or occupancy under this application.
B00342222-I1
08/01/2025
Signed off — Alteration
Modification to sprinkler/ plumbing system as per plans filed herewith. Filed in connection with DOB# 321588260
B00342252-I1
07/17/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
06/20/2025
Signed off — Alteration
Installation of a structure consisting of structural steel, masonry, and precast concrete plank for new extension of existing masonry building. Reinforcement of existing masonry building framing for new loading requirements.
B00349447-I1
06/13/2025
Signed off — Alteration
Modification to HVAC System as per plans. Filed in conjunction with Alt1 321588260.
B00342242-S1
06/13/2025
Signed off — Alteration
Modification to HVAC System as per plans. Filed in conjunction with Alt1 321588260.
B00342242-I1
06/13/2025
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
06/13/2025
Special inspection requirement — Post-installed Anchors
ANTHONY MUSUMECI
06/12/2025
Filed — Alteration
Modification to sprinkler/ plumbing system as per plans filed herewith. Filed in connection with DOB# 321588260
B00342252-P6
06/09/2025
Signed off — Alteration
Installation of system stair tower as indicated on the attached drawings. There are no changes in use, egress or occupancy
B00890508-I1
06/09/2025
Signed off — Alteration
Installation of plywood fence as indicated on the attached drawings. There are no changes in use, egress or occupancy
B00889155-I1
05/15/2025
Permit issued — Sprinklers
B00342252-I1-EW-SP
05/15/2025
Permit issued — Plumbing
B00342252-I1-PL
05/15/2025
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
05/15/2025
Special inspection requirement — Post-installed Anchors
ANTHONY MUSUMECI
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
04/25/2025
Signed off — Alteration
Modification to HVAC System as per plans. Filed in conjunction with Alt1 321588260.
B00342242-S3
04/23/2025
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00889207-I1
04/23/2025
Signed off — Alteration
Installation of overhead protection as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00889194-I1
04/23/2025
Signed off — Alteration
B00889135-I1
04/23/2025
Signed off — Alteration
Installation of pipe scaffolding as indicated on the attached drawing. There are no changes in use, egress or occupancy.
B00891673-I1
04/21/2025
Filed — Alteration
Modification to sprinkler/ plumbing system as per plans filed herewith. Filed in connection with DOB# 321588260
B00342252-P5
04/14/2025
Special inspection requirement — Post-installed Anchors
04/14/2025
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2025
Signed off — Alteration
B00532645-I1
04/08/2025
Signed off — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER STEAM BOILER, DUEL FUEL BURNER AND ANCILLARY PIPING, DUCTWORK, BREECHING VALVES, AND EQUIPMENT. APPLICATION # B00532645-I1 WAS APPROVED WITH THE SAME LAYOUT AND SCOPE OF WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00725177-I1
04/08/2025
Signed off — Alteration
Hereby filing gas and water piping installation. New 2" gas piping service at cellar as per plans. No change in use, egress, or occupancy.
B00532677-I1
04/08/2025
Special inspection requirement — Structural Steel - Details
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Structural Cold-Formed Steel
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Post-installed Anchors
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Structural Steel - Welding
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Final
ANTHONY MUSUMECI
04/08/2025
Special inspection requirement — Masonry
ANTHONY MUSUMECI
04/02/2025
Filed — Alteration
Modification to HVAC System as per plans. Filed in conjunction with Alt1 321588260.
B00342242-P9
04/02/2025
Filed — Alteration
Installation of a structure consisting of structural steel, masonry, and precast concrete plank for new extension of existing masonry building. Reinforcement of existing masonry building framing for new loading requirements.
B00349447-P1
04/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2025
Special inspection requirement — Mechanical Systems
ANTHONY MUSUMECI
04/02/2025
Special inspection requirement — Final
ANTHONY MUSUMECI
04/02/2025
Special inspection requirement — Heating Systems
ANTHONY MUSUMECI
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
03/28/2025
Objection raised — Scope
03/28/2025
Objection resolved — Addressed
03/26/2025
Filed — Alteration
Modification to sprinkler/ plumbing system as per plans filed herewith. Filed in connection with DOB# 321588260
B00342252-P4
03/26/2025
Special inspection requirement — Post-installed Anchors
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2025
Filed — Alteration
Hereby filing gas and water piping installation. New 2" gas piping service at cellar as per plans. No change in use, egress, or occupancy.
B00532677-P1
03/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2025
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
03/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/14/2025
Signed off — Alteration
Removal of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
B00342230-I1
03/04/2025
Special inspection requirement — Heating Systems
ANTHONY MUSUMECI
03/04/2025
Special inspection requirement — Mechanical Systems
ANTHONY MUSUMECI
03/04/2025
Special inspection requirement — Final
ANTHONY MUSUMECI
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offBedrock Mechanical05/15/2025
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating05/15/2025
DOB NOWStructuralSigned-offArchstone Builders02/05/2025
DOB NOWMechanical SystemsSigned-offArchstone Builders12/22/2024
DOB NOWMechanical SystemsSigned-offArchstone Builders12/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding10/17/2024
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating07/26/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/21/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/13/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding06/13/2024
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating05/21/2024
DOB NOWGeneral ConstructionSigned-offArchstone Builders05/08/2024
DOB NOWMechanical SystemsSigned-offArchstone Builders12/27/2023
DOB NOWMechanical SystemsSigned-offArchstone Builders12/27/2023
DOB NOWStructuralSigned-offArchstone Builders12/27/2023
DOB NOWBoiler EquipmentSigned-offAbilene10/30/2023
DOB NOWBoiler EquipmentSigned-offAbilene10/30/2023
DOB NOWPlumbingSigned-offNY City Plumber10/30/2023
DOB NOWMechanical SystemsSigned-offArchstone Builders07/10/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/23/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/22/2023
DOB NOWStructuralSigned-offArchstone Builders06/21/2023
DOB NOWSprinklersSigned-offBedrock Mechanical06/17/2023
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating06/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/15/2023
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/14/2023
DOB NOWConstruction FenceSigned-offSpring Scaffolding06/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/14/2023
DOB NOWMechanical SystemsSigned-offArchstone Builders06/07/2023
DOB NOWMechanical SystemsSigned-offMC Gowan Builders01/12/2023
DOB NOWPlumbingSigned-offNY City Plumber10/24/2022
DOB NOWBoiler EquipmentSigned-offAbilene10/24/2022
DOB NOWBoiler EquipmentSigned-offAbilene10/24/2022
BIS—ISSUEDArchstone Builders12/12/2024
BISOTISSUEDArchstone Builders12/12/2024
BISOTISSUEDArchstone Builders12/12/2024
BIS—ISSUEDArchstone Builders12/12/2024
+ 20 more permits on file
1 project · most recent 04/02/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2025Signed-offArchstone BuildersAir Conditioning Systems
Cooling
Mitsubishi Electric PURY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×2
PKA-A36KA7 36,000 BTU · Fan Coil Indoor ×1
PURY-EP240TNU-A (BS) 240,000 BTU · Vrf Outdoor ×1
PURY-EP384TSNU-A (BS) 384,000 BTU · Vrf Outdoor ×1
PURY-P312TSNU-A 312,000 BTU · Vrf Outdoor ×1
PUY-A36NKA7 (-BS) 36,000 BTU · Vrf Outdoor ×1
ARUM241BTE5 120,000 BTU · Vrf Outdoor ×2
Lg ARNU2435K54 920 CFM · Vrf Indoor ×4
ARUM241BTE5 240,000 BTU · Vrf Outdoor ×4
ARUM036GSS5 144,000 BTU · Vrf Outdoor ×2
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×2
ARUM168BTE5 120,000 BTU · Vrf Outdoor ×2
ARUM192BTE5 12,000 BTU · Vrf Outdoor ×2
ARUN072BSS5 120,000 BTU · Vrf Outdoor ×2
1 project · most recent 04/02/2025
Storm
FiledStatusContractorScope
04/02/2025Signed-offBedrock Plumbing & HeatingStorm
4 projects · most recent 06/12/2026
General Wiring Boiler Controls
FiledStatusContractorScope
06/12/2026Permit IssuedD&D Electl Construction CoGeneral Wiring
04/23/2025CompleteAbilene ElectricBoiler Controls
04/26/2024CompleteTuxedo Electrical Contracting—
06/05/2023CompleteTop Shelf Electric—
1 project · most recent 04/02/2025
Steel
FiledStatusContractorScope
04/02/2025Signed-offArchstone BuildersSteel
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/17/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2024Pass-Final PL - UndergroundPassView ↗
06/13/2024Fail-Final PL - UndergroundFailView ↗
06/06/2024Pass-Final PL - UndergroundPassView ↗
05/29/2024Pass-Final PL - UndergroundPassView ↗
05/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
06/13/2025Sprinkler SystemsANTHONY MUSUMECIspecial
06/13/2025Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
06/13/2025Post-installed AnchorsANTHONY MUSUMECIspecial
05/15/2025Sprinkler SystemsANTHONY MUSUMECIspecial
05/15/2025Post-installed AnchorsANTHONY MUSUMECIspecial
05/15/2025Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
04/14/2025Post-installed Anchors—special
04/14/2025Sprinkler SystemsANTHONY MUSUMECIspecial
04/14/2025Fire-Resistant Penetrations and Joints—special
04/08/2025Structural Steel - DetailsANTHONY MUSUMECIspecial
04/08/2025Structural Steel - High Strength BoltingANTHONY MUSUMECIspecial
04/08/2025Structural Cold-Formed SteelANTHONY MUSUMECIspecial
04/08/2025Post-installed AnchorsANTHONY MUSUMECIspecial
04/08/2025Structural Stability – Alterations of existing buildingsANTHONY MUSUMECIspecial
04/08/2025Structural Steel - WeldingANTHONY MUSUMECIspecial
04/08/2025FinalANTHONY MUSUMECIprogress
04/08/2025MasonryANTHONY MUSUMECIspecial
04/02/2025Mechanical SystemsANTHONY MUSUMECIspecial
04/02/2025FinalANTHONY MUSUMECIprogress
04/02/2025Heating SystemsANTHONY MUSUMECIspecial
03/31/2025Fire-Resistant Penetrations and JointsPaul Collinsspecial
03/26/2025Post-installed Anchors—special
03/26/2025Fire-Resistant Penetrations and Joints—special
03/20/2025Sprinkler SystemsANTHONY MUSUMECIspecial
03/04/2025Heating SystemsANTHONY MUSUMECIspecial
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Packer Collegiate InstituteEducationEntire building
Project B00725177 Alteration · LOC Issued · 04/27/2022
Project B00532645 Alteration · LOC Issued · 04/19/2022
Project B00532677 Alteration · LOC Issued · 04/19/2022
Project B00342230 Alteration · LOC Issued · 01/19/2021
Project B00342242 Alteration · LOC Issued · 01/19/2021
Project B00342222 Alteration · LOC Issued · 01/14/2021
Project B00349447 Alteration · LOC Issued · 01/06/2021
Project B00342252 Alteration · LOC Issued · 12/21/2020
Project B00423075 Alteration · Permit Entire · 11/17/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 459 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch27
08/29/2026B00532645-I1Request digital key ↗
08/27/2026B00342242-P8Request digital key ↗
08/27/2026B00342242-S2Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/02/2026B00342252-P5Request digital key ↗
09/02/2026B00342252-P1Request digital key ↗
09/02/2026B00342252-P6Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/02/2026B00342252-P5Request digital key ↗
09/02/2026B00342252-P6Request digital key ↗
09/02/2026B00342252-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/27/2026B00342242-P9Request digital key ↗
08/27/2026B00342242-I1Request digital key ↗
08/27/2026B00342242-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00349447-P1Request digital key ↗
08/15/2026B00349447-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00349450-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00423075-I1Request digital key ↗
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION34
02/02/2026340733978Open ↗
06/05/2025321588260Open ↗
04/04/2025321588260Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION20
02/06/2024322040643Open ↗
12/21/2023321588260Open ↗
07/25/2023321588260Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit18
08/15/2026B00532677-I1Open ↗
08/15/2026B00532677-P1Open ↗
08/13/2026B00342252-P1Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
02/12/2025321588260Open ↗
02/07/2025321588260Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/29/2021340733978Open ↗
04/01/2021340733978Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
06/28/2023321588260Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
06/28/2023321588260Open ↗
03/10/2021321588260Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/28/2021321588260Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/28/2021321588260Open ↗
▸Seals & Professional Certifications90
▸DOB NOWDPL-1: Design Professional Seal & Signature44
08/29/2026B00532677-P1Open ↗
08/29/2026B00532677-I1Open ↗
08/29/2026B00532645-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/23/2026B00725177-I1Open ↗
09/23/2026B00725177-I1Open ↗
09/23/2026B00725177-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/07/2023321588260Open ↗
07/07/2023321588260Open ↗
06/29/2023321588260Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/12/2026B00342222-I1Open ↗
09/01/2026B00349447-I1Open ↗
08/31/2026B00342222-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
01/28/2021321588260Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
06/28/2023321588260Open ↗
04/01/2021340733978Open ↗
01/28/2021321588260Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/28/2023321588260Open ↗
06/20/2023322040643Open ↗
▸BISSTREET TREE SIGNOFF2
02/17/2026340733978Open ↗
08/08/2025321588260Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/10/2021340733978Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026B00349447-I1Open ↗
08/13/2026B00342242-I1Open ↗
08/13/2026B00342252-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00532645-I1Open ↗
08/15/2026B00532677-I1Open ↗
08/15/2026B00532677-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
02/15/2023322071903Open ↗
01/28/2021321588260Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/07/2023321588260Open ↗
07/07/2023321588260Open ↗
06/29/2023321588260Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/28/2023321588260Open ↗
06/28/2023321588260Open ↗
Showing 2 of 3 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
05/16/2025321588260Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/16/2025321588260Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/16/2025321588260Open ↗
▸BISLIGHTING CONTROLS1
05/16/2025321588260Open ↗
▸BISEXTERIOR LIGHTING POWER1
05/16/2025321588260Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/16/2025321588260Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY17
02/25/2025322071903Open ↗
07/25/2024322071903Open ↗
06/29/2023321588260Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
06/02/2025321588260Open ↗
07/07/2023321588260Open ↗
07/05/2023321588260Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
09/05/2025321588260Open ↗
07/07/2023321588260Open ↗
06/29/2023321588260Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
03/11/2021322040643Open ↗
03/08/2021321588260Open ↗
▸BISPOST-INSTALLED ANCHORS1
05/16/2025321588260Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/15/2023322071903Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/16/2025321588260Open ↗
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/29/2026B00532645-I1Open ↗
08/15/2026B00532677-I1Open ↗
08/15/2026B00532677-P1Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
06/05/2025321588260Open ↗
04/04/2025321588260Open ↗
04/01/2025321588260Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL6
06/04/2025321588260Open ↗
03/11/2021322040643Open ↗
01/10/2021340733978Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/06/2024322040643Open ↗
12/21/2023321588260Open ↗
06/16/2023322040643Open ↗
▸BISFINAL3
03/19/2025322071903Open ↗
01/09/2025322040643Open ↗
03/10/2023322071903Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/20/2025322071903Open ↗
Showing 1 of 3 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
03/11/2021322040643Open ↗
01/28/2021321588260Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLandmark Approval2
08/13/2026B00342222-P1Open ↗
08/13/2026B00342222-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
12/21/2023321588260Open ↗
07/25/2023321588260Open ↗
07/18/2023321588260Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/25/2025322071903Open ↗
01/09/2025322040643Open ↗
▸Filing & Intake Forms37
▸BISADDITIONAL INFORMATION26
04/08/2025321588260Open ↗
04/02/2025321588260Open ↗
02/26/2025322071903Open ↗
Showing 3 of 26 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
12/21/2023321588260Open ↗
06/29/2023321588260Open ↗
Showing 2 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents37
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION26
01/10/2025322040643Open ↗
06/28/2023322071903Open ↗
03/23/2023321588260Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026B00342222-I1Open ↗
08/13/2026B00423075-P2Open ↗
08/13/2026B00342222-P1Open ↗
▸BISUNDERPINNING (2014)1
01/09/2025322040643Open ↗
▸BISMAINTENANCE INFORMATION1
05/16/2025321588260Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
05/16/2025321588260Open ↗
▸BISPLOT DIAGRAM1
03/08/2021321588260Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/16/2025321588260Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
05/16/2025321588260Open ↗
▸BISPRECONSTRUCTION REPORT SUMMARIZING THECONDITION OF THE STRUCTURE FOR PROPOSEDUNDERPINNING1
06/16/2023322040643Open ↗
▸DOB NOWProof of Historic Building1
08/14/2026B00725177-I1Open ↗