← Back
BuildNYC
Two family frame
57 NICHOLS AVENUE
BROOKLYN · Cypress Hills · BIN 3091261
💬 Discuss this project
1899Year Built
2Stories
B2Building Class
R5Zoning
1,743 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Two family frame · 2,300 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Unit 2O23p · 2 filings · 10 docs
Floor 13p · 2 filings · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Abeja Engineering201/11/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Design Procure BuildGeneral Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Abeja Engineering7269201/11/2023
Building Lifecycle
10/08/2025
Removed or defaced a written posted vacate order. At the time of inspection, observed posted vacate order#B329/22 issued on 8/23/22 and posted on…
ECB violation · closed
04/12/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B08046928-I1-GC
04/12/2023
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
B08046928-I1-MS
02/07/2023
Permit issued — Mechanical Systems
B08046928-I1-MS
02/03/2023
Permit issued — General Construction
B08046928-I1-GC
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDesign Procure Build02/07/2023
DOB NOWGeneral ConstructionPermit IssuedDesign Procure Build02/03/2023
BISOTISSUEDHytech Solar11/09/2022
1 project · most recent 01/11/2023
Ventilation Systems
FiledStatusContractorScope
01/11/2023Permit IssuedDesign Procure BuildVentilation Systems
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/11/2023Fire-Resistance Rated ConstructionJOHANN VELEZprogress
12/11/2022Mechanical SystemsJOHANN VELEZspecial
12/11/2022Energy Code Compliance InspectionsJOHANN VELEZprogress
12/11/2022FinalJOHANN VELEZprogress
12/11/2022Interior lighting powerJOHANN VELEZenergy_progress
12/11/2022HVAC-R and service water heating equipmentJOHANN VELEZenergy_progress
11/29/2022Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
24 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account