← Back
BuildNYC
Walk-up apt, over six families with stores
57 WEST 106TH STREET
MANHATTAN · BIN 1055648
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R8AZoning
15,432 sfGross Floor Area
17Units
Rent Stabilized23 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: Manhattan Ventura · 3,700 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 6Unit 6C3p · 2 filings · 9 docs
Floor 5Unit 5B, Unit 5C7p · 2 filings · 18 docs
Floor 4
Floor 3
Floor 2
Floor 1Ventura Land Corp.Under Construction7p · 2 filings · 7 docs
CellarVentura Land CORP8p · 1 filing · 20 docs
Site & exteriorVentura Land CORPUnder Construction28p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ventura Land5107/08/2026
Manhattan Ventura903/22/2026
Northern Ventura403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arpad Baksa Architect109/16/2025
Fmo Engineering406/17/2025
Hero Architects810/05/2023
Rilder Mejia PE106/08/2022
Enthink Engineers101/05/2021
Ashraf109/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Poseidon Expediting & Consulting SE1803/21/2026
HH Building Consulting & Architectu203/21/2026
Jose A. Santos P.E.P.C203/21/2026
Jose A Santos Pepc203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mark Contracting NYGeneral Contractor1507/08/2026
Mark Contracting NY 1Scaffold507/08/2026
Intersystem InstallationScaffold303/21/2026
Rosmil Tile & Painting Cospecialty_contractor303/21/2026
Mark Contracting NYScaffold307/08/2026
Sai ContractingGeneral Contractor206/27/2026
L&J PLG & Heating Co of NYPlumbing207/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843109/16/2025
Fmo Engineering1798706/17/2025
Bangash Associates8488108/12/2024
Alpha Engineering3448110/05/2023
Jose A Santos PE3292106/08/2022
Building Lifecycle
All (142)Filed (16)Permit Issued (20)Signed Off (7)Violation (60)Inspection (3)Objection (6)Special Inspection (30)
09/30/2026
Signed off — Alteration
PROPOSE TO REPLACE EXISTING CONCRETE SLAB IN THE COURTYARD, REAR YARD, & SIDE YARD. REPLACE THE EXISTING PLATFORM AND STAIRS IN THE COURTYARD AS PER THE PLANS SUBMITTED HEREWITH.
M00689675-S1
06/23/2026
Permit issued — General Construction
M01153562-I1-GC
12/03/2025
Permit issued — General Construction
M01153562-I1-GC
11/12/2025
Permit issued — Structural
M00689675-S1-ST
11/12/2025
Permit issued — General Construction
M00689675-I1-GC
09/16/2025
Filed — Alteration
Redesign of storefront as per plans filed herewith. No change in use, egress or occupancy.
M01153562-I1
08/07/2025
Signed off — Alteration
PROPOSE TO PERFORM FACADE REPAIRS AND MINOR STRUCTURAL WORK AS PER PLANS SUBMITTED HEREWITH.
M00591748-I1
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
07/15/2025
Special inspection requirement — Final
Arpad Baksa
07/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
07/03/2025
Special inspection requirement — Masonry
FRANCESCO MO
07/03/2025
Special inspection requirement — Post-installed Anchors
FRANCESCO MO
07/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
07/03/2025
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
07/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
07/03/2025
Special inspection requirement — Final
FRANCESCO MO
07/03/2025
Special inspection requirement — Concrete - Cast-In-Place
FRANCESCO MO
06/17/2025
Filed — Alteration
REFILING APPROVED BIS APPLICATION #140996821. PROPOSE TO REPLACE SIDEWALK AND REPAIR SIDEWALK VAULT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
M01082459-P1
05/28/2025
Violation issued (HPD, closed)
B
05/28/2025
Violation issued (HPD, closed)
C
05/28/2025
Violation issued (HPD, closed)
B
05/28/2025
Violation issued (HPD, closed)
C
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
05/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/14/2025
Special inspection requirement — Final
FRANCESCO MO
05/14/2025
Special inspection requirement — Concrete - Cast-In-Place
FRANCESCO MO
05/14/2025
Special inspection requirement — Masonry
FRANCESCO MO
05/14/2025
Special inspection requirement — Post-installed Anchors
FRANCESCO MO
05/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
05/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
05/14/2025
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
11/24/2024
Violation issued (HPD, closed)
C
11/22/2024
Violation issued (HPD, closed)
C
11/17/2024
Violation issued (HPD, closed)
C
09/16/2024
Permit issued — Structural
M01082459-I1-ST
09/13/2024
Permit issued — General Construction
M01082459-I1-GC
09/13/2024
Permit issued — Structural
M00689675-S1-ST
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Scope
08/19/2024
Objection raised — Scope
08/19/2024
Objection raised — Accessibility
08/13/2024
Permit issued — Sidewalk Shed
M00447395-I1-SH
08/12/2024
Filed — Alteration
REFILING APPROVED BIS APPLICATION #140996821. PROPOSE TO REPLACE SIDEWALK AND REPAIR SIDEWALK VAULT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
M01082459-I1
07/03/2024
Filed — Alteration
PROPOSE TO REPLACE EXISTING CONCRETE SLAB IN THE COURTYARD, REAR YARD, & SIDE YARD. REPLACE THE EXISTING PLATFORM AND STAIRS IN THE COURTYARD AS PER THE PLANS SUBMITTED HEREWITH.
M00689675-P1
07/03/2024
Permit issued — Structural
M00591748-I1-GC-CX
07/03/2024
Special inspection requirement — Post-installed Anchors
FRANCESCO MO
07/03/2024
Special inspection requirement — Concrete - Cast-In-Place
FRANCESCO MO
07/03/2024
Special inspection requirement — Final
FRANCESCO MO
07/03/2024
Special inspection requirement — Subgrade Inspections
FRANCESCO MO
07/03/2024
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
07/03/2024
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
07/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
06/18/2024
Violation issued (HPD, closed)
C
06/18/2024
Violation issued (HPD, closed)
B
06/18/2024
Violation issued (HPD, closed)
B
06/18/2024
Violation issued (HPD, closed)
C
06/18/2024
Violation issued (HPD, closed)
C
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSai Contracting06/23/2026
DOB NOWGeneral ConstructionPermit IssuedSai Contracting12/03/2025
DOB NOWStructuralSigned-offMark Contracting NY11/12/2025
DOB NOWGeneral ConstructionPermit IssuedMark Contracting NY11/12/2025
DOB NOWStructuralPermit IssuedMark Contracting NY09/16/2024
DOB NOWGeneral ConstructionPermit IssuedMark Contracting NY09/13/2024
DOB NOWStructuralSigned-offMark Contracting NY09/13/2024
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY08/13/2024
DOB NOWStructuralSigned-offMark Contracting NY07/03/2024
DOB NOWGeneral ConstructionSigned-offMark Contracting NY05/22/2024
DOB NOWGeneral ConstructionSigned-offMark Contracting NY07/21/2023
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY05/12/2023
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY 105/28/2022
DOB NOWPlumbingSigned-offDPH Plumbing & Heating12/13/2021
DOB NOWGeneral ConstructionSigned-offRosmil Tile & Painting Co12/09/2021
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY 110/14/2021
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY 101/06/2021
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY11/10/2020
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY11/05/2020
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/17/2020
BISOTISSUEDRosmil Tile & Painting Co08/31/2020
BISOTISSUEDRosmil Tile & Painting Co08/31/2020
BISPLISSUEDTW Plumbing & Heating09/28/2016
BISOTISSUEDRosmil Tile & Painting Co09/23/2016
BISOTISSUEDViderel Interior Plus10/30/2015
BISPLISSUEDTW Plumbing & Heating10/14/2015
BISOTISSUEDViderel Interior Plus09/10/2015
2 projects · most recent 01/06/2021
FiledStatusContractorScope
01/06/2021Permit IssuedRichard Neu—
09/04/2020CompleteSteven Farkas—
2 projects · most recent 06/17/2025
Concrete
FiledStatusContractorScope
06/17/2025Permit IssuedMark Contracting NYConcrete
07/03/2024Permit IssuedMark Contracting NYConcrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/15/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
07/15/2025FinalArpad Baksaprogress
07/03/2025Fire-Resistance Rated ConstructionJose Santosprogress
07/03/2025MasonryFRANCESCO MOspecial
07/03/2025Post-installed AnchorsFRANCESCO MOspecial
07/03/2025Structural Steel - High Strength BoltingFRANCESCO MOspecial
07/03/2025Structural Steel - WeldingFRANCESCO MOspecial
07/03/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
07/03/2025Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
07/03/2025FinalFRANCESCO MOprogress
07/03/2025Concrete - Cast-In-PlaceFRANCESCO MOspecial
05/20/2025Fire-Resistance Rated ConstructionJose Santosprogress
05/20/2025Tenant Protection Plan Compliance—special
05/14/2025FinalFRANCESCO MOprogress
05/14/2025Concrete - Cast-In-PlaceFRANCESCO MOspecial
05/14/2025MasonryFRANCESCO MOspecial
05/14/2025Post-installed AnchorsFRANCESCO MOspecial
05/14/2025Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
05/14/2025Structural Steel - High Strength BoltingFRANCESCO MOspecial
05/14/2025Structural Steel - WeldingFRANCESCO MOspecial
07/03/2024Post-installed AnchorsFRANCESCO MOspecial
07/03/2024Concrete - Cast-In-PlaceFRANCESCO MOspecial
07/03/2024FinalFRANCESCO MOprogress
07/03/2024Subgrade InspectionsFRANCESCO MOspecial
07/03/2024Structural Steel - WeldingFRANCESCO MOspecial
Latest 25 of 42.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch10
09/03/2026M00576442-I1Request digital key ↗
09/03/2026M00577200-I1Request digital key ↗
09/02/2026M00591748-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00368124-I1Request digital key ↗
09/04/2026M00366022-P1Request digital key ↗
09/04/2026M00366022-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00397176-I1Request digital key ↗
09/04/2026M00447395-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
01/19/2021140996821Open ↗
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
08/31/2020140929351Open ↗
08/31/2020140929299Open ↗
10/07/2016122881480Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications64
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026M01082459-I1Open ↗
09/02/2026M01082459-I1Open ↗
09/02/2026M01082459-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/04/2026M00397176-I1Open ↗
09/04/2026M00447395-I1Open ↗
09/04/2026M00366022-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026M01082459-I1Open ↗
09/02/2026M01082459-I1Open ↗
09/01/2026M00368124-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/05/2018122519907Open ↗
12/20/2017122519907Open ↗
12/20/2017122519907Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
09/29/2016122881480Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/29/2016122881480Open ↗
09/16/2015122519907Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/19/2021140996821Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
05/19/2017122881480Open ↗
05/19/2017122519907Open ↗
05/04/2017122519907Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
11/19/2015122519907Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan5
09/04/2026M00397176-I1Open ↗
09/04/2026M00366022-I1Open ↗
09/04/2026M00366022-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
09/29/2016122881480Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/19/2021140996821Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/04/2026M00366022-P1Open ↗
09/04/2026M00366022-I1Open ↗
09/02/2026M00591748-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/19/2021140996821Open ↗
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/05/2018122519907Open ↗
12/20/2017122519907Open ↗
12/20/2017122519907Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/05/2018122519907Open ↗
12/20/2017122519907Open ↗
12/20/2017122519907Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸BISLIGHTING IN DWELLING UNITS2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸BISLIGHTING CONTROLS2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00576442-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/11/2021140996821Open ↗
01/19/2021140996821Open ↗
08/26/2020140929351Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/29/2022140929351Open ↗
08/29/2022140929299Open ↗
03/05/2018122519907Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL2
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT8
01/19/2021140996821Open ↗
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/26/2022140929351Open ↗
08/26/2022140929299Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
02/11/2021140996821Open ↗
05/19/2017122881480Open ↗
05/04/2017122881480Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
03/05/2018122519907Open ↗
12/20/2017122519907Open ↗
12/20/2017122519907Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
01/19/2021140996821Open ↗
08/26/2020140929351Open ↗
08/26/2020140929299Open ↗
▸BISEFILING COVER SHEET2
09/29/2016122881480Open ↗
09/16/2015122519907Open ↗