← Back
Primarily 4 family with 1 store or office
5705 6 AVENUE
BROOKLYN · BIN 3015786
💬 Discuss this project
1910Year Built
3Stories
S4Building Class
R6AZoning
6,804 sfGross Floor Area
5Units
0 Open ViolationsFDNY Report ↗
Primarily 4 family with 1 store or office · 1,480 sf lot · 4.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 1 filing · 13 docs
Floor 2
Floor 18p · 3 filings · 20 docs
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU ENGINEERING SERVICE PC702/28/2023
HPL ENGINEERING P.C.202/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor207/08/2026
CONTROL PLBG & HTG INCPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613202/28/2023
LU ENGINEERING SERVICE PC6575702/28/2023
Building Lifecycle
All (66)Filed (9)Permit Issued (4)Signed Off (3)Violation (11)Inspection (6)Objection (12)Special Inspection (21)
03/16/2023
Signed off — Alteration
CAP & REMOVE 1-STOVE, 1-SINK, 1-LAVA,1-TOILET,1-SHOWER, 1-DRYER, 1-WASHER AT CELLAR, FOR REMOVING ECB VIO.#35582070X, 35582071H. CAP/REMOVE ALL PL.FIXTURES AND PIPING, AND INSTALL NEW 1-LAVA,1-TOILET ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00780036-I1
03/16/2023
Signed off — Alteration
B00780029-I1
03/16/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND AND 3RD FLOOR, REPLACE SKYLIGHT AND SCUTTLE ON ROOF. REPAIRING CEILING, PARTITIONS, REPLACING WINDOWS AS PER PLANS. REMOVE DOB VIO.#062622CER04DM & 062722CFEU30702PN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00784906-I1
03/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/14/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/10/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/07/2023
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
03/07/2023
Special inspection requirement — Lighting in dwelling units
DONGSHENG LU
03/07/2023
Special inspection requirement — Interior lighting power
DONGSHENG LU
03/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
02/28/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND AND 3RD FLOOR, REPLACE SKYLIGHT AND SCUTTLE ON ROOF. REPAIRING CEILING, PARTITIONS, REPLACING WINDOWS AS PER PLANS. REMOVE DOB VIO.#062622CER04DM & 062722CFEU30702PN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00784906-P1
02/28/2023
Filed — Alteration
B00780029-P3
02/27/2023
Special inspection requirement — Fenestration areas
Fran Huang
02/27/2023
Special inspection requirement — Air barrier - visual inspection
Fran Huang
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
02/27/2023
Special inspection requirement — Interior lighting power
DONGSHENG LU
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
02/27/2023
Special inspection requirement — Fenestration air leakage
Fran Huang
02/27/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
02/27/2023
Special inspection requirement — Lighting in dwelling units
DONGSHENG LU
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
12/29/2022
Filed — Alteration
CAP & REMOVE 1-STOVE, 1-SINK, 1-LAVA,1-TOILET,1-SHOWER, 1-DRYER, 1-WASHER AT CELLAR, FOR REMOVING ECB VIO.#35582070X, 35582071H. CAP/REMOVE ALL PL.FIXTURES AND PIPING, AND INSTALL NEW 1-LAVA,1-TOILET ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00780036-P2
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
11/17/2022
Filed — Alteration
B00780029-P2
11/15/2022
Special inspection requirement — Lighting in dwelling units
DONGSHENG LU
11/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
11/15/2022
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
11/15/2022
Special inspection requirement — Interior lighting power
DONGSHENG LU
10/21/2022
Permit issued — Plumbing
B00780036-I1-PL
10/12/2022
Permit issued — General Construction
B00784906-I1-GC
10/11/2022
Filed — Alteration
CAP & REMOVE 1-STOVE, 1-SINK, 1-LAVA,1-TOILET,1-SHOWER, 1-DRYER, 1-WASHER AT CELLAR, FOR REMOVING ECB VIO.#35582070X, 35582071H. CAP/REMOVE ALL PL.FIXTURES AND PIPING, AND INSTALL NEW 1-LAVA,1-TOILET ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00780036-P1
10/11/2022
Permit issued — General Construction
B00780029-I1-GC
10/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/05/2022
Permit issued — Plumbing
B00780036-I1-PL
10/05/2022
Objection raised — Other
10/05/2022
Objection raised — Other
10/04/2022
Objection raised — Other
09/29/2022
Objection resolved — Addressed
09/29/2022
Objection resolved — Addressed
09/13/2022
Filed — Alteration
B00780029-P1
08/26/2022
Objection raised — Other
08/26/2022
Objection raised — Other
08/26/2022
Objection raised — Other
08/02/2022
Filed — Alteration
CAP & REMOVE 1-STOVE, 1-SINK, 1-LAVA,1-TOILET,1-SHOWER, 1-DRYER, 1-WASHER AT CELLAR, FOR REMOVING ECB VIO.#35582070X, 35582071H. CAP/REMOVE ALL PL.FIXTURES AND PIPING, AND INSTALL NEW 1-LAVA,1-TOILET ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00780036-I1
08/02/2022
Filed — Alteration
B00780029-I1
08/01/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND AND 3RD FLOOR, REPLACE SKYLIGHT AND SCUTTLE ON ROOF. REPAIRING CEILING, PARTITIONS, REPLACING WINDOWS AS PER PLANS. REMOVE DOB VIO.#062622CER04DM & 062722CFEU30702PN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00784906-I1
06/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2022
Violation issued (ECB, closed)
Construction
06/26/2022
Violation issued (ECB, closed)
Construction
06/24/2022
Violation issued (ECB, closed)
Zoning
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCONTROL PLBG & HTG INC10/21/2022
DOB NOWGeneral ConstructionSigned-offMEGA GENERAL CONSTRUCTION10/12/2022
DOB NOWGeneral ConstructionSigned-offMEGA GENERAL CONSTRUCTION10/11/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC10/05/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/07/2023Energy Code Compliance InspectionsDONGSHENG LUprogress
03/07/2023Lighting in dwelling unitsDONGSHENG LUenergy_progress
03/07/2023Interior lighting powerDONGSHENG LUenergy_progress
03/07/2023Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
02/27/2023Fenestration areasFran Huangenergy_progress
02/27/2023Air barrier - visual inspectionFran Huangenergy_progress
02/27/2023Fire-Resistant Penetrations and JointsFran Huangspecial
02/27/2023Interior lighting powerDONGSHENG LUenergy_progress
02/27/2023Energy Code Compliance InspectionsFran Huangprogress
02/27/2023Fenestration air leakageFran Huangenergy_progress
02/27/2023Fenestration and door U-factor and product ratingsFran Huangenergy_progress
02/27/2023Energy Code Compliance InspectionsDONGSHENG LUprogress
02/27/2023Lighting in dwelling unitsDONGSHENG LUenergy_progress
02/27/2023Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
02/01/2023Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
12/27/2022Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
11/15/2022Lighting in dwelling unitsDONGSHENG LUenergy_progress
11/15/2022Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
11/15/2022Energy Code Compliance InspectionsDONGSHENG LUprogress
11/15/2022Interior lighting powerDONGSHENG LUenergy_progress
10/07/2022Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B00784906-P1Request digital key ↗
08/28/2026B00780029-P3Request digital key ↗
08/28/2026B00780029-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00780029-I1Open ↗
09/01/2026B00780029-I1Open ↗
09/01/2026B00780029-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026B00784906-I1Open ↗
08/28/2026B00784906-P1Open ↗
08/28/2026B00780029-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00780036-P2Open ↗
09/01/2026B00780029-I1Open ↗
09/01/2026B00780029-P3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B00784906-P1Open ↗
08/28/2026B00780029-P3Open ↗
08/28/2026B00780029-P2Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00780029-I1Open ↗
08/13/2026B00784906-I1Open ↗