← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
571 HUDSON STREET
MANHATTAN · West Village · BIN 1011921
💬 Discuss this project
1892Year Built
5Stories
D0Building Class
C1-6Zoning
22,671 sfGross Floor Area
17Units
Rent Stabilized0 Active Violations 1 likely answered 1 old, status unconfirmed ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: 571 Hudson St Apt · 3,605 sf lot · 6.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof571 Hudson ST. APT. CORPUnder Construction7p · 2 filings · 12 docs
Floor 6Unit 6DUnder Construction22p · 2 filings · 20 docs
Floor 5Unit 5A, Unit PH6CUnder Construction16p · 4 filings · 20 docs
Floor 4
Floor 314p · 3 filings · 20 docs
Floor 2Unit 2B14p · 3 filings · 20 docs
Floor 1Unit 1A6p · 3 filings · 9 docs
MezzanineUnder Construction29p · 7 filings · 20 docs
CellarRetail Tenant Fit-Out2p · 2 filings · 5 docs
Site & exterior571 Hudson ST. APT. CORP57p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
571 Hudson St Apartment5107/08/2026
GFP Real Estate1107/08/2026
Cfa Managemt 571 Hudson St203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Nexus Consulting NYC1003/21/2026
Municipal Building Consultants603/21/2026
Sol Building Consulting Services603/21/2026
S M Expediting203/21/2026
JP Expedite203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Callahan ContractingGeneral Contractor1104/09/2026
LemxScaffold1007/08/2026
Tolmac ConceptsGeneral Contractor1007/08/2026
Gratia ContractorsGeneral Contractor603/21/2026
Preserv BLD Restoration ManagementGeneral Contractor307/08/2026
Etna ContractingGeneral Contractor307/08/2026
Rite Way HeatingPlumbing207/08/2026
DNA Plumbing ContractorsPlumbing207/08/2026
Metrotech MechanicalPlumbing207/08/2026
Kepler Electrical ContElectrical103/21/2026
Preserv BLD Restoration ManagementScaffold107/08/2026
Signs CadSign hanger107/08/2026
Elpo Electrical ContgElectrical103/22/2026
CarpexGeneral Contractor108/14/2026
5 Points RehabGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Kris Kozlowski Architect3955106/23/2026
Sia Inspections7306305/07/2025
Metric Consulting and Ins1803209/16/2024
March Chadwick, Architect2253408/30/2023
Linea3155405/09/2023
Chen Engineering Services1826503/01/2023
AM Design Studio4413108/08/2022
Building Lifecycle
10/15/2026
Filed — Alteration
Renovation of Apt 1A on the 1st floor and cellar. Replace windows and doors. Raise ceiling in cellar. No change in use, egress or occupancy.
M01472690-I1
10/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/12/2026
Special inspection requirement — Air barrier - visual inspection
10/12/2026
Special inspection requirement — Fenestration areas
10/12/2026
Special inspection requirement — Fenestration air leakage
172 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCarpex08/13/2026
DOB NOWPlumbingPermit IssuedRite Way Heating06/04/2026
DOB NOWGeneral ConstructionPermit IssuedCallahan Contracting12/15/2025
DOB NOWStructuralPermit IssuedCallahan Contracting12/15/2025
DOB NOWMechanical SystemsPermit IssuedCallahan Contracting05/30/2025
DOB NOWPlumbingPermit IssuedLS Plumbing05/20/2025
DOB NOWStructuralPermit IssuedCallahan Contracting05/12/2025
DOB NOWGeneral ConstructionPermit IssuedCallahan Contracting05/12/2025
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management07/09/2024
DOB NOWPlumbingSigned-offDNA Plumbing Contractors04/08/2024
DOB NOWSidewalk ShedSigned-offLemx02/08/2024
DOB NOWSupported ScaffoldSigned-offLemx02/08/2024
DOB NOWSuspended ScaffoldPermit IssuedPreserv BLDNG RST Management I01/10/2024
DOB NOWGeneral ConstructionSigned-offGratia Contractors09/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management09/06/2023
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management07/10/2023
DOB NOWSignSigned-offSigns Cad05/22/2023
DOB NOWPlumbingSigned-offMetrotech Mechanical04/19/2023
DOB NOWSidewalk ShedSigned-offLemx02/11/2023
DOB NOWSupported ScaffoldSigned-offLemx02/11/2023
DOB NOWPlumbingSigned-offDNA Plumbing Contractors01/31/2023
DOB NOWGeneral ConstructionSigned-offTolmac Concepts01/25/2023
DOB NOWMechanical SystemsSigned-offTolmac Concepts01/25/2023
DOB NOWGeneral ConstructionSigned-offGratia Contractors01/23/2023
DOB NOWGeneral ConstructionSigned-off5 Points Rehab09/12/2022
DOB NOWStructuralSigned-offEtna Contracting07/05/2022
DOB NOWGeneral ConstructionSigned-offEtna Contracting06/14/2022
DOB NOWMechanical SystemsSigned-offTolmac Concepts04/20/2022
DOB NOWGeneral ConstructionSigned-offTolmac Concepts04/20/2022
DOB NOWPlumbingSigned-offMetrotech Mechanical04/12/2022
BISMHISSUEDSystems 2000 Plumbing Services04/20/2018
BISOTISSUEDTouch of Class General04/30/2015
BISMHISSUEDLazar Mechanical02/24/2014
BISMHISSUEDUltra Group Development01/12/2012
BISOTISSUEDUltra Group Development10/28/2011
BISBLISSUEDMaxwell Plumbing Mechanical05/19/2010
BISPLISSUEDMaxwell Plumbing Mechanical05/19/2010
BISPLISSUEDPeter Miceli Plumbing05/07/2007
BISOTISSUEDModular Metals04/16/2007
BISOTISSUEDNY Landmark Construction04/04/2007
+ 12 more permits on file
3 projects · most recent 06/23/2026
Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems
FiledStatusContractorScope
06/23/2026Permit IssuedCarpexHeating and Air Conditioning Systems
05/07/2025Permit IssuedCallahan ContractingAir Conditioning Systems, Heating Systems
04/08/2025——Air Conditioning Systems, Heating Systems
2 projects · most recent 09/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2026Permit IssuedRite Way HeatingGas, Water/Sanitary
04/08/2025——Gas, Water/Sanitary
5 projects · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026CompleteGlendale Electl Contng—
12/21/2025Permit IssuedKepler Electrical ContGeneral Wiring
04/05/2024CompleteKet ElectricGeneral Wiring
02/07/2023CompleteElpo Electrical Contg—
06/01/2022CompleteS.E. Electl ContngGeneral Wiring
3 projects · most recent 10/15/2026
Wood Concrete
FiledStatusContractorScope
10/15/2026——Concrete, Wood
05/07/2025Permit IssuedCallahan ContractingWood
04/08/2025——Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/09/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/15/2026Fire-Resistant Penetrations and Joints—special
10/12/2026Air barrier - visual inspection—energy_progress
10/12/2026Fenestration areas—energy_progress
10/12/2026Fenestration air leakage—energy_progress
10/12/2026Lighting in dwelling units—energy_progress
10/12/2026Fenestration and door U-factor and product ratings—energy_progress
10/12/2026Concrete - Cast-In-Place—special
10/09/2026Final—progress
10/09/2026Structural Stability – Alterations of existing buildings—special
10/09/2026Tenant Protection Plan Compliance—special
05/07/2025FinalSOFIA KAPELYANprogress
05/07/2025Mechanical SystemsJEFF AKERMANspecial
05/07/2025Heating SystemsJEFF AKERMANspecial
04/04/2025Wood – Seismic Resistance—special
04/04/2025Structural Stability – Alterations of existing buildings—special
04/03/2025Final—progress
04/03/2025Mechanical Systems—special
04/03/2025Heating Systems—special
04/03/2025Structural Wood Frame—progress
04/03/2025Final—progress
04/02/2025Fire-Resistant Penetrations and Joints—special
04/02/2025Final—progress
07/24/2024FinalChrista Waringprogress
07/24/2024MasonrySAMI HAJJAR P.Especial
08/17/2023Fire-Resistance Rated ConstructionAlan Bermanprogress
Latest 25 of 45.
261 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account