Health center, child center, clinic
Perlmutter Cancer Center Sunset Park
5718 2 AVENUE · Name © OpenStreetMap contributors · BIN 3015571
💬 Discuss this project
1959Year Built
2Stories
I5Building Class
M3-1Zoning
28,698 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Health center, child center, clinic · 12,500 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof6p · 2 filings · 20 docs
Floor 22p · 1 filing · 4 docs
Floor 16p · 2 filings · 20 docs
2 jobs · most recent 06/24/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2025Signed-offB.R. FRIES & ASSOCIATES LAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Riedel 17KW 17 kW · Chiller ×3
Heating
Anemostat EZTS 13,800 BTU · Vav Box ×15
Ventilation
Greenheck FJC-307-BI 400 CFM · Exhaust Fan ×2
N/A n/a 400 CFM ×1
05/21/2025Signed-offB.R. FRIES & ASSOCIATES LAir Conditioning Systems, Heating Systems
Cooling
Haskris OPC3-3G2c05-B-EK-6 Chiller ×2
MPC3 Chiller ×1
Heating
Berner ARD12-2084E 3,310 CFM · Air Curtain ×3
1 job · most recent 06/24/2025
FiledStatusContractorScope
06/24/2025Signed-offASHLAR MECHANICAL CORP—
2 jobs · most recent 06/24/2025
Water/Sanitary
FiledStatusContractorScope
06/24/2025Signed-offLOUIS L.BUTTERMARK & SONSWater/Sanitary
05/21/2025Signed-offLOUIS L.BUTTERMARK & SONSWater/Sanitary
4 jobs · most recent 11/24/2025
General Wiring Lighting
FiledStatusContractorScope
11/24/2025CompleteBIGMAN BROS., INC.General Wiring
07/29/2019CompleteRAINBOW ELECTRIC CO., INC—
12/19/2018CompleteNTS ELECTRICAL, INC—
07/18/2018CompleteA.S.R. ELEC'L CONTR'G INCGeneral Wiring, Lighting
2 jobs · most recent 06/24/2025
Steel Concrete
FiledStatusContractorScope
06/24/2025Signed-offB.R. FRIES & ASSOCIATES LSteel, Concrete
05/21/2025Signed-offB.R. FRIES & ASSOCIATES LSteel
Building Lifecycle
All (199)Filed (29)Permit Issued (30)Signed Off (18)Violation (24)Inspection (16)Objection (52)Special Inspection (30)
05/28/2026
Signed off — Alteration
filing to install new medical chiller for the PET CT with city water by pass panel for back up cooling and provide new hot lab exhaust system. Ductwork for new examrooms. relocate radiant panel -Phase 2 PET CT. No change in use, egress, or occupancy
B01022855-S3
11/07/2025
Signed off — Alteration
reno of existing office space adding new plumbing fixtures to existing linac support space on first floor - phase 1B LINAC program. No change in use, egress, or occupancy.
B01018011-S3
10/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Signed off — Alteration
filing to install new medical chiller for the PET CT with city water by pass panel for back up cooling and provide new hot lab exhaust system. Ductwork for new examrooms. relocate radiant panel -Phase 2 PET CT. No change in use, egress, or occupancy
B01022855-S4
09/15/2025
Signed off — Alteration
THE PROJECT ENTAILS THE MODIFICATION OF EXISTING STEEL DUNNAGE TO ACCOMMODATE A NEW ROOFTOP UNIT AND MODIFICATION OF EXISTING RAISED SLAB AT THE FIRST FLOOR. - PHASE 1A ADMIN REVIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01022363-S3
09/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/21/2025
Signed off — Alteration
reno of existing office space adding new plumbing fixtures to existing linac support space on first floor - phase 1B LINAC program. No change in use, egress, or occupancy.
B01018011-S1
08/15/2025
Signed off — Alteration
reno of existing office space adding new plumbing fixtures to existing linac support space on first floor - phase 1B LINAC program. No change in use, egress, or occupancy.
B01018011-S4
08/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2025
Special inspection requirement — Smoke Control Systems Testing
Young Suh
07/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
07/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
07/03/2025
Special inspection requirement — Final
Young Suh
07/03/2025
Special inspection requirement — Maintenance information
Young Suh
07/03/2025
Special inspection requirement — Mechanical Systems
Young Suh
07/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
07/03/2025
Special inspection requirement — Heating Systems
Young Suh
07/03/2025
Special inspection requirement — Post-installed Anchors
Young Suh
06/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
06/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
06/30/2025
Special inspection requirement — Final
Young Suh
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
06/30/2025
Special inspection requirement — Maintenance information
Young Suh
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/30/2025
Special inspection requirement — Post-installed Anchors
Young Suh
06/30/2025
Special inspection requirement — Smoke Control Systems Testing
Young Suh
06/30/2025
Special inspection requirement — Shutoff dampers
Young Suh
06/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
06/30/2025
Special inspection requirement — Post-installed Anchors
Young Suh
06/30/2025
Special inspection requirement — Mechanical Systems
Young Suh
06/30/2025
Special inspection requirement — Heating Systems
Young Suh
06/24/2025
Filed — Alteration
filing to install new medical chiller for the PET CT with city water by pass panel for back up cooling and provide new hot lab exhaust system. Ductwork for new examrooms. relocate radiant panel -Phase 2 PET CT. No change in use, egress, or occupancy
B01022855-P4
06/24/2025
Filed — Alteration
filing to install new medical chiller for the PET CT with city water by pass panel for back up cooling and provide new hot lab exhaust system. Ductwork for new examrooms. relocate radiant panel -Phase 2 PET CT. No change in use, egress, or occupancy
B01022855-P5
06/24/2025
Objection resolved — Addressed
06/12/2025
Permit issued — Mechanical Systems
B01022855-S1-MS
06/06/2025
Signed off — Alteration
THE PROJECT ENTAILS THE MODIFICATION OF EXISTING STEEL DUNNAGE TO ACCOMMODATE A NEW ROOFTOP UNIT AND MODIFICATION OF EXISTING RAISED SLAB AT THE FIRST FLOOR. - PHASE 1A ADMIN REVIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01022363-S2
06/06/2025
Signed off — Alteration
reno of existing office space adding new plumbing fixtures to existing linac support space on first floor - phase 1B LINAC program. No change in use, egress, or occupancy.
B01018011-S2
06/03/2025
Objection raised — Admin
05/21/2025
Filed — Alteration
THE PROJECT ENTAILS THE MODIFICATION OF EXISTING STEEL DUNNAGE TO ACCOMMODATE A NEW ROOFTOP UNIT AND MODIFICATION OF EXISTING RAISED SLAB AT THE FIRST FLOOR. - PHASE 1A ADMIN REVIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01022363-P3
05/19/2025
Signed off — Alteration
filing to install new medical chiller for the PET CT with city water by pass panel for back up cooling and provide new hot lab exhaust system. Ductwork for new examrooms. relocate radiant panel -Phase 2 PET CT. No change in use, egress, or occupancy
B01022855-I1
05/16/2025
Special inspection requirement — Mechanical Systems
Young Suh
05/16/2025
Special inspection requirement — Post-installed Anchors
Young Suh
05/16/2025
Special inspection requirement — Smoke Control Systems Testing
Young Suh
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
05/16/2025
Special inspection requirement — Heating Systems
Young Suh
05/16/2025
Special inspection requirement — Final
Young Suh
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
03/28/2025
Objection resolved — Addressed
03/17/2025
Objection raised — Scope
03/04/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/03/2025
Filed — Alteration
filing to install new medical chiller for the PET CT with city water by pass panel for back up cooling and provide new hot lab exhaust system. Ductwork for new examrooms. relocate radiant panel -Phase 2 PET CT. No change in use, egress, or occupancy
B01022855-P3
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2025
Permit issued — Structural
B01022855-S4-ST
12/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/03/2024
Signed off — Alteration
THE PROJECT ENTAILS THE MODIFICATION OF EXISTING STEEL DUNNAGE TO ACCOMMODATE A NEW ROOFTOP UNIT AND MODIFICATION OF EXISTING RAISED SLAB AT THE FIRST FLOOR. - PHASE 1A ADMIN REVIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01022363-I1
11/14/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 199 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYU LANGONE HEALTH4407/08/2026
STARR INDUSTRIES2007/08/2026
TO OWNER OF 5718 2ND AVEN103/22/2026
BENJAMIN MAINTENANCE1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/17/2016$12.1M—S.I.B.R. REALTY, LLC → Private party$422/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYSKA HENNESSY GROUP1606/24/2025
SEVERUD ASSOCIATES CONSULTING ENGIN403/03/2025
EFH ARCHITECTURE504/17/2024
JOSE L. PENA,P.E.306/04/2019
TOHFAZ UDDIN PE PC111/10/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.5003/21/2026
LOUIS STRIAR603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STARR INDUSTRIES LLCGeneral Contractor2507/08/2026
B.R. FRIES & ASSOCIATES LLCGeneral Contractor1307/08/2026
ACTIVE SIGNSScaffold307/08/2026
EMPIRE GENERAL CONTRACTINGeneral Contractor307/08/2026
LOUIS L.BUTTERMARK & SONSPlumbing307/08/2026
BIGMAN BROS., INC.Electrical203/22/2026
ASHLAR MECHANICAL CORPFire Protection207/08/2026
ALLIANCE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4232506/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offB.R. FRIES & ASSOCIATES L06/12/2025
DOB NOWStructuralSigned-offB.R. FRIES & ASSOCIATES L01/08/2025
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP10/22/2024
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS10/18/2024
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP09/19/2024
DOB NOWStructuralSigned-offB.R. FRIES & ASSOCIATES L09/16/2024
DOB NOWStructuralSigned-offB.R. FRIES & ASSOCIATES L09/16/2024
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS06/26/2024
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS06/26/2024
DOB NOWMechanical SystemsSigned-offB.R. FRIES & ASSOCIATES L06/11/2024
DOB NOWGeneral ConstructionSigned-offB.R. FRIES & ASSOCIATES L06/11/2024
DOB NOWGeneral ConstructionSigned-offB.R. FRIES & ASSOCIATES L06/10/2024
DOB NOWMechanical SystemsSigned-offB.R. FRIES & ASSOCIATES L06/10/2024
DOB NOWGeneral ConstructionSigned-offB.R. FRIES & ASSOCIATES L06/10/2024
DOB NOWMechanical SystemsSigned-offB.R. FRIES & ASSOCIATES L06/10/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/16/2023
DOB NOWMechanical SystemsSigned-offEMPIRE GENERAL CONTRACTIN05/09/2023
DOB NOWGeneral ConstructionSigned-offEMPIRE GENERAL CONTRACTIN05/03/2023
DOB NOWSignSigned-offACTIVE SIGNS INC06/12/2019
DOB NOWSignSigned-offACTIVE SIGNS INC06/12/2019
DOB NOWSignSigned-offACTIVE SIGNS INC06/12/2019
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC06/20/2018
DOB NOWSupported ScaffoldSigned-offSTARR INDUSTRIES LLC06/20/2018
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC06/20/2018
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC03/29/2018
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC03/26/2018
DOB NOWSupported ScaffoldSigned-offSTARR INDUSTRIES LLC03/26/2018
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC11/14/2017
DOB NOWSidewalk ShedSigned-offSTARR INDUSTRIES LLC11/14/2017
DOB NOWSupported ScaffoldSigned-offSTARR INDUSTRIES LLC11/14/2017
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION07/24/2020
BIS—RE-ISSUEDHUNTER ROBERTS CONSTRUCTION11/19/2019
BISFPISSUEDCURRENT FIRE PROTECTION INC10/15/2019
BISFPISSUEDCURRENT FIRE PROTECTION INC03/21/2019
BISSPISSUEDCURRENT FIRE PROTECTION INC12/26/2018
BISEQISSUEDHUNTER ROBERTS CONSTRUCTION12/04/2018
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION12/04/2018
BISPLISSUEDLOUIS L.BUTTERMARK & SONS11/08/2018
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION09/21/2018
BISBLISSUEDBONDEE ENTERPRISES INC09/12/2018
+ 12 more permits on file
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
10/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/14/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Pass-Final PL - UndergroundPassView ↗
07/19/2024Pass-Final PL - UndergroundPassView ↗
09/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
07/03/2025Heating SystemsYoung Suhspecial
07/03/2025Energy Code Compliance InspectionsYoung Suhprogress
07/03/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
07/03/2025Maintenance informationYoung Suhenergy_progress
07/03/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
07/03/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
07/03/2025FinalYoung Suhprogress
07/03/2025Mechanical SystemsYoung Suhspecial
07/03/2025Smoke Control Systems TestingYoung Suhspecial
07/03/2025Post-installed AnchorsYoung Suhspecial
06/30/2025Maintenance informationYoung Suhenergy_progress
06/30/2025Shutoff dampersYoung Suhenergy_progress
06/30/2025Post-installed AnchorsYoung Suhspecial
06/30/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/30/2025Mechanical SystemsYoung Suhspecial
06/30/2025Post-installed AnchorsYoung Suhspecial
06/30/2025Smoke Control Systems TestingYoung Suhspecial
06/30/2025Heating SystemsYoung Suhspecial
06/30/2025Energy Code Compliance InspectionsYoung Suhprogress
06/30/2025FinalYoung Suhprogress
06/30/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
06/30/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
06/30/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
05/16/2025Heating SystemsYoung Suhspecial
05/16/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
Latest 25 of 103.
▾Documents — 403 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch26
09/03/2026B00001118-I1Request digital key ↗
08/27/2026B00859742-I1Request digital key ↗
08/27/2026B00862515-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/02/2026B00164563-I1Request digital key ↗
09/02/2026B00164575-I1Request digital key ↗
09/02/2026B00164552-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION27
11/02/2020321193702Open ↗
04/10/2020321193702Open ↗
11/08/2019321193702Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION13
11/21/2019321193702Open ↗
03/21/2019321761303Open ↗
12/05/2018321193702Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
03/21/2019340516640Open ↗
02/01/2019321193702Open ↗
01/29/2019340514811Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/28/2018321193702Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
04/26/2021321193702Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/26/2021321193702Open ↗
▸Seals & Professional Certifications90
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/03/2026B00001118-I1Open ↗
09/02/2026B00164563-I1Open ↗
09/02/2026B00164575-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026B01022363-P3Open ↗
09/01/2026B01022363-P3Open ↗
08/31/2026B00862509-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026B01022363-S2Open ↗
09/01/2026B00862515-I1Open ↗
09/01/2026B01022363-P3Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
09/30/2019321629546Open ↗
09/30/2019321629546Open ↗
05/07/2019321629546Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING14
06/24/2020321193702Open ↗
05/04/2020321193702Open ↗
04/10/2020321193702Open ↗
Showing 3 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
01/27/2021321761303Open ↗
11/13/2020321579092Open ↗
11/18/2019321801608Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS4
02/18/2021321193702Open ↗
02/18/2021321193702Open ↗
02/18/2021321193702Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
02/18/2021321193702Open ↗
02/18/2021321193702Open ↗
01/08/2021321193702Open ↗
▸BISEQUIPMENT USE PERMIT1
01/08/2021321193702Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/22/2018340514811Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
02/06/2019321193702Open ↗
▸Safety & Tenant Protection7
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
11/14/2017321193702Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE CHECKLIST3
10/31/2017321193702Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE SIGNOFF1
04/26/2021321193702Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/02/2026B00164563-I1Open ↗
09/02/2026B00164575-I1Open ↗
09/02/2026B00164552-I1Open ↗
Showing 3 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
04/29/2019340514811Open ↗
04/29/2019321193702Open ↗
02/22/2018340514811Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/25/2019321193702Open ↗
11/21/2017340514811Open ↗
11/01/2017321193702Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/18/2019340514811Open ↗
04/29/2019321193702Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY15
04/28/2021321193702Open ↗
04/28/2021321193702Open ↗
12/18/2020321193702Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/14/2017321193702Open ↗
11/14/2017321193702Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/28/2019321193702Open ↗
11/14/2017321193702Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
12/14/2017340516640Open ↗
▸BISDEP Hydrant Flow Test Letter1
11/21/2017340516640Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/13/2017340516640Open ↗
▸BISSOIL REPORT1
10/31/2017321193702Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
02/22/2018321193702Open ↗
▸Approvals, Objections & Sign-offs59
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/25/2026B01018011-S3Open ↗
08/25/2026B01018011-S4Open ↗
08/25/2026B01018011-S2Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
02/04/2021321761303Open ↗
01/04/2021321193702Open ↗
09/28/2020321193702Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
11/13/2020321579092Open ↗
12/09/2019321579092Open ↗
12/09/2019321801608Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
10/31/2017321193702Open ↗
Showing 1 of 2 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
05/15/2019321579092Open ↗
▸BISSUPERSEDING LETTER1
11/21/2019321193702Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT14
04/26/2021321193702Open ↗
02/04/2021321761303Open ↗
12/09/2019321579092Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
11/21/2019321193702Open ↗
01/02/2018321629546Open ↗
Showing 2 of 3 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
01/02/2018321629546Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION19
03/26/2021321193702Open ↗
06/24/2020321193702Open ↗
03/16/2020321193702Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM15
04/22/2020321193702Open ↗
02/21/2020321193702Open ↗
02/06/2020321193702Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET8
03/08/2019321761303Open ↗
08/23/2018321822587Open ↗
07/26/2018321801608Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents7
▸BISSupporting Document: Fee Exempt2
09/28/2020321193702Open ↗
11/21/2017340516640Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/25/2018321193702Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
01/02/2018321629546Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/14/2017340516640Open ↗