← Back
Three families
572 MAC DONOUGH STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3047311
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R6BZoning
2,430 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: R.B MACDONOUGH LLC · 1,800 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof2p · 1 filing · 7 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar2p · 1 filing · 18 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R.B MACDONOUGH LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D&E BUILD EVERGREEN INC.307/18/2025
PETER CHO ARCHITECTS, PLLC108/12/2024
NY BUILDING ASSOCIATES INC105/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R SOLAR DESIGN203/21/2026
METRO DESIGN CONSULTANTS INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HYTECH SOLAR INCGeneral Contractor307/08/2026
JOHN FARR P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342407/18/2025
NKM ENGINEERING PLLC6244105/02/2024
Building Lifecycle
All (43)Filed (5)Permit Issued (3)Signed Off (3)Violation (2)Inspection (3)Objection (4)Special Inspection (23)
09/15/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01045259-I1
08/07/2025
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE TO RECONFIGURE GAS PIPING CONNECTED TO EXISTING GAS EQUIPMENT AND REPLACEMENT OF EXISTING ELECTRIC WATER HEATER.
B01084424-I1
08/07/2025
Signed off — Alteration
B01084413-I1
07/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
07/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
07/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
07/25/2025
Special inspection requirement — Maintenance information
Danny Chen
07/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
07/18/2025
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE TO RECONFIGURE GAS PIPING CONNECTED TO EXISTING GAS EQUIPMENT AND REPLACEMENT OF EXISTING ELECTRIC WATER HEATER.
B01084424-P2
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
07/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
07/18/2025
Special inspection requirement — Maintenance information
Danny Chen
07/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
06/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2025
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE TO RECONFIGURE GAS PIPING CONNECTED TO EXISTING GAS EQUIPMENT AND REPLACEMENT OF EXISTING ELECTRIC WATER HEATER.
B01084424-P1
03/28/2025
Permit issued — Mechanical Systems
B01084413-I1-MS
10/16/2024
Permit issued — Plumbing
B01084424-I1-PL
10/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
10/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
10/07/2024
Special inspection requirement — Maintenance information
Danny Chen
10/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
08/12/2024
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE TO RECONFIGURE GAS PIPING CONNECTED TO EXISTING GAS EQUIPMENT AND REPLACEMENT OF EXISTING ELECTRIC WATER HEATER.
B01084424-I1
08/12/2024
Filed — Alteration
B01084413-I1
08/07/2024
Permit issued — Solar
B01045259-I1-SL
06/20/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/03/2024
Objection raised — Structural
05/03/2024
Objection raised — Other
05/02/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01045259-I1
05/02/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
05/02/2024
Special inspection requirement — Final
NARESH MAHANGU
05/02/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHYTECH SOLAR03/28/2025
DOB NOWPlumbingSigned-offJOHN FARR P & H CORP10/16/2024
DOB NOWSolarSigned-offHYTECH SOLAR08/07/2024
BISMHISSUEDH.P.N. CONSTRUCTION CORP01/29/2018
BISMHISSUEDH.P.N. CONSTRUCTION CORP01/29/2018
BISOTISSUEDTAYLORMADE CONTRACTING LL02/13/2015
BISPLISSUEDNCA PLUMBING&HEATING LLC12/13/2013
BISPLISSUEDNCA PLUMBING&HEATING LLC09/30/2013
1 project · most recent 05/28/2025
FiledStatusContractorScope
05/28/2025CompleteGMJ ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/25/2025Energy Code Compliance InspectionsDanny Chenprogress
07/25/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
07/25/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
07/25/2025Maintenance informationDanny Chenenergy_progress
07/25/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
07/25/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
07/18/2025Energy Code Compliance InspectionsDanny Chenprogress
07/18/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
07/18/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
07/18/2025Maintenance informationDanny Chenenergy_progress
07/18/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
07/18/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
10/07/2024HVAC-R and service water piping design and insulationDanny Chenenergy_progress
10/07/2024Fire-Resistant Penetrations and JointsDanny Chenspecial
10/07/2024Energy Code Compliance InspectionsDanny Chenprogress
10/07/2024HVAC-R and service water heating equipmentDanny Chenenergy_progress
10/07/2024Maintenance informationDanny Chenenergy_progress
10/07/2024HVAC-R and service water heating system controlsDanny Chenenergy_progress
05/02/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
05/02/2024FinalNARESH MAHANGUprogress
05/02/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/02/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/02/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B01045259-I1Request digital key ↗
08/24/2026B01084413-I1Request digital key ↗
08/21/2026B01084424-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
02/13/2018320907587Open ↗
08/12/2014320936699Open ↗
01/03/2014320731473Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
01/30/2018320907587Open ↗
01/30/2018320731473Open ↗
02/14/2015320936699Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/05/2018320907587Open ↗
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/15/2018320731473Open ↗
02/15/2018320907587Open ↗
05/05/2015320936699Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026B01084424-I1Open ↗
09/29/2026B01084424-I1Open ↗
09/12/2026B01045259-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B01045259-I1Open ↗
08/24/2026B01084413-I1Open ↗
08/21/2026B01084424-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026B01084424-I1Open ↗
09/12/2026B01045259-I1Open ↗
08/26/2026B01084424-P2Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/13/2018320907587Open ↗
12/18/2013320731473Open ↗
09/18/2013320907587Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/18/2013320731473Open ↗
09/18/2013320907587Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
02/01/2014320731473Open ↗
01/30/2014320731473Open ↗
01/03/2014320907587Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
12/18/2013320731473Open ↗
09/18/2013320907587Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/03/2014320731473Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B01045259-I1Open ↗
08/24/2026B01084413-I1Open ↗
08/21/2026B01084424-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
02/15/2018320731473Open ↗
02/15/2018320907587Open ↗
05/05/2015320936699Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/15/2018320731473Open ↗
02/15/2018320907587Open ↗
05/05/2015320936699Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/25/2014320936699Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/15/2018320731473Open ↗
02/15/2018320907587Open ↗
05/05/2015320936699Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
08/12/2014320936699Open ↗
12/18/2013320731473Open ↗
09/18/2013320907587Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/05/2015320936699Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01045259-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
02/15/2018320731473Open ↗
02/15/2018320907587Open ↗
05/05/2015320936699Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
08/12/2014320936699Open ↗
12/18/2013320731473Open ↗
09/18/2013320907587Open ↗
▸BISBOROUGH INTAKE FORM2
02/15/2018320731473Open ↗
02/15/2018320907587Open ↗
▸BISADDITIONAL INFORMATION1
02/13/2018320907587Open ↗
▸Other Documents1
▸BISOP-4 - Special Report1
05/05/2015320936699Open ↗