← Back
BuildNYC
Three families
572 MAC DONOUGH STREET
BROOKLYN · BIN 3047311
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R6BZoning
2,430 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · Owner of record: R.B. Macdonough · 1,800 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofExterior guardrail and fall protection systems2p · 1 filing · 7 docs
Floor 2Wall mounted mini split unit installation1p · 1 filing · 3 docs
Floor 1Wall mounted mini split unit installation1p · 1 filing · 3 docs
CellarPlumbing work for gas piping and water heater2p · 1 filing · 18 docs
Site & exteriorWall mounted mini split unit installation1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R.B. Macdonough103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D&E Build Evergreen307/18/2025
Peter Cho Architects108/12/2024
NY Building Associates105/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
Metro Design803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hytech SolarGeneral Contractor307/08/2026
John Farr P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E Build Evergreen I9342407/18/2025
NKM Engineering6244105/02/2024
Building Lifecycle
09/15/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01045259-I1
08/07/2025
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE TO RECONFIGURE GAS PIPING CONNECTED TO EXISTING GAS EQUIPMENT AND REPLACEMENT OF EXISTING ELECTRIC WATER HEATER.
B01084424-I1
08/07/2025
Signed off — Alteration
B01084413-I1
07/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHytech Solar03/28/2025
DOB NOWPlumbingSigned-offJohn Farr P & H10/16/2024
DOB NOWSolarSigned-offHytech Solar08/07/2024
BISMHISSUEDH.P.N. Construction01/29/2018
BISMHISSUEDH.P.N. Construction01/29/2018
BISOTISSUEDTaylormade Contracting02/13/2015
BISPLISSUEDNca Plumbing & Heating12/13/2013
BISPLISSUEDNca Plumbing & Heating09/30/2013
1 project · most recent 05/28/2025
FiledStatusContractorScope
05/28/2025CompleteGMJ Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/25/2025Energy Code Compliance InspectionsDanny Chenprogress
07/25/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
07/25/2025Maintenance informationDanny Chenenergy_progress
07/25/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
07/25/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
07/25/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
07/18/2025Energy Code Compliance InspectionsDanny Chenprogress
07/18/2025Maintenance informationDanny Chenenergy_progress
07/18/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
07/18/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
07/18/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
07/18/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
10/07/2024Fire-Resistant Penetrations and JointsDanny Chenspecial
10/07/2024Energy Code Compliance InspectionsDanny Chenprogress
10/07/2024HVAC-R and service water heating equipmentDanny Chenenergy_progress
10/07/2024Maintenance informationDanny Chenenergy_progress
10/07/2024HVAC-R and service water heating system controlsDanny Chenenergy_progress
10/07/2024HVAC-R and service water piping design and insulationDanny Chenenergy_progress
05/02/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/02/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
05/02/2024FinalNARESH MAHANGUprogress
05/02/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/02/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
91 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account