← Back
Primarily 3 family with 1 store or office
573 2 AVENUE
MANHATTAN · Murray Hill-Kips Bay · BIN 1020050
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
C1-8AZoning
3,692 sfGross Floor Area
4Units
Rent Stabilized10 Open Violations 4 unresolved · 6 paperwork only ▸
Primarily 3 family with 1 store or office · Owner of record: 573 SECOND AVENUE CORP. · 1,624 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 14p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
573 SECOND AVENUE CORP.103/22/2026
OWNER OF LIMERICK RESTAUR103/22/2026
573 2ND AVE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUST CONSULTING ENGINEERING406/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
Building Lifecycle
All (27)Filed (4)Permit Issued (2)Signed Off (2)Violation (14)Inspection (5)
07/27/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH PLUMBING WORK:RELOCATE 2-PCS BATH, INSTALL ONE 2-COMP SINK AND DISHWASHER ON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00633310-I1
07/26/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE OF USE, EGRESS AND CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION.
M00633307-I1
07/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/07/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/03/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH PLUMBING WORK:RELOCATE 2-PCS BATH, INSTALL ONE 2-COMP SINK AND DISHWASHER ON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00633310-P1
06/03/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE OF USE, EGRESS AND CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION.
M00633307-P1
12/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/03/2021
Permit issued — Plumbing
M00633310-I1-PL
11/23/2021
Permit issued — General Construction
M00633307-I1-GC
11/18/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH PLUMBING WORK:RELOCATE 2-PCS BATH, INSTALL ONE 2-COMP SINK AND DISHWASHER ON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00633310-I1
11/18/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE OF USE, EGRESS AND CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION.
M00633307-I1
06/29/2018
Violation issued (HPD, closed)
B
10/24/2016
Violation issued (HPD, closed)
I
04/23/1996
Violation issued (ECB, open)
Construction
02/25/1993
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
02/25/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/1992
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
06/04/1992
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/1990
Violation issued (ECB, open)
Public Assembly
07/11/1990
Violation issued (ECB, closed)
Public Assembly
05/11/1990
Violation issued (ECB, closed)
Public Assembly
04/25/1989
Violation issued (ECB, open)
Public Assembly
03/28/1989
Violation issued (ECB, open)
Construction
03/28/1989
Violation issued (ECB, open)
Public Assembly
10/24/1988
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/03/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC11/23/2021
BISPLISSUEDK & BH PLUMBING & HTG INC04/30/1998
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/24/1998
BISMHISSUEDHSU & ASSOCIATES INC02/27/1998
BISPLISSUEDMAGOR PLUMBING & HEATING11/05/1997
BISFPISSUEDCHIEF FIRE PREVTN.& FILTER SV,IN07/11/1997
BISPLISSUEDMAGOR PLUMBING & HEATING06/17/1997
BISPLISSUEDMAGOR PLUMBING & HEATING06/17/1997
BISPLISSUEDMAINLAND PLG & HTG09/06/1996
BISMHISSUEDRONG YIP09/05/1996
BISFPISSUEDFIRE COMMAND CO.,INC.02/09/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/07/2022Fail-Final General Construction Non-Directive 14FailView ↗
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00633307-P1Request digital key ↗
09/03/2026M00633307-I1Request digital key ↗
09/03/2026M00633310-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M00633307-P1Open ↗
08/13/2026M00633310-I1Open ↗
08/13/2026M00633310-P1Open ↗
Showing 3 of 4 on file for this type