← Back
BuildNYC
Training school
573 EAST 139TH STREET
BRONX · Mott Haven-Port Morris · BIN 2003646
💬 Discuss this project
1974Year Built
1Stories
W4Building Class
R7-1Zoning
—Gross Floor Area
1Units
3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Training school · Owner of record: NYC Educational Construction Fund · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority2603/21/2026
NYC Educational Construction Fund103/22/2026
NYC Department of Education103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RPJ ElectricElectrical203/21/2026
Building Lifecycle
All (28)Violation (28)
06/22/2026
Failure to maintain building in code-compliant manner.noted:storage ofmiscellaneous materials of jantorial boxes of garbage bags,cleaning products…
ECB violation · open
06/22/2026
Failure to maintain building in code-compliant manner.noted:fire ratedclassroom and smoke doors not self closing due to binding,missing and or…
ECB violation · open
06/22/2026
Failure to mantain building in code-compliant manner.illumination for exits,exit discharges and public corridors per bc…
ECB violation · open
02/25/2026
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
08/04/2025
C-13-05: Failed to provide sufficient persons holding a Certificate of Fitness for Place of Assembly Safety Personnel (F-03/F-04), in violation of…
FDNY_ORDER violation · closed
02/01/2025
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
07/11/2023
C-13-05: Failed to provide sufficient persons holding a Certificate of Fitness for Place of Assembly Safety Personnel (F-03/F-04), in violation of…
FDNY_ORDER violation · closed
09/15/2016
Failure to maintain bldg in code compliant manner. Electrical heaters in all classrooms and throughout school inoperable, no heat source for…
ECB violation · closed
08/12/2015
: failed to conduct requir test/inspection vc 20:
FDNY_NOV violation · closed
03/28/2014
Re-issue # 35019364Z. Door not self-closing. Room 7 & roof bulkhead. Remedy: maintain doors as per code.
ECB violation · closed
03/28/2014
Mechanical room- opposite kitchen. Storage of chairs,desk,custodial items,locker & hanging clothing tower for air purification. Remedy: remove all…
ECB violation · closed
05/03/2013
Public corridor/stair partial obstruction. At upper level stair a stairwell landing classroom furniture and misc. Items arranged/stored partially…
ECB violation · closed
05/03/2013
Door not closing. At upper level room 7 missing door check. Remedy: repair/replace door noted.
ECB violation · closed
04/06/2012
: failed to provide sign/posting/instruct vc 6:
FDNY_NOV violation · closed
02/25/2010
Foundation wall has become porous and allowing water to enter building in rm 4 reading recovery rm remedy:waterproof foundation walls
ECB violation · closed
02/25/2010
Roof above rm 6 has become porous and allowing rain water to leak from ceiling below remedy:repair leaky roof
ECB violation · closed
04/26/2006
Interior plaster is spalling from the ceiling and wall located in ROOM205 next to the window on the second floor. Remedy: plaster ceiling and wall.
ECB violation · closed
02/11/2003
Failure to maintain: defect door frames rotted & pitted no longer attached solidcy to building location: west side exit doors. Remedy; make all…
ECB violation · closed
02/01/2001
Failure to maintain:defect is:inoperative,defective and keep in shut position windows,approx 70% of windows.remedy:repair or replace windows.
ECB violation · closed
02/01/2001
Exit doors; not self-closing defective exit doors at the main entrance.remedy:repair or replace doors.
ECB violation · closed
02/01/2001
Failure to maintain defects are:1.interior plaster wall spoiling,deteriorating falling apart room #104,106,107.2.water penetration at ceiling at…
ECB violation · closed
02/01/2001
Failure to maintain:defects are:broken damaged kitchen tiles.remedy;maintain building, make all necessary repairs.
ECB violation · closed
02/01/2001
Failure to maintain:defects are:water penetration at ceiling room #208REMEDY:maintain building/make repairs.
ECB violation · closed
04/15/1999
Failure to maintain exterior. Defects are: 1) iron gates are loose anddefective also separating from brickwork. Welds on iron fence are broken.…
ECB violation · closed
10/12/1988
Vc 5: failed to produce permit and/or record vc 12: fail to maintain spk/std/alarm/supp sys.
FDNY_NOV violation · closed
06/07/1988
Vc 5: failed to produce permit and/or record vc 6: failed to provide sign/posting/instruct vc 12: fail to maintain spk/std/alarm/supp sys.
FDNY_NOV violation · closed
06/07/1988
Vc 20: failed to conduct requir test/inspection vc 12: fail to maintain spk/std/alarm/supp sys.
FDNY_NOV violation · closed
02/18/1987
Vc 20: failed to conduct requir test/inspection
FDNY_NOV violation · closed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Varsity Plumbing and Heating—
BIS—Positive Electric Associates—
BIS—Positive Electric Associates—
BIS—Varsity Plumbing and Heating—
BIS—Positive Electric Associates—
BIS—Positive Electric Associates—
BIS—Positive Electric Associates—
BIS—Positive Electric Associates—
BIS—Varsity Plumbing and Heating—
BIS—Stanco Systems Electrical—
BIS—Stanco Systems Electrical—
BIS—Par Plumbing Co—
BIS—Skyworx Contracting—
BIS—Positive Electric Associates—
BIS—Positive Electric Associates—
BIS—Skyworx Contracting—
BIS—Positive Electric Associates—
BIS—Par Plumbing Co—
BIS—Positive Electric Associates—
BIS—Positive Electric Associates—
BIS—Par Plumbing Co—
BIS—Positive Electric Associates—
BIS—Axiom Plumbing & Heating—
BIS—Positive Electrical Associates—
BIS—Positive Electrical Associates—
BIS—Postive Electrical Associates—
BIS—Positive Electrical Associates—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 9 on file (BIS + DOB NOW)
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
04/08/2013220223942Open ↗
09/05/2012220223942Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/05/2012220223942Open ↗
▸Seals & Professional Certifications3
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/05/2012220223942Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/05/2012220223942Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/05/2012220223942Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
09/05/2012220223942Open ↗
▸BISSHED LETTER1
04/08/2013220223942Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/05/2012220223942Open ↗