← Back
Two family brick
574 ALABAMA AVENUE
BROOKLYN · BIN 3085444
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
2,480 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family brick · 2,433 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC108/27/2025
ENTHINK ENGINEERS LLC105/11/2022
AP PROFESSIONAL ENGINEERING PLLC103/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC LIBERTY CONSTRUCTIONGeneral Contractor303/21/2026
EMPIRE CITY CONSTRUCTIONGeneral Contractor203/21/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
SOLAR CONTRACTING LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854108/27/2025
AP PROFESSIONAL ENGINEERI5974103/10/2022
Building Lifecycle
All (27)Filed (3)Permit Issued (3)Signed Off (2)Violation (2)Objection (14)Special Inspection (3)
04/29/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01276784-I1
12/11/2025
Permit issued — Solar
B01276784-I1-SL
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Cost
09/15/2025
Objection raised — Electrical
09/15/2025
Objection raised — Admin
09/15/2025
Objection raised — Admin
08/27/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01276784-I1
08/17/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00734938-I1
05/13/2022
Permit issued — Sidewalk Shed
B00734938-I1-SH
05/11/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00734938-I1
05/10/2022
Special inspection requirement — Final
Sunil Saigal
04/25/2022
Permit issued — General Construction
B00690045-I1-GC
03/29/2022
Special inspection requirement — Masonry
GURVINDER SINGH
03/18/2022
Objection raised — Scope
03/18/2022
Objection resolved — Addressed
03/18/2022
Objection raised — Other
03/18/2022
Objection resolved — Addressed
03/18/2022
Objection raised — Inspections
03/18/2022
Objection resolved — Addressed
03/10/2022
Filed — Alteration
FACADE REPAIR WHICH INCLUDES PARAPETWALL REPLACEMENT AND BRICK REPLACEMENTAS PER PLANS. NO CHANGE IN BUILDING USE,OCCUPANCY OR EGRESS.
B00690045-I1
03/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GURVINDER SINGH
09/27/2002
Violation issued (HPD, open)
B
09/04/2002
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC12/11/2025
DOB NOWSidewalk ShedSigned-offEMPIRE CITY CONSTRUCTION05/13/2022
DOB NOWGeneral ConstructionPermit IssuedNYC LIBERTY CONSTRUCTION04/25/2022
2 projects · most recent 03/20/2026
FiledStatusContractorScope
03/20/2026CompleteVILLAGE ELECTL CONTRS INC—
05/11/2022CompleteRICHARD NEU—
1 project · most recent 08/27/2025
FiledStatusContractorScope
08/27/2025Signed-offSOLAR CONTRACTING LLC46 panels, 19.78 kw, 483.44 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/10/2022FinalSunil Saigalprogress
03/29/2022MasonryGURVINDER SINGHspecial
03/01/2022Structural Stability – Alterations of existing buildingsGURVINDER SINGHspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00734938-I1Request digital key ↗
08/20/2026B01276784-I1Request digital key ↗
08/15/2026B00690045-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01276784-I1Open ↗
08/13/2026B00690045-I1Open ↗
08/13/2026B00734938-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00690045-I1Open ↗
09/01/2026B00690045-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B00734938-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01276784-I1Open ↗
08/13/2026B00690045-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWUtility Company Final Acceptance Letter2
08/20/2026B01276784-I1Open ↗
08/13/2026B01276784-I1Open ↗