Three families
574 CARROLL STREET
BROOKLYN · BIN 3020388
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
2,080 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,217 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
StructuralFire Protection
Roof2p · 2 filings · 20 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP404/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2024$3.0M—Private party → Private party$1,418/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOV HADAS, ARCHITECT PC308/01/2025
PRUDIGM ENGINEERING LLC206/25/2025
ASHRAF CORP104/22/2025
JOSEPH K. BLUM CO. LLP103/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRAMEWORK CONSULTANTS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOWMAN CONSTRUCTION CORPGeneral Contractor403/21/2026
LUNA NYC ELECTRIC CORPElectrical303/22/2026
A & B CONTRACTING SVCS INGeneral Contractor203/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PARK CONTRACTING GROUPGeneral Contractor104/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH K. BLUM CO. LLP1741308/01/2025
PRUDIGM ENGINEERING LLCU4304306/25/2025
Building Lifecycle
All (54)Filed (7)Permit Issued (6)Signed Off (5)Violation (9)Inspection (3)Objection (16)Special Inspection (8)
05/04/2026
Violation issued (HPD, closed)
A
09/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01211978-I1
09/11/2025
Signed off — Alteration
PROPOSING TO RESTORE FIRE ESCAPE THAT WAS REMOVED UNDER APPLICATION # 320211551 AS PER PLANS FILED
B01160555-I1
08/17/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Scope
08/05/2025
Signed off — Alteration
DEMOLISH EXISTING DETERIORATED FACADE & REMOVE EXISTING DETERIORATED FIRE ESCAPE.REPLACE THE WINDOWS, WEATHER-PROOFING, AND INSTALL A NEW FACADE. REPLACE THE DETERIORATED BASEMENT VAULT DOORS. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS
B01064788-I1
08/01/2025
Filed — Alteration
PROPOSING TO RESTORE FIRE ESCAPE THAT WAS REMOVED UNDER APPLICATION # 320211551 AS PER PLANS FILED
B01160555-P1
07/17/2025
Signed off — Alteration
INSTALL NEW SPRINKLER CHECK-VALVE TO WATER MAIN, CONNECT TO EXISTING SPRINKLER PIPING IN COMMON AREAS.
B01067073-I1
06/25/2025
Filed — Alteration
INSTALL NEW SPRINKLER CHECK-VALVE TO WATER MAIN, CONNECT TO EXISTING SPRINKLER PIPING IN COMMON AREAS.
B01067073-P1
06/25/2025
Special inspection requirement — Final
DOV HADAS
06/11/2025
Signed off — Alteration
PROPOSING TO RESTORE FIRE ESCAPE THAT WAS REMOVED UNDER APPLICATION # 320211551 AS PER PLANS FILED
B01160555-S1
06/09/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (ECB, closed)
Construction
04/24/2025
Permit issued — Structural
B01160555-S1-ST
04/23/2025
Permit issued — Sidewalk Shed
B01211978-I1-SH
04/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01211978-I1
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
04/01/2025
Objection raised — Fire_Protection
04/01/2025
Objection raised — Admin
04/01/2025
Objection raised — Admin
03/28/2025
Filed — Alteration
PROPOSING TO RESTORE FIRE ESCAPE THAT WAS REMOVED UNDER APPLICATION # 320211551 AS PER PLANS FILED
B01160555-S1
03/17/2025
Special inspection requirement — Sprinkler Systems
Naeem Anwar
03/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
Naeem Anwar
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
03/10/2025
Permit issued — General Construction
B01160555-I1-GC
03/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DEGRAAFF
03/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DEGRAAFF
01/10/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
12/31/2024
Filed — Alteration
PROPOSING TO RESTORE FIRE ESCAPE THAT WAS REMOVED UNDER APPLICATION # 320211551 AS PER PLANS FILED
B01160555-I1
12/31/2024
Objection raised — Scope
12/31/2024
Objection raised — Scope
12/31/2024
Objection raised — Scope
12/31/2024
Objection raised — Scope
12/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2024
Violation issued (ECB, closed)
Construction
11/26/2024
Violation issued (HPD, closed)
I
10/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/11/2024
Permit issued — Plumbing
B01067073-I1-PL
07/03/2024
Permit issued — Sprinklers
B01067073-I1-EW-SP
07/02/2024
Permit issued — General Construction
B01064788-I1-GC
06/17/2024
Filed — Alteration
DEMOLISH EXISTING DETERIORATED FACADE & REMOVE EXISTING DETERIORATED FIRE ESCAPE.REPLACE THE WINDOWS, WEATHER-PROOFING, AND INSTALL A NEW FACADE. REPLACE THE DETERIORATED BASEMENT VAULT DOORS. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS
B01064788-I1
06/17/2024
Filed — Alteration
INSTALL NEW SPRINKLER CHECK-VALVE TO WATER MAIN, CONNECT TO EXISTING SPRINKLER PIPING IN COMMON AREAS.
B01067073-I1
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
06/11/2024
Special inspection requirement — Final
Naeem Anwar
04/09/2024
Violation issued (HPD, closed)
A
03/21/2023
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBOWMAN CONSTRUCTION04/24/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP04/23/2025
DOB NOWGeneral ConstructionSigned-offBOWMAN CONSTRUCTION03/10/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/11/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/03/2024
DOB NOWGeneral ConstructionSigned-offA B CONTRACTING SVCS IN07/02/2024
BISPLISSUEDPRIME PIPING & HEATING IN08/27/2025
BISOTISSUEDA & B CONTRACTING SVCS IN07/02/2024
BISOTISSUEDLAMAK'S CONSTRUCTION CORP09/01/2010
BISOTISSUEDWM DORVILLIER & CO INC03/04/2009
BISPLISSUEDAMANICK PL & HTG CORP10/08/2008
BISOTISSUEDWILLIAM DORVILLIER DBA CGI08/13/2008
BISOTISSUEDBAN DO CONSTRUCTION03/08/2005
BISEQISSUEDBAN DO CONSTRUCTION03/08/2005
BISPLISSUEDAVON PLBG & HTG INC12/28/2004
BISEQISSUEDBAN DO CONSTRUCTION12/16/2004
BISMHISSUEDBAN DO CONSTRUCTION12/16/2004
2 projects · most recent 04/22/2025
General Wiring
FiledStatusContractorScope
04/22/2025CompleteRICHARD NEU—
10/16/2024CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/25/2025FinalDOV HADASprogress
03/17/2025Sprinkler SystemsNaeem Anwarspecial
03/17/2025Tenant Protection Plan ComplianceNaeem Anwarspecial
03/17/2025Fire-Resistant Penetrations and JointsNaeem Anwarspecial
03/10/2025Structural Stability – Alterations of existing buildingsWILLIAM DEGRAAFFspecial
03/10/2025Tenant Protection Plan ComplianceWILLIAM DEGRAAFFspecial
06/14/2024Fire-Resistant Penetrations and JointsNaeem Anwarspecial
06/11/2024FinalNaeem Anwarprogress
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B01064788-I1Request digital key ↗
08/24/2026B01067073-P1Request digital key ↗
08/24/2026B01067073-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION16
02/27/2026310175850Open ↗
02/17/2026310175850Open ↗
01/30/2026310175850Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION8
10/24/2024310175850Open ↗
07/03/2024310175850Open ↗
10/25/2010320211551Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B01067073-P1Open ↗
08/24/2026B01067073-I1Open ↗
08/23/2026B01160555-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
11/19/2025310175850Open ↗
06/11/2024310175850Open ↗
09/14/2010310175850Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026B01067073-P1Open ↗
08/29/2026B01067073-P1Open ↗
08/29/2026B01067073-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/02/2010320211551Open ↗
08/07/2008310175850Open ↗
08/31/2010320211551Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/30/2010320181049Open ↗
08/07/2008310175850Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01064788-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING4
11/19/2025310175850Open ↗
06/11/2024310175850Open ↗
08/31/2010320211551Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
11/21/2024310175850Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B01067073-I1Open ↗
08/24/2026B01067073-P1Open ↗
08/23/2026B01160555-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/07/2008310175850Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
08/31/2010320211551Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/30/2010320181049Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/19/2025310175850Open ↗
11/19/2025310175850Open ↗
06/11/2024310175850Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS3
08/31/2010320211551Open ↗
06/30/2010320181049Open ↗
08/07/2008310175850Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/11/2024310175850Open ↗
08/31/2010320211551Open ↗
08/07/2008310175850Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
02/27/2026310175850Open ↗
12/05/2025310175850Open ↗
07/10/2024310175850Open ↗
▸BISEFILING COVER SHEET2
06/30/2010320181049Open ↗
08/07/2008310175850Open ↗
▸BISeFiling Job Application Cover Sheet1
08/31/2010320211551Open ↗