← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Livonia Commons Condominium
574 LIVONIA AVENUE · BIN 3418179
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R7AZoning
87,840 sfGross Floor Area
91Units
Rent Stabilized66 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 20,644 sf lot · 4.25 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 14 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Peter Rosen, PE410/03/2021
SBLM Architects101/14/2021
Basic Group102/08/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting Company1003/21/2026
Basic Groups203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L M Builders GroupGeneral Contractor803/21/2026
RO-Sal Plumbing & Heatingspecialty_contractor503/21/2026
Dhi Construction Servicesspecialty_contractor403/21/2026
Dhi Construction ServicesGeneral Contractor307/08/2026
Copper PlumbingPlumbing107/08/2026
R.G.M. SignsSign hanger107/08/2026
Ariana ContractingFire Protection107/08/2026
4Matic ConstructionGeneral Contractor212/17/2014
Avante ContractingGeneral Contractor205/19/2016
J. Caiazzo Plumbing & HeatingFire Protection107/24/2017
J. Caiazzo Plumbing & HeatingPlumbing107/24/2017
JPR Builders 07General Contractor207/21/2017
Katan P & HPlumbing105/27/2016
Katan Plumbing & HeatingFire Protection105/27/2016
Rockledge ScaffoldGeneral Contractor408/03/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Richmond Testing Lab263305/20/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
06/10/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR SLOPING IN THE FOYER LOCATED AT APT 5A, 5th STORY,…
HPD violation · closed
06/10/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st…
HPD violation · open
06/10/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5A,…
HPD violation · open
06/10/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND PERIMETER OF BATHTUB IN THE BATHROOM LOCATED AT…
HPD violation · open
159 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
324 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account