ECB07/16/2026FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE. AT TIME OF INSPECTION, REPOINTING IS REQUIRED FOR BRICK MASONRY ABOVE THE 2ND-STORY WINDOW AT EXPOSURE 1. ADDITIONALLY, A VERTICAL CRACK REQUIRING BRICK REPAIR AND
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
Factory, light manufacturing · 3.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.