← Back
Elevator apt, semi-fireproof without stores
575 3 STREET
BROOKLYN · BIN 3025343
💬 Discuss this project
1920Year Built
6Stories
D1Building Class
R7BZoning
32,388 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 575 THIRD REALTY LLC · 9,298 sf lot · 3.48 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar3p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
575 THIRD REALTY LLC503/22/2026
575 3RD STREET, LLC203/22/2026
PARKVIEW ASSOCIATES403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2022$20.0M—575 3RD STREET, LLC → 575 THIRD REALTY LLC$618/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY208/19/2024
BAZINI ENGINEERING, P.C.307/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
RVM PLUMBING CORPPlumbing207/08/2026
ASKO ELEC CONST & MAIN INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116208/19/2024
BAZINI ENGINEERING, P.C.1808307/17/2023
Building Lifecycle
All (81)Filed (5)Permit Issued (4)Signed Off (4)Violation (50)Inspection (4)Special Inspection (14)
11/21/2025
Violation issued (ECB, open)
Construction
02/21/2025
Violation issued (HPD, closed)
C
09/11/2024
Signed off — Alteration
REPLACE BOILER AND GAS/OIL BURNER WITH BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00899101-I1
09/11/2024
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00899119-I1
09/11/2024
Signed off — Alteration
B00899115-I1
08/21/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00987084-I1
08/20/2024
Special inspection requirement — Final
James Clancy
08/20/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
08/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
08/19/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00987084-P1
08/07/2024
Special inspection requirement — Final
James Clancy
08/07/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
04/18/2024
Permit issued — Solar
B00987084-I1-SL
04/14/2024
Violation issued (ECB, closed)
Construction
03/28/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/14/2024
Violation issued (HPD, closed)
B
03/14/2024
Violation issued (HPD, closed)
B
03/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/18/2024
Violation issued (HPD, closed)
B
02/18/2024
Violation issued (HPD, closed)
B
02/18/2024
Violation issued (HPD, closed)
B
02/18/2024
Violation issued (HPD, closed)
C
01/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00987084-I1
12/28/2023
Violation issued (ECB, open)
Construction
12/22/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/21/2023
Permit issued — Plumbing
B00899119-I1-PL
07/21/2023
Permit issued — Boiler Equipment
B00899115-I1-BE
07/21/2023
Permit issued — Boiler Equipment
B00899101-I1-BE
07/17/2023
Filed — Alteration
REPLACE BOILER AND GAS/OIL BURNER WITH BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00899101-I1
07/17/2023
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00899119-I1
07/17/2023
Filed — Alteration
B00899115-I1
07/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
07/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/01/2023
Violation issued (ECB, open)
Elevators
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2021
Violation issued (HPD, closed)
A
12/21/2021
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2021
Violation issued (ECB, closed)
Elevators
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (HPD, closed)
I
01/11/2018
Violation issued (HPD, closed)
I
11/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/11/2017
Violation issued (HPD, closed)
C
07/11/2017
Violation issued (HPD, closed)
A
07/11/2017
Violation issued (HPD, closed)
A
07/11/2017
Violation issued (HPD, closed)
A
07/11/2017
Violation issued (HPD, closed)
A
07/11/2017
Violation issued (HPD, closed)
A
07/11/2017
Violation issued (HPD, closed)
A
07/11/2017
Violation issued (HPD, closed)
C
07/11/2017
Violation issued (HPD, closed)
C
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL04/18/2024
DOB NOWPlumbingSigned-offRVM PLUMBING CORP07/21/2023
DOB NOWBoiler EquipmentSigned-offRB HTG CONSULTING GROUP07/21/2023
DOB NOWBoiler EquipmentSigned-offRVM PLUMBING CORP07/21/2023
5 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedDENALI ELECTRIC CORPGeneral Wiring
01/07/2024CompleteBERTRAM ELECTRIC CONTNG—
07/26/2023Permit IssuedABILENE ELECTRIC INC—
12/06/2022Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
11/21/2022Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/28/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/20/2024FinalJames Clancyprogress
08/20/2024Air barrier - visual inspectionJames Clancyenergy_progress
08/20/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/20/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/20/2024Energy Code Compliance InspectionsJames Clancyprogress
08/07/2024FinalJames Clancyprogress
08/07/2024Air barrier - visual inspectionJames Clancyenergy_progress
08/07/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/07/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/07/2024Energy Code Compliance InspectionsJames Clancyprogress
07/17/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/03/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
07/03/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
07/03/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00899101-I1Request digital key ↗
08/27/2026B00899119-I1Request digital key ↗
08/27/2026B00899115-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B00899101-I1Open ↗
09/01/2026B00987084-P1Open ↗
09/01/2026B00987084-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00899101-I1Open ↗
08/27/2026B00899119-I1Open ↗
08/27/2026B00899115-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00899115-I1Open ↗
09/23/2026B00899101-I1Open ↗
09/01/2026B00987084-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00899101-I1Open ↗
08/27/2026B00899119-I1Open ↗
08/27/2026B00899115-I1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00987084-I1Open ↗