Two family frame
575 BARBEY STREET
BROOKLYN · BIN 3090042
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R5Zoning
2,892 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,000 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 23p · 2 filings · 20 docs
Floor 1
Cellar4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING ENGINEERING SYSTEMS PLLC407/10/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETERKIN CONSTRUCTION LLCGeneral Contractor603/21/2026
CJ HEATING & MECHANICAL CPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC4288407/10/2024
Building Lifecycle
All (31)Filed (4)Permit Issued (4)Violation (2)Inspection (4)Special Inspection (17)
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2024
Permit issued — Plumbing
B00975827-I1-PL
07/13/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SEBERT DYER
07/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
07/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBERT DYER
07/13/2024
Special inspection requirement — Mechanical Systems
SEBERT DYER
07/13/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
07/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
07/13/2024
Special inspection requirement — Final
SEBERT DYER
07/13/2024
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
07/13/2024
Special inspection requirement — Insulation placement and R values
SEBERT DYER
07/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBERT DYER
07/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
07/13/2024
Special inspection requirement — Interior lighting power
SEBERT DYER
07/13/2024
Special inspection requirement — Fenestration air leakage
SEBERT DYER
07/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/13/2024
Special inspection requirement — Fenestration areas
SEBERT DYER
07/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/13/2024
Special inspection requirement — Maintenance information
SEBERT DYER
07/10/2024
Filed — Alteration
APPLICATION BEING FILED TO REMOVE 4 FIXTURES, TO RELOCATE 2 FIXTURES AND TO INSTALL 14 NEW FIXTURES.
B00975827-P1
07/10/2024
Filed — Alteration
APPLICATION BEING FILED TO BUILD A NEW BATHROOM, LAUNDRY ROOM, UTILITY CLOSET AND CELLAR ENTRANCE AT CELLAR FLOOR, AND TO BUILD A NEW BATHROOM AT 1ST FLOOR AND A NEW BATHROOM AND CLOSET AT 2ND FLOOR, AND TO INSTALL MECHANICAL EQUIP. AT OSP, 1ST & 2ND FLR
B00975789-P1
07/05/2024
Permit issued — Mechanical Systems
B00975789-I1-GC-CX
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/22/2024
Permit issued — Plumbing
B00975827-I1-PL
12/19/2023
Permit issued — General Construction
B00975789-I1-GC-CX
12/18/2023
Filed — Alteration
APPLICATION BEING FILED TO REMOVE 4 FIXTURES, TO RELOCATE 2 FIXTURES AND TO INSTALL 14 NEW FIXTURES.
B00975827-I1
12/13/2023
Filed — Alteration
APPLICATION BEING FILED TO BUILD A NEW BATHROOM, LAUNDRY ROOM, UTILITY CLOSET AND CELLAR ENTRANCE AT CELLAR FLOOR, AND TO BUILD A NEW BATHROOM AT 1ST FLOOR AND A NEW BATHROOM AND CLOSET AT 2ND FLOOR, AND TO INSTALL MECHANICAL EQUIP. AT OSP, 1ST & 2ND FLR
B00975789-I1
10/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C10/21/2024
DOB NOWMechanical SystemsPermit IssuedPETERKIN CONSTRUCTION LLC07/05/2024
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C01/22/2024
DOB NOWGeneral ConstructionPermit IssuedPETERKIN CONSTRUCTION LLC12/19/2023
BISOTISSUEDCENTURION SOLAR ENERGY12/01/2023
BISOTISSUEDSTATEWIDE CONNECT INC09/30/2021
BISOTISSUEDSTATEWIDE CONNECT INC10/20/2020
1 project · most recent 07/10/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2024Permit IssuedPETERKIN CONSTRUCTION LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ 36,000 BTU · Condensing Unit ×4
MXZ-3C24NAHZ3 24,000 BTU · Condensing Unit ×2
Ventilation
Daikin VAM300GYJU 300 CFM · Erv ×4
1 project · most recent 07/10/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/10/2024Permit IssuedJL PLUMBING, LLCGas, Storm, Water/Sanitary
2 projects · most recent 11/29/2023
General Wiring
FiledStatusContractorScope
11/29/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
10/26/2023CompleteBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/13/2024Exhaust and Vent Systems in Plenums and DuctsSEBERT DYERspecial
07/13/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
07/13/2024Structural Stability – Alterations of existing buildingsSEBERT DYERspecial
07/13/2024Mechanical SystemsSEBERT DYERspecial
07/13/2024Energy Code Compliance InspectionsSEBERT DYERprogress
07/13/2024Fire-Resistance Rated ConstructionSEBERT DYERprogress
07/13/2024FinalSEBERT DYERprogress
07/13/2024Air barrier - visual inspectionSEBERT DYERenergy_progress
07/13/2024Insulation placement and R valuesSEBERT DYERenergy_progress
07/13/2024Fenestration and door U-factor and product ratingsSEBERT DYERenergy_progress
07/13/2024HVAC-R and service water heating equipment—energy_progress
07/13/2024Interior lighting powerSEBERT DYERenergy_progress
07/13/2024Fenestration air leakageSEBERT DYERenergy_progress
07/13/2024HVAC-R and service water piping design and insulation—energy_progress
07/13/2024Fenestration areasSEBERT DYERenergy_progress
07/13/2024HVAC-R and service water heating system controls—energy_progress
07/13/2024Maintenance informationSEBERT DYERenergy_progress
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B00975789-I1Request digital key ↗
08/24/2026B00975789-P1Request digital key ↗
08/24/2026B00975827-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
12/01/2023340902679Open ↗
11/02/2020340751332Open ↗
10/29/2020340751332Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
10/18/2023340902679Open ↗
08/18/2020340751332Open ↗
08/04/2020340751332Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00975827-I1Open ↗
08/13/2026B00975827-P1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
08/23/2026B00975789-I1Open ↗
08/23/2026B00975789-I1Open ↗
08/23/2026B00975789-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B00975789-I1Open ↗
08/24/2026B00975827-P1Open ↗
08/24/2026B00975827-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026B00975789-I1Open ↗
08/23/2026B00975789-I1Open ↗
08/23/2026B00975789-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/18/2023340902679Open ↗
08/04/2020340751332Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/02/2020340751332Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN1
10/18/2023340902679Open ↗
▸BISTenant Protection Plan and Notes1
08/27/2020340751332Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B00975789-I1Open ↗
08/24/2026B00975827-P1Open ↗
08/24/2026B00975827-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/18/2023340902679Open ↗
08/20/2020340751332Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/01/2025340902679Open ↗
10/18/2023340902679Open ↗
09/02/2020340751332Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/31/2022340751332Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/31/2022340751332Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/02/2020340751332Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/01/2025340902679Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/18/2023340902679Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
04/01/2025340902679Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/01/2025340902679Open ↗
04/01/2025340902679Open ↗
10/18/2023340902679Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL INSPECTION1
04/01/2022340751332Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/31/2022340751332Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/02/2025340902679Open ↗
04/01/2022340751332Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
04/01/2025340902679Open ↗
10/18/2023340902679Open ↗
08/20/2020340751332Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/31/2022340751332Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
10/18/2023340902679Open ↗
08/04/2020340751332Open ↗
▸BISADDITIONAL INFORMATION1
11/30/2023340902679Open ↗
▸Other Documents2
▸BISTax Abatement Miscellaneous1
04/02/2025340902679Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/18/2023340902679Open ↗