RoofUnder Construction24p · 7 filings · 20 docs
ArchitectureElectricalGeneralMechanicalStructuralSC
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PLYWOOD ENCLOSURE INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents · 1 drawing sheet
WCM 2 & 3: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 2 drawing sheets
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 3447p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications to take place on the 34th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Plumbing modifications to take place on the 34th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Sprinkler modifications to take place on the 34th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 33
Floor 32
Floor 31
Floor 3014p · 6 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Sprinkler Modifications taking place on the 30th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Plumbing modifications to take place on the 30th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 2 drawing sheets
Mechanical modifications to take place on the 30th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 29
Floor 28
Floor 27Under Construction44p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing modifications to take place on the 27th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 3 drawing sheets
Sprinkler modifications to take place on the 27th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Mechanical modifications to take place on the 27th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 2630p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications to take place on the 26th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Plumbing modifications to take place on the 26th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 3 drawing sheets
General Construction modifications taking place on the 26th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 25
Floor 24
Floor 23
Floor 2216p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
3 documents · 4 drawing sheets
Floor 2142p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
10 documents
New MER Space and associated engineering. No change in use, egress or occupancy.
On file for this project
10 documents · 6 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 20Under Construction6p · 3 filings · 14 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
5 documents
Sprinkler modifications taking place on 20th Marketing Floor as per drawings filed herewith. No change in, use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Mechanical modifications to take place on the 20th Marketing Floor (Listed as 19th Construction floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 19Under Construction9p · 3 filings · 16 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
5 documents
Sprinkler modifications taking place on the 19th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Mechanical modifications to take place on the 19th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 1172p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE WCM ADMINISTRATION CONSOLIDATION RENOVATION IN THE EXISTING BUILDING.
On file for this project
10 documents · 3 drawing sheets
MODIFICATION TO HVAC DUCT WORK, PIPING, AND EQUIPMENT TO ACCOMMODATE THE WCM ADMINISTRATION CONSOLIDATION RENOVATION IN THE EXISTING BUILDING.
On file for this project
11 documents · 3 drawing sheets
MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE WCM ADMINISTRATION CONSOLIDATION RENOVATION IN THE EXISTING BUILDING.
On file for this project
16 documents · 9 drawing sheets
Floor 10
Floor 935p · 1 filing · 16 docs
Architecture
Issued Permit Scope
General Construction
MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE WCM ADMINISTRATION CONSOLIDATION RENOVATION IN THE EXISTING BUILDING.
On file for this project
16 documents · 1 drawing sheet
Floor 818p · 3 filings · 19 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Sprinkler temp loop to be installed on 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Sprinkler temp loop to be installed on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Mechanical modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 3 drawing sheets
Floor 711p · 3 filings · 13 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Plumbing modifications to take place on the 7th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Mechanical modifications to take place on the 7th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Sprinkler modifications to take place on 7th floor as per drawings filed herewith. No change in use,egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 675p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
WCM INTERIOR DEMO 3 & 5: PLUMBING AND SPRINKLER REMOVALS TO ACCOMMODATE THE INTERIOR DEMO IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE WCM ADMINISTRATION CONSOLIDATION RENOVATION IN THE EXISTING BUILDING.
On file for this project
10 documents · 5 drawing sheets
MODIFICATION TO HVAC DUCT WORK, PIPING, AND EQUIPMENT TO ACCOMMODATE THE WCM ADMINISTRATION CONSOLIDATION RENOVATION IN THE EXISTING BUILDING.
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 5Under Construction13p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Structural
INSTALLATION OF TEMPORARY PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents
WMC INTERIOR 5th Floor: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 4Under Construction13p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers
WCM INTERIOR 4 PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 4 drawing sheets
WMC INTERIOR 4th Floor: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
INSTALLATION OF TEMPORARY PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents
Latest 3 of 11 filings on this floor.
Floor 3Under Construction272p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Structural
WCM INTERIOR 2 & 3: PLUMBING, SPRINKLER, STANDPIPE MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
26 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents
WCM 2 & 3: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents
Latest 3 of 11 filings on this floor.
Floor 2Under Construction290p · 16 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Structural
WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building.
On file for this project
6 documents
WCM INTERIOR 2 & 3: PLUMBING, SPRINKLER, STANDPIPE MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
26 documents · 9 drawing sheets
INSTALLATION OF TEMPORARY PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 16 filings on this floor.
Floor 1Under Construction196p · 20 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sign · Sprinklers · Standpipe · Structural
WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building.
On file for this project
6 documents · 3 drawing sheets
WCM INTERIOR 2 & 3: PLUMBING, SPRINKLER, STANDPIPE MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
26 documents
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
4 documents
Latest 3 of 20 filings on this floor.
CellarUnder Construction164p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building.
On file for this project
6 documents · 4 drawing sheets
WCM Lobby, Cellar; Interior partitions and finishes to accommodate the Primary Care Renovation in the existing building.
On file for this project
11 documents · 20 drawing sheets
WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building.
On file for this project
7 documents · 15 drawing sheets
Latest 3 of 10 filings on this floor.
Sub-CellarUnder Construction18p · 2 filings · 13 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building.
On file for this project
6 documents
WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building.
On file for this project
7 documents · 1 drawing sheet
Site & exteriorUnder Construction51p · 8 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Antenna · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
WCM Facade: Facade, window, storefront alterations to accommodate the facade renovations at the existing Primary Care Facility.
On file for this project
15 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PLYWOOD ENCLOSURE INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents · 12 drawing sheets
INSTALLATION OF A TEMPORARY SYSTEM SCAFFOLD SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
8 documents · 12 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issued5p · 1 filing · 4 docs
Plumbing
Plumbing modifications to take place om the 8th floor as per drawings. No change in use, egress, or occupancy.
On file for this project
4 documents · 5 drawing sheets