← Back
Primarily 2 family with 1 store or office
575 SENECA AVENUE
QUEENS · BIN 4082106
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R6BZoning
3,250 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸
Primarily 2 family with 1 store or office · 2,253 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingOther
Roof3p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KSTM EXPEDIRING SERVICES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE DESIGN, PLLC1104/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DKG DESIGN SPACE PLANNING1003/21/2026
KSTM EXPEDIRING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GARDEN STATE OF NJ DATA*General Contractor903/21/2026
DONE RIGHT KITCHEN EXHAUSGeneral Contractor303/21/2026
DOUG'S PLBG & HTG SERV COPlumbing207/08/2026
CONTROL SPEC ELECL SYSTEMElectrical103/22/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191104/06/2025
Building Lifecycle
All (86)Filed (11)Permit Issued (7)Signed Off (4)Violation (12)Inspection (6)Objection (16)Special Inspection (30)
05/07/2026
Violation issued (HPD, closed)
A
01/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2025
Signed off — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-S2
06/20/2025
Signed off — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-I1
06/12/2025
Violation issued (HPD, closed)
A
05/09/2025
Permit issued — Mechanical Systems
Q01071571-S2-MS
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/18/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/18/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-S2
04/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-P2
04/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-P1
04/05/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/05/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2024
Permit issued — Plumbing
Q01071571-S1-PL
08/07/2024
Permit issued — General Construction
Q01071571-I1-GC
07/23/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/18/2024
Objection raised — Other
07/18/2024
Objection raised — Scope
07/18/2024
Objection raised — Fire_Protection
07/05/2024
Filed — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-I1
07/05/2024
Filed — Alteration
PROPOSED INSTALLATION OF A SPLIT SYSTEM AC UNITS WITHIN AN EXISTING RESIDENTIAL APARTMENT 2R ON 2ND FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01071571-S1
04/16/2024
Violation issued (HPD, closed)
A
11/27/2023
Violation issued (HPD, closed)
I
03/29/2023
Violation issued (HPD, closed)
A
11/18/2022
Signed off — Alteration
PROPOSED INSTALLATION OF NEW COMMERCIAL PLUMBING FIXTURES ON FIRST & CELLAR FLOOR WITH ASSOCIATED PIPING & RELOCATION OF PLUMBING FIXTURES ON 2ND FLOOR RESIDENTIAL APARTMENT ALL AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, OCCUPANCY, OR EGRESS
Q00415256-I1
11/14/2022
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
11/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
11/08/2022
Filed — Alteration
PROPOSED INSTALLATION OF NEW COMMERCIAL PLUMBING FIXTURES ON FIRST & CELLAR FLOOR WITH ASSOCIATED PIPING & RELOCATION OF PLUMBING FIXTURES ON 2ND FLOOR RESIDENTIAL APARTMENT ALL AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, OCCUPANCY, OR EGRESS
Q00415256-P4
11/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
11/08/2022
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
11/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/09/2022
Signed off — Alteration
PROPOSED INTERIOR AND PARTIAL EXTERIOR RENOVATION OF THE COMMERCIAL FIRST FLOOR, CELLAR & 2ND FLOOR APARTMENT WITH KITCHEN EXHAUST ON FIRST FLOOR UP TO ROOF AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICAITON.
Q00491943-I1
08/24/2022
Objection resolved — Addressed
08/23/2022
Objection resolved — Addressed
08/11/2022
Objection raised — Scope
08/11/2022
Objection raised — Inspections
08/04/2022
Filed — Alteration
PROPOSED INSTALLATION OF NEW COMMERCIAL PLUMBING FIXTURES ON FIRST & CELLAR FLOOR WITH ASSOCIATED PIPING & RELOCATION OF PLUMBING FIXTURES ON 2ND FLOOR RESIDENTIAL APARTMENT ALL AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, OCCUPANCY, OR EGRESS
Q00415256-P2
03/08/2022
Violation issued (HPD, closed)
A
11/22/2021
Permit issued — Mechanical Systems
Q00491943-I1-MS
11/05/2021
Permit issued — Plumbing
Q00415256-I1-PL
08/23/2021
Objection resolved — Addressed
08/15/2021
Objection raised — Scope
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGARDEN STATE OF NJ DATA*05/09/2025
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING08/14/2024
DOB NOWGeneral ConstructionSigned-offGARDEN STATE OF NJ DATA*08/07/2024
DOB NOWMechanical SystemsSigned-offDONE RIGHT KITCHEN EXHAUS11/22/2021
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO11/05/2021
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO08/05/2021
DOB NOWMechanical SystemsSigned-offGARDEN STATE OF NJ DATA*06/07/2021
BISOTISSUEDEKRA BUILDERS & CONSTRUCT03/08/2019
BISFPRE-ISSUEDIDEAL FIRE CONTROL, INC05/19/2000
1 project · most recent 04/06/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/06/2025Signed-offGARDEN STATE OF NJ DATA*Heating and Air Conditioning Systems
Heat / Cool
Daikin MAKE: DAIKIN INDUSTRIES, LTD | MODEL# 4MXS36WMVJU9 36,000 BTU · Condensing Unit ×1
MAKE: DAIKIN INDUSTRIES, LTD | MODEL# FTXS09WVJU9 9,000 BTU · Fan Coil Indoor ×1
MODEL: DAIKIN INDUSTRIES, LTD | MODEL# FTXS09WVJU9 9,000 BTU · Fan Coil Indoor ×1
MODEL: DAIKIN INDUSTRIES, LTD | MODEL# FTXS18WVJU9 18,000 BTU · Fan Coil Indoor ×1
1 project · most recent 04/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/06/2025Permit IssuedM & M PIPING AND HEATINGGas, Water/Sanitary
2 projects · most recent 05/23/2025
General Wiring
FiledStatusContractorScope
05/23/2025CompleteCONTROL SPEC ELECL SYSTEMGeneral Wiring
07/30/2021Permit IssuedGMJ ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
04/18/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/18/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/18/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/18/2025FinalNAVEEN KUMARprogress
04/18/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/18/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/18/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/05/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/05/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/05/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/05/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/05/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/05/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/05/2025FinalNAVEEN KUMARprogress
11/14/2022HVAC insulation and sealing Younes Abouyaalaenergy_progress
11/14/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/14/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
11/08/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
11/08/2022HVAC insulation and sealing Younes Abouyaalaenergy_progress
11/08/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/07/2021HVAC insulation and sealing Younes Abouyaalaenergy_progress
08/07/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/07/2021Mechanical SystemsYounes Abouyaalaspecial
08/07/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/07/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
Latest 25 of 31.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
08/27/2026Q00491943-P1Request digital key ↗
08/20/2026Q01071571-P2Request digital key ↗
08/20/2026Q01071571-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026Q00415256-P4Request digital key ↗
08/15/2026Q00415256-I1Request digital key ↗
08/15/2026Q00415256-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
03/08/2019440537180Open ↗
02/28/2019440537180Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/28/2019440537180Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature18
09/21/2026Q00415256-I1Open ↗
09/21/2026Q00415256-I1Open ↗
09/01/2026Q01071571-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00491943-I1Open ↗
08/27/2026Q00491943-P1Open ↗
08/25/2026Q00415256-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/21/2026Q00415256-I1Open ↗
09/01/2026Q01071571-S1Open ↗
08/31/2026Q00491943-P1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/28/2019440537180Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/28/2019440537180Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/28/2019440537180Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/28/2019440537180Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026Q00491943-P1Open ↗
08/25/2026Q00415256-P4Open ↗
08/20/2026Q01071571-S1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/08/2019440537180Open ↗
02/28/2019440537180Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00415256-I1Open ↗
08/13/2026Q00491943-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/28/2019440537180Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/08/2019440537180Open ↗
02/28/2019440537180Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/28/2019440537180Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/28/2019440537180Open ↗