Elevator co-op, conversion from loft/warehouse
575 AVENUE OF THE AMER
MANHATTAN · BIN 1014579
💬 Discuss this project
1900Year Built
9Stories
D0Building Class
C6-2AZoning
32,950 sfGross Floor Area
17Units
LL97 CoveredRent Stabilized9 Open Violations 5 unresolved · 4 paperwork only ▸FISP: SAFE
Elevator co-op, conversion from loft/warehouse · Owner of record: 575 OWNERS CORP · 3,450 sf lot · 9.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Floor 6Under Construction15p · 1 filing · 12 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 16p · 3 filings · 15 docs
CellarUnder Construction16p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PREMIERE EQUITIES807/08/2026
XINOS CONSTRUCTION1607/08/2026
JJS BUILDERS403/22/2026
575 OWNERS3903/22/2026
VERITAS PROPERTY MANAGEMENT1403/22/2026
LAWRENCE EXTERIOR REST CO103/22/2026
OWNER OF PREMISE #575 6 A103/22/2026
161 WEST 16 STREET OWN103/22/2026
PREMIER 575 SIXTH1203/21/2026
575 OWNER'S CORP.203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR803/21/2026
ARCHETYPE CONSULTANTS1403/21/2026
PANTOCRAFT403/21/2026
XINOS CONSTRUCTION1003/21/2026
D D EXPEDITORS203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
BMB BUILDING CONSULTING203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor707/08/2026
DNP BUILDERS LLCGeneral Contractor507/08/2026
CITY SIGNSScaffold407/08/2026
JJS BUILDERSGeneral Contractor303/21/2026
UNITECH DESIGNScaffold207/08/2026
TMG CONSTRUCTION CORPGeneral Contractor208/26/2026
WAI KEE CONSTRUCTION INCGeneral Contractor204/09/2026
HI-TECH C.P.M. CORPGeneral Contractor107/08/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
NY PRO DESIGN CORPGeneral Contractor104/09/2026
DENMAR ELECTRIC CORPElectrical103/22/2026
TUMEN, INCGeneral Contractor107/08/2026
ARREE ELECTRIC CORPElectrical103/22/2026
FRANK PUGLIESEElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
AMN PLUMBING CORPPlumbing109/03/2026
SOLUTION MECH CONTNG LLCPlumbing107/08/2026
VRISI PLBG & HTG LLCPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
PUGLIESE FRANKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678608/16/2026
AMINOV DESIGN ENGINEER, P9365207/15/2026
TECC DESIGNS AND SOLUTION7184403/25/2025
WD ENGINEERING PLLC9204203/11/2025
FORMACTIV ARCHITECTURE3024210/28/2024
JOSEPH K. BLUM CO. LLP1741105/24/2024
NY RESTORATION TECHNOLOGY6187109/08/2021
Building Lifecycle
All (175)Filed (31)Permit Issued (26)Signed Off (15)Facade (FISP) (12)Violation (42)Inspection (11)Objection (8)Special Inspection (30)
09/02/2026
Permit issued — Plumbing
M01420738-I1-PL
08/25/2026
Permit issued — Mechanical Systems
M01420736-I1-MS
08/16/2026
Filed — Alteration
Plumbing changes to retail space on part of the cellar as indicated on drawings.
M01420738-I1
08/16/2026
Filed — Alteration
Mechanical changes to retail space on part of the cellar as indicated on drawings.
M01420736-I1
08/13/2026
Permit issued — General Construction
M01420509-I1-GC
08/07/2026
Filed — Alteration
Architectural work to retail space on part of the cellar level as indicated on drawings.
M01420509-I1
08/07/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/15/2026
Filed — Alteration
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy.
M01351262-P1
07/15/2026
Filed — Alteration
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy.
M01351262-P2
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2026
Permit issued — Plumbing
M01351262-S1-PL
04/03/2026
Permit issued — General Construction
M01351262-I1-GC
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Other
02/19/2026
Objection raised — Other
01/29/2026
Filed — Alteration
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy.
M01351262-S1
01/29/2026
Filed — Alteration
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy.
M01351262-I1
10/23/2025
Signed off — Alteration
Renovation of residential apartment 3B (3rd fl) as per plans filed herewith. No change to use, egress, or occupancy under this application.
M01097145-I1
10/23/2025
Signed off — Alteration
Renovation of residential apartment 3B (3rd fl) as per plans filed herewith. No change to use, egress, or occupancy under this application.
M01097145-S1
09/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/08/2025
Objection raised — Scope
07/08/2025
Objection resolved — Addressed
06/16/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152861-I1
06/16/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152863-I1
06/16/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152862-I1
06/16/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152860-I1
06/13/2025
Signed off — Alteration
Mechanical work on the cellar and 1st floor (Moscot) as indicated on drawings
M01052698-I1
06/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/23/2025
Signed off — Alteration
Construction work on the cellar and 1st floor (Moscot) as indicated on drawings.
M01052688-I1
05/21/2025
Objection raised — Admin
05/21/2025
Objection resolved — Addressed
04/30/2025
Signed off — Alteration
M01052719-I1
04/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
ARTHUR NISONOV
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ARTHUR NISONOV
03/26/2025
Special inspection requirement — Mechanical Systems
ARTHUR NISONOV
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARTHUR NISONOV
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
ARTHUR NISONOV
03/26/2025
Special inspection requirement — Final
ARTHUR NISONOV
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
ARTHUR NISONOV
03/26/2025
Special inspection requirement — Maintenance information
ARTHUR NISONOV
03/25/2025
Filed — Alteration
Mechanical work on the cellar and 1st floor (Moscot) as indicated on drawings
M01052698-P1
03/19/2025
Permit issued — Structural
M01052719-I1-ST
03/19/2025
Permit issued — Mechanical Systems
M01052698-I1-MS
03/11/2025
Filed — Alteration
M01052719-P1
01/09/2025
Permit issued — Sign
M01152860-I1-SG
01/09/2025
Permit issued — Sign
M01152863-I1-SG
01/09/2025
Permit issued — Sign
M01152862-I1-SG
01/09/2025
Permit issued — Sign
M01152861-I1-SG
01/08/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152861-I1
01/08/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152863-I1
01/08/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152862-I1
01/08/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01152860-I1
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMN PLUMBING CORP09/02/2026
DOB NOWMechanical SystemsPermit IssuedTMG CONSTRUCTION CORP08/25/2026
DOB NOWGeneral ConstructionPermit IssuedTMG CONSTRUCTION CORP08/13/2026
DOB NOWPlumbingPermit IssuedVRISI PLBG & HTG LLC04/07/2026
DOB NOWGeneral ConstructionPermit IssuedNY PRO DESIGN CORP04/03/2026
DOB NOWStructuralSigned-offDNP BUILDERS LLC03/19/2025
DOB NOWMechanical SystemsSigned-offDNP BUILDERS LLC03/19/2025
DOB NOWSignSigned-offELMER DAWSON01/09/2025
DOB NOWSignSigned-offELMER DAWSON01/09/2025
DOB NOWSignSigned-offELMER DAWSON01/09/2025
DOB NOWSignSigned-offELMER DAWSON01/09/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.11/25/2024
DOB NOWGeneral ConstructionSigned-offWAI KEE CONSTRUCTION INC11/22/2024
DOB NOWMechanical SystemsSigned-offWAI KEE CONSTRUCTION INC11/22/2024
DOB NOWMechanical SystemsSigned-offDNP BUILDERS LLC09/25/2024
DOB NOWPlumbingPermit IssuedSOLUTION MECH CONTNG LLC09/17/2024
DOB NOWGeneral ConstructionSigned-offDNP BUILDERS LLC09/04/2024
DOB NOWGeneral ConstructionSigned-offTUMEN, INC06/27/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP07/06/2022
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP04/07/2022
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP12/10/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP08/17/2021
DOB NOWSignSigned-offUNITECH DESIGN INC10/20/2020
DOB NOWSignSigned-offUNITECH DESIGN INC06/12/2019
DOB NOWSidewalk ShedSigned-offJJS BUILDERS05/06/2019
DOB NOWConstruction FencePermit IssuedHI-TECH C.P.M. CORP01/30/2019
BISPLISSUEDPLUMB-IT MECHANICAL INC10/30/2023
BISPLISSUEDAVON PLBG & HTG INC03/01/2021
BISOTISSUEDWESBUILT CONSTRUCTION MAN08/12/2020
BISOTISSUEDUNITECH DESIGN INC06/12/2019
BISMHISSUEDHI-TECH C.P.M. CORP04/09/2019
BISSDISSUEDAVON PLBG & HTG INC04/05/2019
BISMHISSUEDH&M RENOVATION AND MORE I03/12/2019
BISPLISSUEDAVON PLBG & HTG INC02/21/2019
BISOTISSUEDHI-TECH C.P.M. CORP02/20/2019
BISPLISSUEDSTANLEY LEWIS P & H CORP12/07/2018
BISMHISSUEDCARDINAL BUILDERS, INC11/26/2018
BISOTISSUEDHI-TECH C.P.M. CORP11/26/2018
BISPLISSUEDSCARPONI&SON PLBG&HTG COR09/24/2018
BISOTISSUEDH&M RENOVATION AND MORE I09/14/2018
+ 36 more permits on file
1 project · most recent 08/16/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/16/2026Permit IssuedTMG CONSTRUCTION CORPAir Conditioning Systems
Cooling
Daikin FXMA24AAVJU/RXTA24AAVJU 2 tons · Vrf Indoor ×1
1 project · most recent 08/16/2026
Water/Sanitary
FiledStatusContractorScope
08/16/2026Permit IssuedAMN PLUMBING CORPWater/Sanitary
12 projects · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026Permit IssuedEVS ELECTRIC CORPGeneral Wiring
04/10/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
12/10/2024CompleteSHELBY ELECTRICAL CORP—
11/26/2024CompleteKJK ELECTRIC INCGeneral Wiring
08/27/2024Permit IssuedM&T ELECTRICAL LLCGeneral Wiring
06/22/2023Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
08/18/2021CompleteTOWER ELECTRIC INC.—
07/10/2019CompleteARREE ELECTRIC CORPGeneral Wiring
05/03/2019Permit IssuedRICHARD NEU—
04/07/2019CancelledRNW ELECTRIC CORPGeneral Wiring
10/02/2018CompleteGOTHAM WIRING LICENSEDGeneral Wiring
12/13/2017CompleteDENMAR ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/07/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2026Pass-Final PL - UndergroundPassView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
03/26/2025HVAC-R and service water heating system controlsARTHUR NISONOVenergy_progress
03/26/2025HVAC-R and service water piping design and insulationARTHUR NISONOVenergy_progress
03/26/2025Mechanical SystemsARTHUR NISONOVspecial
03/26/2025Fire-Resistant Penetrations and JointsARTHUR NISONOVspecial
03/26/2025Tenant Protection Plan ComplianceAri Kamospecial
03/26/2025Energy Code Compliance InspectionsARTHUR NISONOVprogress
03/26/2025FinalARTHUR NISONOVprogress
03/26/2025HVAC-R and service water heating equipmentARTHUR NISONOVenergy_progress
03/26/2025Maintenance informationARTHUR NISONOVenergy_progress
01/08/2025FinalGHANENDRA MISHRAprogress
11/18/2024FinalLLOYD FRUCHTMANprogress
11/18/2024Tenant Protection Plan ComplianceAri Kamospecial
11/18/2024Fire-Resistant Penetrations and JointsARTHUR NISONOVspecial
10/30/2024FinalLLOYD FRUCHTMANprogress
10/30/2024Tenant Protection Plan ComplianceWilliam DiMitrispecial
10/30/2024FinalWilliam DiMitriprogress
10/30/2024Fire-Resistant Penetrations and JointsARTHUR NISONOVspecial
10/30/2024Tenant Protection Plan Compliance—special
10/30/2024Post-installed AnchorsWilliam DiMitrispecial
10/30/2024Structural Cold-Formed SteelWilliam DiMitrispecial
10/22/2024Lighting in dwelling unitsRon Engenergy_progress
10/22/2024Lighting controlsRon Engenergy_progress
08/29/2024Fire-Resistant Penetrations and JointsRon Engspecial
08/29/2024Energy Code Compliance InspectionsRon Engprogress
08/29/2024Tenant Protection Plan ComplianceRon Engspecial
Latest 25 of 36.
▾Documents — 372 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch29
09/06/2026M00103288-I1Request digital key ↗
09/03/2026M00590417-I1Request digital key ↗
09/02/2026M00576848-P3Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00178108-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00162355-I1Request digital key ↗
▸Applications & Permits55
▸BISWORK PERMIT APPLICATION32
10/31/2023123429664Open ↗
03/01/2021123447234Open ↗
08/12/2020140800621Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
10/04/2023123429664Open ↗
03/01/2023122805544Open ↗
06/12/2019123768137Open ↗
Showing 3 of 19 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/12/2020140800621Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/12/2020140800621Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/28/2024123429664Open ↗
▸Seals & Professional Certifications90
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/03/2026M00590417-I1Open ↗
09/02/2026M00576848-P1Open ↗
09/02/2026M00576848-P3Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
03/02/2020123462724Open ↗
06/12/2019123768137Open ↗
09/04/2018123462724Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M01052698-I1Open ↗
09/01/2026M01052698-I1Open ↗
08/31/2026M01052481-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M01052698-I1Open ↗
09/01/2026M01052698-I1Open ↗
08/31/2026M01052481-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/12/2019123768137Open ↗
09/06/2018140800621Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/06/2018140800621Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/06/2018140800621Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/12/2019123768137Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
08/03/2018123447234Open ↗
08/03/2018123447234Open ↗
07/20/2018123462724Open ↗
Showing 3 of 7 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISHEATING SYSTEMS1
05/05/2023122805544Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes6
06/12/2019123768137Open ↗
11/09/2018123447234Open ↗
08/06/2018123462724Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/09/2018122805544Open ↗
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/03/2026M00590417-I1Open ↗
08/31/2026M00865826-I1Open ↗
08/27/2026M01052481-I1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
09/06/2018140800621Open ↗
08/03/2018123447234Open ↗
07/20/2018123462724Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/02/2020123462724Open ↗
06/12/2019123768137Open ↗
11/27/2018123447234Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/23/2024123429664Open ↗
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/02/2021140800621Open ↗
06/25/2020123768137Open ↗
03/02/2020123462724Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
05/23/2024123429664Open ↗
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BIS* HVAC INSULATION AND SEALING2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/06/2018140800621Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
05/05/2023122805544Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION AREAS1
05/05/2023122805544Open ↗
▸BISNYCECC ANALYSIS1
09/06/2018140800621Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/23/2024123429664Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00590417-I1Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY13
05/23/2024123429664Open ↗
05/23/2024123429664Open ↗
05/23/2024123429664Open ↗
Showing 3 of 13 on file for this type
▸BISMECHANICAL SYSTEMS3
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
05/04/2023122805544Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/05/2023122805544Open ↗
▸BISMASONRY1
05/05/2023122805544Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
05/28/2024123429664Open ↗
05/05/2023122805544Open ↗
07/02/2021140800621Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/31/2023123429664Open ↗
06/25/2020123768137Open ↗
11/13/2018123447234Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
09/06/2018140800621Open ↗
▸BISSUPERSEDING LETTER1
10/31/2023123429664Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT21
05/05/2023122805544Open ↗
05/05/2023122805544Open ↗
07/02/2021140800621Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/23/2024123429664Open ↗
05/05/2023122805544Open ↗
▸Filing & Intake Forms35
▸BISADDITIONAL INFORMATION15
04/08/2020123447234Open ↗
04/08/2020123447234Open ↗
04/08/2020123447234Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET10
06/12/2019123768137Open ↗
08/03/2018123447234Open ↗
08/03/2018123447234Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
10/31/2023123429664Open ↗
03/01/2021123447234Open ↗
03/02/2020123462724Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/06/2018140800621Open ↗
Showing 1 of 3 on file for this type
▸Other Documents3
▸BISCPC: HUDSON YARDS FINAL CERTIFICATION1
04/19/2018123429664Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/19/2018123429664Open ↗
▸BISMAINTENANCE INFORMATION1
05/23/2024123429664Open ↗