← Back
Walk-up cooperative
576 5 STREET
BROOKLYN · Park Slope · BIN 3025627
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R7BZoning
6,688 sfGross Floor Area
8Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 576 FIFTH ST OWNERS C · 2,566 sf lot · 2.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
576 FIFTH ST OWNERS C103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BFS ARCHITECT PC407/07/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN TECH CONSTRUCT CORGeneral Contractor107/08/2026
ASPECT PLBNG&HTNG CO LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BFS ARCHITECT PC7477407/07/2022
Building Lifecycle
All (25)Filed (4)Permit Issued (2)Signed Off (2)Violation (8)Inspection (4)Special Inspection (5)
03/20/2023
Violation issued (HPD, closed)
A
10/12/2022
Signed off — Alteration
B00664793-I1
09/23/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/19/2022
Signed off — Alteration
Kitchen and bathroom renovation. Replace bathroom fixtures in existing roughing, recap & remove existing gas stove and relocate existing kitchen sink.
B00664794-I1
07/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
07/19/2022
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
07/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Belal Salim
07/19/2022
Special inspection requirement — Lighting in dwelling units
Belal Salim
07/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2022
Filed — Alteration
B00664793-P1
07/07/2022
Filed — Alteration
Kitchen and bathroom renovation. Replace bathroom fixtures in existing roughing, recap & remove existing gas stove and relocate existing kitchen sink.
B00664794-P1
07/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
03/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2022
Violation issued (HPD, closed)
A
01/31/2022
Permit issued — Plumbing
B00664794-I1-PL
01/27/2022
Permit issued — General Construction
B00664793-I1-GC
01/21/2022
Filed — Alteration
B00664793-I1
01/21/2022
Filed — Alteration
Kitchen and bathroom renovation. Replace bathroom fixtures in existing roughing, recap & remove existing gas stove and relocate existing kitchen sink.
B00664794-I1
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC01/31/2022
DOB NOWGeneral ConstructionSigned-offDESIGN TECH CONSTRUCT COR01/27/2022
BISPLISSUEDMETROCITY GROUP,INC08/05/2013
BISOTISSUEDWT BUILDERS LLC07/08/2013
1 project · most recent 03/12/2022
General Wiring
FiledStatusContractorScope
03/12/2022CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/23/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/19/2022Fire-Resistant Penetrations and JointsBelal Salimspecial
07/19/2022Fire-Resistance Rated ConstructionBelal Salimprogress
07/19/2022Energy Code Compliance InspectionsBelal Salimprogress
07/19/2022Lighting in dwelling unitsBelal Salimenergy_progress
07/07/2022Fire-Resistant Penetrations and JointsBelal Salimspecial
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00664794-I1Request digital key ↗
08/31/2026B00664794-P1Request digital key ↗
08/31/2026B00664793-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit4
08/31/2026B00664794-I1Open ↗
08/31/2026B00664794-P1Open ↗
08/13/2026B00664793-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/05/2013320833675Open ↗
08/31/2013320833675Open ↗
07/03/2013320833675Open ↗
▸BISWORK PERMIT APPLICATION2
08/13/2013320833675Open ↗
07/15/2013320833675Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00664794-I1Open ↗
08/31/2026B00664794-P1Open ↗
08/31/2026B00664793-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/12/2014320833675Open ↗
07/03/2013320833675Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00664794-P1Open ↗
08/24/2026B00664793-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00664793-I1Open ↗
08/24/2026B00664793-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/03/2013320833675Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/03/2013320833675Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
09/05/2013320833675Open ↗
08/31/2013320833675Open ↗
07/03/2013320833675Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/30/2013320833675Open ↗
10/15/2013320833675Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00664794-P1Open ↗
08/31/2026B00664794-I1Open ↗
08/31/2026B00664793-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/03/2013320833675Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/12/2014320833675Open ↗
07/03/2013320833675Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/12/2014320833675Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00664793-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/12/2014320833675Open ↗
07/12/2014320833675Open ↗
10/30/2013320833675Open ↗
▸BISLANDMARKS APPROVAL1
07/03/2013320833675Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/03/2013320833675Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/12/2014320833675Open ↗
07/03/2013320833675Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/03/2013320833675Open ↗
▸BISADDITIONAL INFORMATION1
09/05/2013320833675Open ↗