← Back
Miscellaneous two family
577 6 STREET
BROOKLYN · BIN 3025667
💬 Discuss this project
1911Year Built
4Stories
B9Building Class
R7BZoning
4,687 sfGross Floor Area
2Units
Miscellaneous two family · Owner of record: 577-577A SIXTH STREET OWNERS CORP · 1,980 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
577-577A OWNERS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL SCOTT, ARCHITECT PC409/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SELF EMPLOYED403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TADKAR CONSTRUCTION INCGeneral Contractor107/08/2026
MARTIN PLG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL SCOTT, ARCHITECT P.C7717409/26/2023
Building Lifecycle
All (36)Filed (4)Permit Issued (2)Signed Off (2)Inspection (2)Objection (12)Special Inspection (14)
07/31/2024
Signed off — Alteration
Alt.2 to add new powder room on the 1 floor of a duplex apartment. The scope of work includes new non-load bearing partitions, new door, new lavatory, toilet and new mechanical bathroom exhaust. No change to use, egress or occupancy. No exterior work.
B00864721-I1
07/31/2024
Signed off — Alteration
Alt.2 to add new powder room on the 1 floor of a duplex apartment. The scope of work includes new non-load bearing partitions, new door, new lavatory, toilet and new mechanical bathroom exhaust. No change to use, egress or occupancy. No exterior work
B00864618-I1
03/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2023
Permit issued — Plumbing
B00864618-I1-PL
12/15/2023
Permit issued — General Construction
B00864721-I1-GC
10/03/2023
Objection resolved — Addressed
10/02/2023
Objection raised — Scope
09/26/2023
Filed — Alteration
Alt.2 to add new powder room on the 1 floor of a duplex apartment. The scope of work includes new non-load bearing partitions, new door, new lavatory, toilet and new mechanical bathroom exhaust. No change to use, egress or occupancy. No exterior work.
B00864721-P1
09/26/2023
Filed — Alteration
Alt.2 to add new powder room on the 1 floor of a duplex apartment. The scope of work includes new non-load bearing partitions, new door, new lavatory, toilet and new mechanical bathroom exhaust. No change to use, egress or occupancy. No exterior work
B00864618-P1
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Scott
09/26/2023
Special inspection requirement — Final
Paul Scott
09/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Scott
09/26/2023
Special inspection requirement — Lighting controls
Paul Scott
09/26/2023
Special inspection requirement — Lighting in dwelling units
Paul Scott
09/26/2023
Special inspection requirement — Metering
Paul Scott
09/26/2023
Special inspection requirement — Interior lighting power
Paul Scott
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Scott
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Scott
09/19/2023
Special inspection requirement — Final
Paul Scott
09/19/2023
Special inspection requirement — Metering
Paul Scott
09/19/2023
Special inspection requirement — Lighting controls
Paul Scott
09/19/2023
Special inspection requirement — Interior lighting power
Paul Scott
09/19/2023
Special inspection requirement — Lighting in dwelling units
Paul Scott
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
05/02/2023
Objection raised — Scope
05/02/2023
Objection raised — Admin
05/01/2023
Objection raised — Scope
05/01/2023
Objection raised — Inspections
05/01/2023
Objection raised — Energy
04/27/2023
Filed — Alteration
Alt.2 to add new powder room on the 1 floor of a duplex apartment. The scope of work includes new non-load bearing partitions, new door, new lavatory, toilet and new mechanical bathroom exhaust. No change to use, egress or occupancy. No exterior work.
B00864721-I1
04/27/2023
Filed — Alteration
Alt.2 to add new powder room on the 1 floor of a duplex apartment. The scope of work includes new non-load bearing partitions, new door, new lavatory, toilet and new mechanical bathroom exhaust. No change to use, egress or occupancy. No exterior work
B00864618-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMARTIN PLG & HTG INC12/20/2023
DOB NOWGeneral ConstructionSigned-offTADKAR CONSTRUCTION INC12/15/2023
BISOTISSUEDQUIXOTIC SYSTEMS INC04/06/2018
BISOTISSUEDQUIXOTIC SYSTEMS INC01/30/2018
2 projects · most recent 12/05/2023
General Wiring
FiledStatusContractorScope
12/05/2023CompleteMAC ELECT'L CONTR. INC.General Wiring
05/07/2018CompleteA.L. ELECTRICAL CORP.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
09/26/2023Fire-Resistant Penetrations and JointsPaul Scottspecial
09/26/2023FinalPaul Scottprogress
09/26/2023Energy Code Compliance InspectionsPaul Scottprogress
09/26/2023Lighting controlsPaul Scottenergy_progress
09/26/2023Lighting in dwelling unitsPaul Scottenergy_progress
09/26/2023MeteringPaul Scottenergy_progress
09/26/2023Interior lighting powerPaul Scottenergy_progress
09/19/2023Fire-Resistant Penetrations and JointsPaul Scottspecial
09/19/2023Energy Code Compliance InspectionsPaul Scottprogress
09/19/2023FinalPaul Scottprogress
09/19/2023MeteringPaul Scottenergy_progress
09/19/2023Lighting controlsPaul Scottenergy_progress
09/19/2023Interior lighting powerPaul Scottenergy_progress
09/19/2023Lighting in dwelling unitsPaul Scottenergy_progress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00864721-I1Request digital key ↗
08/27/2026B00864721-P1Request digital key ↗
08/14/2026B00864618-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit4
08/14/2026B00864618-I1Open ↗
08/13/2026B00864721-P1Open ↗
08/13/2026B00864618-P1Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
04/09/2018340571269Open ↗
01/30/2018340571269Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/22/2017340571269Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00864618-I1Open ↗
08/13/2026B00864721-P1Open ↗
08/13/2026B00864618-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/22/2026B00864721-I1Open ↗
08/22/2026B00864721-I1Open ↗
08/22/2026B00864721-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B00864721-I1Open ↗
08/22/2026B00864721-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/22/2017340571269Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
12/22/2017340571269Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/14/2026B00864618-I1Open ↗
08/13/2026B00864721-P1Open ↗
08/13/2026B00864721-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/22/2017340571269Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/25/2018340571269Open ↗
12/22/2017340571269Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/25/2018340571269Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/22/2017340571269Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/25/2018340571269Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/25/2018340571269Open ↗
12/22/2017340571269Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/25/2018340571269Open ↗
▸BISLANDMARKS SIGNOFF1
07/25/2018340571269Open ↗
▸BISLANDMARKS APPROVAL1
01/22/2018340571269Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
07/25/2018340571269Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/25/2018340571269Open ↗
12/22/2017340571269Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
01/26/2018340571269Open ↗
01/22/2018340571269Open ↗
01/17/2018340571269Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/22/2017340571269Open ↗