3 Open Violations 1 unresolved · 2 paperwork only▸
HPD03/11/2021§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING CONSISTING OF KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT METAL GATE AT BUILDING FRONT
ECB12/10/2002RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES C OF O. #174114 THREE FAMILIES AT TIME OF INSPECTION 3 SRO APT IN CELLAR WITH 3 PC BATHROOM OF A FULL KITCHENNothing owed — awaiting certificate of correction
ECB12/10/2002WORK WITHOUT A PERMIT. WORK NOTED CALLAR INTERION WALL PARTITION EREATING 3 SRO APT IN CELLAR 3 PC BATHROOM IN CELLAR IN A FULL KITCHEN THAT ARE SHARED NO INCNALAUE IN 3 SRO APTS. REMEDY: OBTAIN A PERMIT MAKE SNothing owed — awaiting certificate of correction
Two family brick · 2,000 sf lot · 1.13 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.