← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
578 ATLANTIC AVENUE
BROOKLYN · BIN 3388735
💬 Discuss this project
1931Year Built
—Stories
RMBuilding Class
R8AZoning
9,726 sfGross Floor Area
9Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 2,276 sf lot · 4.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1p · 1 filing · 15 docs
CellarUnder Construction5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
557 ATLANTIC OWNERS2007/08/2026
TIMES PLAZA DEVELOPMENT1107/08/2026
PLS FINANCIAL SERVICES103/21/2026
578 ATLANTIC REALTY1203/21/2026
578 ATLANTIC AVENUE REALTY203/21/2026
FOREMOST CONTRACTING403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK DESIGN ARCHITECTS, LLP509/02/2025
CHANDA ENGINEERING CONSULTANT PC408/20/2025
YOUN DESIGN CORP.105/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECT LLP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIECE MANAGEMENT INCGeneral Contractor507/08/2026
SPEEDWAY PLUMBING CORPPlumbing207/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
BENGAL CONSTRUCTION NY INGeneral Contractor104/09/2026
C PLUS DESIGN GROUP INCGeneral Contractor107/08/2026
OASIS PLOMO CORPGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
BERGER CARLOSElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
SALVATORE FILOTEOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957509/02/2025
CHANDA ENG. CONSULTANT PC6842305/28/2025
Building Lifecycle
All (77)Filed (10)Permit Issued (12)Signed Off (6)Violation (14)Inspection (5)Special Inspection (30)
05/04/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING CARPENTRY, NEW PARTITIONS, NEW ELECTRIC PIZZA OVEN, ELECTRIC COOKING EQUIPMENT INSTALL. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01199426-S2
03/13/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING CARPENTRY, NEW PARTITIONS, NEW ELECTRIC PIZZA OVEN, ELECTRIC COOKING EQUIPMENT INSTALL. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01199426-I1
11/03/2025
Violation issued (ECB, closed)
Unknown
09/30/2025
Permit issued — Plumbing
B01199426-S1-PL
09/24/2025
Signed off — Alteration
APPLICATION IS FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL NEW WASTE LINE PIPING AND NEW WATER SUPPLY LINES AS NECESSARY. APPLICATION INCLUDES THE RELOCATION OF ALL EXISTING SPRINKLER HEADS TO RETROFIT NEW TENANT LAYOUT.
B00927471-I1
09/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Permit issued — Construction Fence
B01199426-S2-FN
09/04/2025
Permit issued — Sprinklers
B00927471-I1-PL
09/02/2025
Filed — Alteration
APPLICATION IS FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL NEW WASTE LINE PIPING AND NEW WATER SUPPLY LINES AS NECESSARY. APPLICATION INCLUDES THE RELOCATION OF ALL EXISTING SPRINKLER HEADS TO RETROFIT NEW TENANT LAYOUT.
B00927471-P1
09/02/2025
Special inspection requirement — Sprinkler Systems
REZA KHAMCY
09/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
08/29/2025
Signed off — Alteration
APPLICATION FILED FOR AN ALTERATION OF AN EXISTING RETAIL SPACE, INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, SIGNAGE, AND ALL OTHER RELATED WORK AS PER PLANS. INCLUDING A NEW HVAC SYSTEM AND DUCTWORK THROUGHOUT. NO CHANGE IN USE, EGRESS
B00927469-I1
08/29/2025
Special inspection requirement — Sprinkler Systems
REZA KHAMCY
08/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING CARPENTRY, NEW PARTITIONS, NEW ELECTRIC PIZZA OVEN, ELECTRIC COOKING EQUIPMENT INSTALL. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01199426-S2
07/28/2025
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01223174-I1
07/14/2025
Permit issued — General Construction
B01199426-I1-MS
07/02/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
06/20/2025
Permit issued — Sign
B01223174-I1-SG
06/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Final
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Maintenance information
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Lighting controls
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Exterior lighting power
Giuseppe Anzalone
06/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
05/30/2025
Filed — Alteration
APPLICATION FILED FOR AN ALTERATION OF AN EXISTING RETAIL SPACE, INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, SIGNAGE, AND ALL OTHER RELATED WORK AS PER PLANS. INCLUDING A NEW HVAC SYSTEM AND DUCTWORK THROUGHOUT. NO CHANGE IN USE, EGRESS
B00927469-P1
05/28/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING CARPENTRY, NEW PARTITIONS, NEW ELECTRIC PIZZA OVEN, ELECTRIC COOKING EQUIPMENT INSTALL. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01199426-P1
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
05/27/2025
Special inspection requirement — Mechanical Systems
KARTIK CHANDA
05/27/2025
Special inspection requirement — Final
KARTIK CHANDA
05/27/2025
Special inspection requirement — Maintenance information
KARTIK CHANDA
05/11/2025
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01223174-I1
04/22/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING CARPENTRY, NEW PARTITIONS, NEW ELECTRIC PIZZA OVEN, ELECTRIC COOKING EQUIPMENT INSTALL. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01199426-S1
04/21/2025
Permit issued — Mechanical Systems
B01199426-I1-GC
04/21/2025
Special inspection requirement — Exterior lighting power
Giuseppe Anzalone
04/21/2025
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
04/21/2025
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
04/21/2025
Special inspection requirement — Lighting controls
Giuseppe Anzalone
04/21/2025
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
04/21/2025
Special inspection requirement — Maintenance information
Giuseppe Anzalone
04/17/2025
Signed off — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE FOR THE INSTALLATION OF THE STOREFRONT, STOREFRONT WORK FILED UNDER SEPARATE APPLICATION
B00927183-I1
04/07/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING CARPENTRY, NEW PARTITIONS, NEW ELECTRIC PIZZA OVEN, ELECTRIC COOKING EQUIPMENT INSTALL. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
B01199426-I1
10/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2024
Permit issued — Construction Fence
B00927183-I1-FN
07/09/2024
Permit issued — General Construction
B00927469-I1-GC-CX
06/13/2024
Permit issued — Sprinklers
B00927471-I1-EW-SP
06/12/2024
Permit issued — Sprinklers
B00927471-I1-PL
06/11/2024
Permit issued — Construction Fence
B00927183-I1-FN
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS09/30/2025
DOB NOWConstruction FencePermit IssuedC PLUS DESIGN GROUP INC09/09/2025
DOB NOWSprinklersSigned-offSPEEDWAY PLUMBING CORP09/04/2025
DOB NOWGeneral ConstructionSigned-offOASIS PLOMO CORP07/14/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC06/20/2025
DOB NOWMechanical SystemsSigned-offBENGAL CONSTRUCTION NY IN04/21/2025
DOB NOWConstruction FenceSigned-offPIECE MANAGEMENT INC07/09/2024
DOB NOWGeneral ConstructionSigned-offPIECE MANAGEMENT INC07/09/2024
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP06/13/2024
DOB NOWSprinklersSigned-offSPEEDWAY PLUMBING CORP06/12/2024
DOB NOWConstruction FenceSigned-offPIECE MANAGEMENT INC06/11/2024
DOB NOWGeneral ConstructionSigned-offPIECE MANAGEMENT INC05/03/2024
BISPLISSUEDBAYVIEW PLBG & HTG CORP09/18/2015
BISOTISSUEDBEN'S GEN'L CONTRACT CORP06/23/2015
BISEQISSUEDBEN'S GEN'L CONTRACT CORP06/23/2015
BISOTISSUEDMICHELLE KUO CORP09/03/2013
BISEQISSUEDPERIMETER04/20/2007
BISPLISSUEDRELIABLE PLBG & HTG CORP10/06/2005
BISPLISSUEDRELIABLE PLBG & HTG CORP09/28/2005
BIS—ISSUEDFOREMOST CONTRACTING LLC03/09/2005
BISSPISSUEDFIVE BOROUGH NYC LLC01/26/2005
BISPLISSUEDRELIABLE PLBG & HTG CORP09/08/2004
BISMHISSUEDMICHELLE KUO CORP06/22/2004
BISEQISSUEDMICHELLE KUO CORP06/22/2004
BIS—ISSUEDFOREMOST CONTRACTING LLC04/21/2004
BISEQISSUEDSPRING SCAFFOLDING03/05/2004
BIS—ISSUEDFOREMOST CONTRACTING LLC01/30/2004
BISOTISSUEDPRESTIGIOUS PAINTING & CONTR02/19/2003
BISFPISSUEDFIRE FOE CORPORATION11/01/1995
BISOTISSUEDA INTERNATIONAL LTD01/06/1995
BISEQISSUEDA INTERNATIONL LTD01/06/1995
BISFPISSUEDIDEAL FIRE CONTROL, INC.05/30/1991
1 project · most recent 08/20/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2025Permit IssuedC PLUS DESIGN GROUP INCVentilation Systems
Ventilation
Pennbarry FX138HFT 1,200 CFM · Exhaust Fan ×1
Greenheck CUBE120 1,200 CFM · Exhaust Fan ×1
1 project · most recent 08/20/2025
Water/Sanitary
FiledStatusContractorScope
08/20/2025Permit IssuedDYNAMIC PLBG & SPRKLR CORWater/Sanitary
4 projects · most recent 12/02/2025
General Wiring
FiledStatusContractorScope
12/02/2025CompleteMODERN VOLTAGE NYC INCGeneral Wiring
04/30/2025Permit IssuedCITY GRID ELECTRIC CORPGeneral Wiring
04/22/2025CompleteJONG HYUN KIM—
11/15/2024CompleteLEBO ELECTRIC LLCGeneral Wiring
1 project · most recent 08/20/2025
Fence
FiledStatusContractorScope
08/20/2025Permit IssuedDYNAMIC PLBG & SPRKLR CORFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2025Pass-Final Sign Permit InspectionPassView ↗
10/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/02/2025Sprinkler SystemsREZA KHAMCYspecial
09/02/2025Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
08/29/2025Sprinkler SystemsREZA KHAMCYspecial
08/29/2025Tenant Protection Plan Compliance—special
06/02/2025Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
06/02/2025Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
06/02/2025Mechanical SystemsGiuseppe Anzalonespecial
06/02/2025Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
06/02/2025FinalGiuseppe Anzaloneprogress
06/02/2025Maintenance informationGiuseppe Anzaloneenergy_progress
06/02/2025Lighting controlsGiuseppe Anzaloneenergy_progress
06/02/2025Ventilation and air distribution systemGiuseppe Anzaloneenergy_progress
06/02/2025Interior lighting powerGiuseppe Anzaloneenergy_progress
06/02/2025Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
06/02/2025Shutoff dampersGiuseppe Anzaloneenergy_progress
06/02/2025Air barrier - visual inspectionGiuseppe Anzaloneenergy_progress
06/02/2025Exterior lighting powerGiuseppe Anzaloneenergy_progress
06/02/2025Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
05/28/2025Tenant Protection Plan Compliance—special
05/27/2025Tenant Protection Plan Compliance—special
05/27/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
05/27/2025Mechanical SystemsKARTIK CHANDAspecial
05/27/2025FinalKARTIK CHANDAprogress
05/27/2025Maintenance informationKARTIK CHANDAenergy_progress
04/21/2025Exterior lighting powerGiuseppe Anzaloneenergy_progress
Latest 25 of 37.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00927471-P1Request digital key ↗
08/26/2026B00927471-I1Request digital key ↗
08/26/2026B00927183-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
06/29/2015321137453Open ↗
11/16/2013320855419Open ↗
11/16/2013320855419Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
09/21/2015321137453Open ↗
06/29/2015321137453Open ↗
09/11/2013320855419Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00927471-P1Open ↗
08/26/2026B00927471-I1Open ↗
08/26/2026B00927183-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
07/14/2016321137453Open ↗
07/14/2016321137453Open ↗
06/17/2016321137453Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B00927471-I1Open ↗
09/23/2026B00927471-I1Open ↗
09/23/2026B01199426-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01199426-P1Open ↗
09/23/2026B01199426-P1Open ↗
08/24/2026B00927469-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/11/2013320855419Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/11/2013320855419Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
11/16/2013320855419Open ↗
09/11/2013320855419Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/29/2015321137453Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00927471-I1Open ↗
08/26/2026B00927471-P1Open ↗
08/26/2026B00927469-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/29/2015321137453Open ↗
09/11/2013320855419Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/14/2016321137453Open ↗
07/14/2016321137453Open ↗
06/29/2015321137453Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/14/2016321137453Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
09/11/2013320855419Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/14/2016321137453Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/14/2016321137453Open ↗
06/29/2015321137453Open ↗
09/11/2013320855419Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
12/15/2015321137453Open ↗
11/16/2013320855419Open ↗
11/16/2013320855419Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
06/29/2015321137453Open ↗
09/11/2013320855419Open ↗