← Back
All parking garages
579 39 STREET
BROOKLYN · BIN 3332135
💬 Discuss this project
1924Year Built
1Stories
G1Building Class
M1-2Zoning
2,824 sfGross Floor Area
15Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
All parking garages · Owner of record: 579-581 LLC · 3,758 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YORK TOWER CONSULTING ENGINEERING106/18/2026
JOHN SCHIMENTI, P.C. ARCHITECT302/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN N SAFETY INCGeneral Contractor307/08/2026
CROWBAR INDUSTRIESGeneral Contractor107/02/2026
Building Lifecycle
All (29)Filed (4)Permit Issued (3)Signed Off (3)Violation (3)Objection (14)Special Inspection (2)
08/20/2026
Signed off — Alteration
REMOVE EXISTING PARTIALLY COLLAPSED FENCE WALL AND CHAIN-LINK FENCE. INSTALL NEW CMU CURB AND CHAIN-LINK FENCE. TO COMPLY WITH DOB VIOLAITONS 060126CRW30101KI & 060126CRW30702KI
B01415936-I1
06/30/2026
Permit issued — Structural
B01415936-I1-GC-CX
06/18/2026
Filed — Alteration
REMOVE EXISTING PARTIALLY COLLAPSED FENCE WALL AND CHAIN-LINK FENCE. INSTALL NEW CMU CURB AND CHAIN-LINK FENCE. TO COMPLY WITH DOB VIOLAITONS 060126CRW30101KI & 060126CRW30702KI
B01415936-I1
06/11/2026
Special inspection requirement — Final
Vachagan Grigoryan
06/01/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/2022
Signed off — Alteration
TEMPORARY CONSTRUCTION 8' FENCE FILED HEREWITH (CONTRACTOR TO COORDINATE DOT PERMIT. for fence extending more than 3' beyond property line)
B00627098-I1
05/04/2022
Signed off — Alteration
Modification to existing garage and repave as required
B00606272-I1
02/25/2022
Objection resolved — Addressed
02/25/2022
Special inspection requirement — Final
John Schimenti
02/24/2022
Objection resolved — Addressed
02/23/2022
Permit issued — General Construction
B00606272-I1-GC
02/18/2022
Objection raised — Structural
02/18/2022
Objection raised — Mechanical
02/17/2022
Filed — Alteration
TEMPORARY CONSTRUCTION 8' FENCE FILED HEREWITH (CONTRACTOR TO COORDINATE DOT PERMIT. for fence extending more than 3' beyond property line)
B00627098-P1
12/10/2021
Permit issued — Construction Fence
B00627098-I1-FN
11/18/2021
Objection resolved — Addressed
11/18/2021
Objection resolved — Addressed
11/12/2021
Objection raised — Structural
11/12/2021
Objection raised — Scope
11/10/2021
Filed — Alteration
TEMPORARY CONSTRUCTION 8' FENCE FILED HEREWITH (CONTRACTOR TO COORDINATE DOT PERMIT. for fence extending more than 3' beyond property line)
B00627098-I1
10/08/2021
Objection raised — Admin
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Other
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Admin
10/08/2021
Objection resolved — Addressed
10/06/2021
Filed — Alteration
Modification to existing garage and repave as required
B00606272-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCROWBAR INDUSTRIES INC06/30/2026
DOB NOWGeneral ConstructionSigned-offDESIGN N SAFETY INC02/23/2022
DOB NOWConstruction FenceSigned-offDESIGN N SAFETY INC12/10/2021
1 project · most recent 06/18/2026
FiledStatusContractorScope
06/18/2026Signed-offCROWBAR INDUSTRIES INC1 scope_items
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/11/2026FinalVachagan Grigoryanprogress
02/25/2022FinalJohn Schimentiprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00606272-I1Request digital key ↗
08/16/2026B01415936-I1Request digital key ↗
08/15/2026B00627098-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00627098-P1Open ↗
08/31/2026B00627098-I1Open ↗
08/16/2026B01415936-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/03/2026B01415936-I1Open ↗
08/29/2026B00627098-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01415936-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00606272-I1Open ↗
▸Other Documents1
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00606272-I1Open ↗