← Back
Two family converted from one family
579 MACON STREET
BROOKLYN · BIN 3046614
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,096 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,667 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction12p · 1 filing · 13 docs
Floor 1Under Construction13p · 1 filing · 13 docs
CellarUnder Construction12p · 1 filing · 13 docs
Sub-BasementUnder Construction12p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2025$999K—Private party → 579 MACON LLC$477/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN204/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor104/09/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781204/27/2026
Building Lifecycle
All (33)Filed (2)Permit Issued (2)Violation (2)Inspection (1)Special Inspection (26)
05/22/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
05/06/2026
Permit issued — Plumbing
B01350556-S1-PL
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
04/27/2026
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing two family dwellings. Filed in conjunction with ALT II app B01350556-I1
B01350556-S1
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Andrew Inga
04/22/2026
Special inspection requirement — Maintenance information
Andrew Inga
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Andrew Inga
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Andrew Inga
03/02/2026
Permit issued — General Construction
B01350556-I1-GC-CX
01/27/2026
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing two family dwellings. Filed in conjunction with ALT II app B01350556-I1
B01350556-I1
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — Final
Andrew Inga
01/23/2026
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Andrew Inga
01/23/2026
Special inspection requirement — Insulation placement and R values
Andrew Inga
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Andrew Inga
01/23/2026
Special inspection requirement — Air barrier - visual inspection
Andrew Inga
01/23/2026
Special inspection requirement — Structural Steel - Welding
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — Interior lighting power
Andrew Inga
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Andrew Inga
01/23/2026
Special inspection requirement — Fenestration air leakage
Andrew Inga
01/23/2026
Special inspection requirement — Fenestration areas
Andrew Inga
01/23/2026
Special inspection requirement — Permanent certificate
Andrew Inga
01/23/2026
Special inspection requirement — Maintenance information
Andrew Inga
01/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Andrew Inga
01/23/2026
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
11/08/2019
Violation issued (HPD, closed)
I
01/10/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING05/06/2026
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC03/02/2026
1 project · most recent 04/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/27/2026Permit IssuedBT'S PLUMBING AND HEATINGGas, Water/Sanitary
1 project · most recent 08/09/2026
General Wiring
FiledStatusContractorScope
08/09/2026Permit IssuedLIFE SPOT ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/22/2026Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/28/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/28/2026Energy Code Compliance InspectionsAndrew Ingaprogress
04/22/2026HVAC-R and service water piping design and insulationAndrew Ingaenergy_progress
04/22/2026Maintenance informationAndrew Ingaenergy_progress
04/22/2026HVAC-R and service water heating system controlsAndrew Ingaenergy_progress
04/22/2026HVAC-R and service water heating equipmentAndrew Ingaenergy_progress
01/23/2026Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/23/2026FinalAndrew Ingaprogress
01/23/2026Footing and FoundationCHRISTIAN LOZADAprogress
01/23/2026HVAC-R and service water piping design and insulationAndrew Ingaenergy_progress
01/23/2026Insulation placement and R valuesAndrew Ingaenergy_progress
01/23/2026HVAC-R and service water heating equipmentAndrew Ingaenergy_progress
01/23/2026Air barrier - visual inspectionAndrew Ingaenergy_progress
01/23/2026Structural Steel - WeldingCHRISTIAN LOZADAspecial
01/23/2026Interior lighting powerAndrew Ingaenergy_progress
01/23/2026HVAC-R and service water heating system controlsAndrew Ingaenergy_progress
01/23/2026Fenestration air leakageAndrew Ingaenergy_progress
01/23/2026Fenestration areasAndrew Ingaenergy_progress
01/23/2026Permanent certificateAndrew Ingaenergy_progress
01/23/2026Maintenance informationAndrew Ingaenergy_progress
01/23/2026Fenestration and door U-factor and product ratingsAndrew Ingaenergy_progress
01/23/2026Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
01/23/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/23/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
01/23/2026Structural Steel - DetailsCHRISTIAN LOZADAspecial
Latest 25 of 26.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026B01350556-S1Request digital key ↗
08/17/2026B01350556-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026B01350556-S1Open ↗
08/25/2026B01350556-S1Open ↗
08/22/2026B01350556-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026B01350556-S1Open ↗
08/17/2026B01350556-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01350556-S1Open ↗
08/22/2026B01350556-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026B01350556-I1Open ↗
08/17/2026B01350556-S1Open ↗