← Back
Over six families without stores
579 ST JOHNS PLACE
BROOKLYN · BIN 3029506
💬 Discuss this project
1909Year Built
4Stories
C1Building Class
R6BZoning
5,720 sfGross Floor Area
8Units
Rent Stabilized35 Open Violations 31 unresolved · 4 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 579 SAINT JOHNS PLACE LLC · 2,080 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 41p · 1 filing · 3 docs
Floor 32p · 1 filing · 3 docs
Floor 21p · 1 filing · 3 docs
Floor 12p · 1 filing · 3 docs
Cellar4p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
579 SAINT JOHNS PLACE LLC103/22/2026
TO THE OWNER OF ST JOHNS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACOBSON SHINODA ARCHITECTS506/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RITE ONE EXPEDITING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EZ RUNER CONSTRUCTION CORPPlumbing407/08/2026
BRANCH PLUMBING LLCPlumbing307/08/2026
DLM CONTRACTORS INCGeneral Contractor203/21/2026
EZ RUNER CONSTRUCTION CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACOBSON SHINODA ARCHITEC7884306/15/2022
BUILDTECH ENGINEERING6369105/18/2021
Building Lifecycle
All (81)Filed (5)Permit Issued (6)Signed Off (2)Violation (60)Inspection (6)Special Inspection (2)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2025
Violation issued (HPD, open)
C
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, open)
C
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
06/10/2025
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2023
Violation issued (HPD, closed)
A
09/30/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/08/2022
Violation issued (HPD, closed)
C
07/05/2022
Signed off — Alteration
plumbing work including installation of new hot water heaters. 9 new gas meters on 9 new gas meter bars, 9 gas risers, 8 serving existing residential gas ranges from floor 1 thru 4, one riser serving new water heaters and a boiler (filed separately)
B00520248-I1
06/29/2022
Signed off — Alteration
B00520262-I1
06/15/2022
Filed — Alteration
plumbing work including installation of new hot water heaters. 9 new gas meters on 9 new gas meter bars, 9 gas risers, 8 serving existing residential gas ranges from floor 1 thru 4, one riser serving new water heaters and a boiler (filed separately)
B00520248-P2
06/15/2022
Permit issued — General Construction
B00519187-I1-GC
04/15/2022
Permit issued — Plumbing
B00520248-I1-PL
03/02/2022
Violation issued (HPD, closed)
A
09/09/2021
Filed — Alteration
plumbing work including installation of new hot water heaters. 9 new gas meters on 9 new gas meter bars, 9 gas risers, 8 serving existing residential gas ranges from floor 1 thru 4, one riser serving new water heaters and a boiler (filed separately)
B00520248-P1
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER SHINODA
09/07/2021
Special inspection requirement — Maintenance information
PETER SHINODA
08/19/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/02/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/13/2021
Permit issued — Boiler Equipment
B00520262-I1-BE
07/09/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/08/2021
Violation issued (HPD, closed)
B
07/08/2021
Violation issued (HPD, closed)
C
07/08/2021
Violation issued (HPD, closed)
B
07/08/2021
Violation issued (HPD, closed)
B
07/08/2021
Violation issued (HPD, closed)
C
07/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2021
Permit issued — Plumbing
B00520248-I1-PL
06/22/2021
Permit issued — General Construction
B00519187-I1-GC
06/10/2021
Permit issued — Plumbing
B00520248-I1-PL
05/18/2021
Filed — Alteration
plumbing work including installation of new hot water heaters. 9 new gas meters on 9 new gas meter bars, 9 gas risers, 8 serving existing residential gas ranges from floor 1 thru 4, one riser serving new water heaters and a boiler (filed separately)
B00520248-I1
05/18/2021
Filed — Alteration
B00520262-I1
05/18/2021
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH.
B00519187-I1
04/28/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
C
04/23/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
C
04/23/2021
Violation issued (HPD, closed)
B
04/15/2021
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
B
04/13/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (ECB, closed)
Boilers
04/12/2021
Violation issued (ECB, closed)
Boilers
04/06/2021
Violation issued (HPD, closed)
B
04/06/2021
Violation issued (HPD, closed)
C
04/06/2021
Violation issued (HPD, closed)
B
04/06/2021
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEZ RUNER CONSTRUCTION COR06/15/2022
DOB NOWPlumbingSigned-offEZ RUNER CONSTRUCTION COR04/15/2022
DOB NOWBoiler EquipmentSigned-offBRANCH PLUMBING LLC07/13/2021
DOB NOWPlumbingSigned-offBRANCH PLUMBING LLC07/01/2021
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS06/22/2021
DOB NOWPlumbingSigned-offBRANCH PLUMBING LLC06/10/2021
BISPLISSUEDR E P CONSTRUCTION09/08/1999
BISPLISSUEDR.E.P CONSTRUCTION CORP.06/03/1999
BISBLISSUEDSUNSET PLBG & FIRE PROTECTION08/31/1998
BISPLISSUEDSUNSET PLBG & FIRE PROTECTION08/28/1998
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/19/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/02/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/09/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/07/2021Fire-Resistant Penetrations and JointsPETER SHINODAspecial
09/07/2021Maintenance informationPETER SHINODAenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00520262-I1Request digital key ↗
09/01/2026B00519187-I1Request digital key ↗
09/01/2026B00520248-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00520262-I1Open ↗
09/01/2026B00519187-I1Open ↗
09/01/2026B00520248-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B00520248-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00520248-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00520262-I1Open ↗
09/01/2026B00519187-I1Open ↗
09/01/2026B00520248-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00520262-I1Open ↗
08/13/2026B00520248-I1Open ↗