BuildNYC
Public elementary, junior or senior high
P.S. 120 Queens
58-01 136TH STREET · BIN 4139491
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R4Zoning
91,000 sfGross Floor Area
1Units
LL97 Covered8 Active Violations 0 unresolved · 8 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 64,000 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 120 QueensUnder Construction38p · 1 filing · 20 docs
Floor 3P.S. 120 QueensUnder Construction10p · 1 filing · 20 docs
Floor 2P.S. 120 QueensUnder Construction10p · 1 filing · 20 docs
Floor 1P.S. 120 QueensUnder Construction8p · 1 filing · 20 docs
Site & exteriorP.S. 120 Queens42p · 5 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9707/28/2026
NYC Department of Education403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dseny Engineering Services311/10/2025
NYC School Construction Authority1310/10/2024
360 Engineering502/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority1303/21/2026
Dseny Engineering Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KG Construction ServicesGeneral Contractor1307/28/2026
Roma ScaffoldingScaffold1107/08/2026
R.A.M.S. Mechanicalspecialty_contractor504/09/2026
Forsythe P&HPlumbing407/08/2026
Charan Electrical Enterp'sElectrical303/22/2026
KG Construction ServicesScaffold207/08/2026
Whitestone ConstructionScaffold207/08/2026
Prince ElectricElectrical103/21/2026
H & D ElectricalElectrical103/21/2026
Ally HazratElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4001610/10/2024
Building Lifecycle
All (166)Filed (21)Permit Issued (26)Signed Off (6)Violation (60)Inspection (3)Objection (20)Special Inspection (30)
07/27/2026
Permit issued — General Construction
Q00663185-S1-GC
07/06/2026
Permit issued — Plumbing
Q00663185-S3-PL
03/17/2026
Violation issued (ECB, open)
Construction
03/17/2026
Violation issued (ECB, open)
Construction
03/17/2026
Violation issued (ECB, open)
Construction
03/17/2026
Violation issued (ECB, open)
Construction
03/03/2026
Permit issued — Mechanical Systems
Q00663185-I1-MS
02/24/2026
Signed off — Alteration
SH/PS120Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW 127536 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00554285-I1
02/10/2026
Violation issued (FDNY_NOV, closed)
01/06/2026
Violation issued (FDNY_NOV, closed)
11/24/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/13/2025
Violation issued (FDNY_ORDER, closed)
11/13/2025
Violation issued (FDNY_ORDER, closed)
11/13/2025
Violation issued (FDNY_ORDER, closed)
11/10/2025
Filed — Alteration
SH/PS120Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW 127536 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00554285-P2
11/10/2025
Special inspection requirement — Post-installed Anchors
10/28/2025
Signed off — Alteration
Q00554290-I1
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
09/18/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Violation issued (FDNY_ORDER, closed)
09/04/2025
Violation issued (FDNY_ORDER, closed)
08/04/2025
Permit issued — Plumbing
Q00663185-S3-PL
07/21/2025
Permit issued — General Construction
Q00663185-S1-GC
07/08/2025
Violation issued (FDNY_NOV, closed)
06/20/2025
Signed off — Alteration
Installation of construction fence for public protection from areas of work & exposure, in conjunction w/ Job#: Q00663185, 421901071
Q00791349-S3
06/18/2025
Signed off — Alteration
Installation of construction fence for public protection from areas of work & exposure, in conjunction w/ Job#: Q00663185, 421901071
Q00791349-I1
06/17/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/04/2025
Permit issued — Support of Excavation
Q00791349-S3-SE
03/04/2025
Violation issued (FDNY_NOV, closed)
01/18/2025
Violation issued (FDNY_NOV, closed)
12/11/2024
Permit issued — Mechanical Systems
Q00663185-I1-MS
10/10/2024
Filed — Alteration
PROVIDE NEW STRUCTURAL STEEL DUNNAGE FOR NEW HVAC ROOFTOP UNITS.
Q00663185-A4
10/09/2024
Signed off — Alteration
Q08014290-I1
10/09/2024
Signed off — Alteration
Installation of sidewalk shed for public protection during construction work, in conjunction with DOB#: Q00663185, 421901071
Q08014325-I1
09/03/2024
Permit issued — Plumbing
Q00663185-S3-PL
07/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/08/2024
Permit issued — Structural
Q00663185-S2-ST
07/08/2024
Permit issued — General Construction
Q00663185-S1-GC
05/02/2024
Permit issued — Support of Excavation
Q00791349-S3-SE
04/15/2024
Filed — Alteration
PROVIDE NEW STRUCTURAL STEEL DUNNAGE FOR NEW HVAC ROOFTOP UNITS.
Q00663185-A3
04/15/2024
Violation issued (FDNY_NOV, closed)
04/15/2024
Violation issued (FDNY_NOV, closed)
03/04/2024
Violation issued (FDNY_NOV, closed)
03/04/2024
Violation issued (FDNY_NOV, closed)
03/04/2024
Violation issued (FDNY_NOV, closed)
01/22/2024
Permit issued — Supported Scaffold
Q08014290-I1-SF
12/18/2023
Permit issued — Supported Scaffold
Q08014290-I1-SF
11/03/2023
Permit issued — Sidewalk Shed
Q08014325-I1-SH
10/24/2023
Permit issued — Construction Fence
Q00791349-I1-FN
10/02/2023
Permit issued — Mechanical Systems
Q00663185-I1-MS
09/29/2023
Permit issued — Plumbing
Q00663185-S3-PL
07/12/2023
Permit issued — Structural
Q00663185-S2-ST
07/12/2023
Permit issued — General Construction
Q00663185-S1-GC
07/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/11/2023
Special inspection requirement — Final
NELSON LOPEZ
07/11/2023
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKG Construction Services07/27/2026
DOB NOWPlumbingPermit IssuedForsythe P&H07/06/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical03/03/2026
DOB NOWPlumbingPermit IssuedForsythe P&H08/04/2025
DOB NOWGeneral ConstructionPermit IssuedStalco07/21/2025
DOB NOWSupport of ExcavationSigned-offStalco04/04/2025
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical12/11/2024
DOB NOWPlumbingPermit IssuedVoltaic Solaire09/03/2024
DOB NOWStructuralSigned-offStalco07/08/2024
DOB NOWGeneral ConstructionPermit IssuedStalco07/08/2024
DOB NOWSupport of ExcavationSigned-offStalco05/02/2024
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding01/22/2024
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding12/18/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding11/03/2023
DOB NOWConstruction FenceSigned-offStalco10/24/2023
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical10/02/2023
DOB NOWPlumbingPermit IssuedForsythe P&H09/29/2023
DOB NOWStructuralSigned-offStalco07/12/2023
DOB NOWGeneral ConstructionPermit IssuedStalco07/12/2023
DOB NOWSupport of ExcavationSigned-offStalco05/08/2023
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding12/29/2022
DOB NOWSupport of ExcavationSigned-offStalco12/08/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding11/16/2022
DOB NOWConstruction FenceSigned-offStalco10/28/2022
DOB NOWSupported ScaffoldSigned-offWhitestone Construction07/22/2022
DOB NOWSidewalk ShedSigned-offWhitestone Construction10/18/2021
BISOTISSUEDKG Construction Services03/02/2026
BISOTISSUEDKG Construction Services03/02/2026
BISOTISSUEDKG Construction Services03/02/2026
BISPLISSUEDForsythe P&H02/24/2025
BISOTISSUEDKG Construction Services02/21/2025
BISOTISSUEDKG Construction Services02/21/2025
BISOTISSUEDKG Construction Services02/21/2025
BISOTISSUEDKG Construction Services02/22/2024
BISOTISSUEDKG Construction Services02/22/2024
BISOTISSUEDKG Construction Services02/22/2024
BISPLISSUEDForsythe P&H02/06/2024
BISOTISSUEDKG Construction Services02/24/2023
BISOTISSUEDKG Construction Services02/24/2023
BISOTISSUEDKG Construction Services02/24/2023
+ 36 more permits on file
1 project · most recent 10/10/2024
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2024Permit IssuedKG Construction ServicesAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Mitsubishi Electric PKA-A24K48 24,000 BTU · Heat Pump Outdoor ×1
PUZ-A24NHA7 24,000 BTU · Heat Pump Outdoor ×1
Greenheck RVE-85-52-15H-20D-J 8,000 CFM · Ahu ×10
Heat / Cool
Greenheck RVE-85-8D-20I-J-G1 7,800 CFM · Fan Coil Indoor ×5
Heating
Greenheck RV-75-T 13,000 CFM · Fan Coil Indoor ×2
RV-45-M-E1 4,000 CFM ×1
RV-75 13,000 CFM · Exhaust Fan ×6
Ventilation
Greenheck RVE-85-58D-20I-J-G1 7,800 CFM · Ahu ×4
RV-75-T 13,000 CFM · Ahu ×2
RV-45-M-E1 4,000 CFM · Ahu ×1
RVE-85-58D-201-J-G1 7,800 CFM · Ahu ×1
USF-06-3-B5 120 CFM · Kitchen Exhaust ×2
USF-20-3-B1 5,000 CFM · Kitchen Exhaust ×2
Pennbarry IND-0561 C15A10 120 CFM · Kitchen Exhaust ×1
USF-06-3-B5D20FT 5,000 CFM · Kitchen Exhaust ×1
Refrigeration
Mitsubishi Electric PUZ-A24NHA-BS 24,000 BTU · Split System ×2
1 project · most recent 10/10/2024
Gas
FiledStatusContractorScope
10/10/2024Permit IssuedForsythe P&HGas
16 projects · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025CompleteCharan Electrical Enterp's—
04/08/2025CompleteRodel Electrical ContractorsGeneral Wiring
04/15/2024CompleteWilldan Electrical of NYGeneral Wiring
12/11/2023CompleteRodel Electrical ContractorsGeneral Wiring
09/06/2023CompleteCharan Electrical Enterp'sGeneral Wiring
06/06/2023CompleteGemini Electric Co—
04/17/2023CompleteCharan Electrical Enterp's—
11/16/2022CompleteCharan Electrical Enterp's—
11/15/2022CompleteStanco System Electrical Cont—
11/04/2022CompleteStanco System Electrical Cont—
02/28/2022CompleteCharan Electrical Enterp's—
12/22/2021CompleteCharan Electrical Enterp's—
10/08/2021CompleteStanco System Electrical Cont—
06/16/2021CompleteSamco Electric—
11/04/2020CompleteCharan Electrical Enterp'sGeneral Wiring
1 project · most recent 10/10/2024
Steel
FiledStatusContractorScope
10/10/2024Permit IssuedKG Construction ServicesSteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/17/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
11/24/2025Post-installed AnchorsNELSON LOPEZspecial
11/10/2025Post-installed Anchors—special
07/11/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/11/2023FinalNELSON LOPEZprogress
07/11/2023Post-installed AnchorsNELSON LOPEZspecial
07/11/2023Structural Steel - High Strength BoltingNELSON LOPEZspecial
07/11/2023Concrete - Cast-In-PlaceNELSON LOPEZspecial
07/11/2023Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
07/11/2023Structural Steel - WeldingNELSON LOPEZspecial
07/11/2023Structural Steel - DetailsNELSON LOPEZspecial
07/06/2023Concrete - Cast-In-PlaceNELSON LOPEZspecial
07/06/2023Structural Steel - DetailsNELSON LOPEZspecial
07/06/2023Structural Steel - High Strength BoltingNELSON LOPEZspecial
07/06/2023Structural Steel - WeldingNELSON LOPEZspecial
07/06/2023FinalNELSON LOPEZprogress
07/06/2023Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
03/22/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/22/2023Post-installed AnchorsNELSON LOPEZspecial
10/12/2022HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
10/12/2022HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
10/12/2022Shutoff dampersNELSON LOPEZenergy_progress
10/12/2022Maintenance informationNELSON LOPEZenergy_progress
10/12/2022HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
10/12/2022Structural Steel - Details—special
10/12/2022Structural Steel - Welding—special
Latest 25 of 36.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 120 QueensEducationEntire building
Project Q08014325 Alteration · LOC Issued · 10/04/2022
Project Q00791349 Alteration · LOC Issued · 08/12/2022
Project Q00663185 Alteration · Permit Entire · 01/20/2022
Project Q00554285 Alteration · LOC Issued · 09/03/2021
Project Q00554290 Alteration · LOC Issued · 09/03/2021
Project Q08014290 Alteration · LOC Issued · 10/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/27/2026Q00554290-I1Request digital key ↗
08/26/2026Q00791349-S3Request digital key ↗
08/25/2026Q08014290-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
10/25/2007410013756Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/26/2026Q00791349-I1Open ↗
08/26/2026Q00791349-S3Open ↗
08/25/2026Q08014325-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/09/2026Q00663185-P8Open ↗
10/05/2026Q00663185-S2Open ↗
09/01/2026Q00663185-A2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
10/05/2026Q00663185-S2Open ↗
09/01/2026Q00663185-A2Open ↗
▸BISPC FULL REPORT1
10/10/2007410013756Open ↗
▸Safety & Tenant Protection7
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/13/2026Q08014290-I1Open ↗
08/13/2026Q00554285-P2Open ↗
08/13/2026Q08014325-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026Q00663185-I1Open ↗
08/25/2026Q00663185-A1Open ↗
08/25/2026Q00663185-P8Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/10/2007410013756Open ↗
▸Approvals, Objections & Sign-offs46
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/26/2026Q00791349-S3Open ↗
08/14/2026Q00791349-I1Open ↗
08/13/2026Q00554285-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)21
08/13/2026Q00663185-S2Open ↗
08/13/2026Q00554290-I1Open ↗
08/13/2026Q00554285-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026Q00554285-I1Open ↗
08/13/2026Q00791349-I1Open ↗
08/13/2026Q00791349-S3Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/10/2007410013756Open ↗
▸Other Documents25
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal21
08/13/2026Q00663185-P8Open ↗
08/13/2026Q00663185-I1Open ↗
08/13/2026Q00663185-S1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/13/2026Q00554285-I1Open ↗
08/13/2026Q00791349-S3Open ↗
08/13/2026Q00791349-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00791349-S3Open ↗