← Back
BuildNYC
Church, synagogue, chapel
58-02 ROOSEVELT AVENUE
QUEENS · Woodside · BIN 4031209
💬 Discuss this project
1926Year Built
1Stories
M1Building Class
R5BZoning
18,990 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · 23,497 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Site & exterior8 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset2507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction508/27/2024
Rigid Structural Design303/29/2024
Zaskorski & Associates Architects101/03/2024
Ashraf306/16/2022
Cataldo Properties104/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design603/21/2026
Municipal Building Consultants103/21/2026
Lewsan Consulting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystems Installation S&SScaffold807/08/2026
WA-WA ConstructionGeneral Contractor707/08/2026
Intersystem InstallationScaffold507/08/2026
Jepol ConstructionScaffold403/21/2026
Willdan Electrical of NYElectrical203/22/2026
Craine Air Conditioningspecialty_contractor203/21/2026
WA-WA ConstructionScaffold207/08/2026
F1 MechanicalPlumbing107/08/2026
Jepol ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355105/08/2024
C.M. Testing Laboratory1352101/03/2024
Zaskorski & Associates AR6121101/03/2024
Building Lifecycle
All (75)Filed (13)Permit Issued (10)Signed Off (9)Violation (10)Inspection (1)Objection (5)Special Inspection (10)
05/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/12/2025
Signed off — Alteration
Facade and roof repairs as per plans filed herewith. no change to use, egress or occupancy.
Q00982858-I1
07/15/2025
Signed off — Alteration
Q01026454-I1
05/05/2025
Signed off — Alteration
Q01015059-I1
05/02/2025
Signed off — Alteration
Q01015190-I1
05/01/2025
Permit renewed — General Construction
Renewed without changes
Q00982858-I1-GC
03/12/2025
Boiler inspection report filed
Initial · no defects · Accepted
03/07/2025
Permit renewed — Supported Scaffold
Renewed without changes
Q01015190-I1-SF
03/04/2025
Permit renewed — Sidewalk Shed
Renewed with changes
Q01015059-I1-SH
11/25/2024
Permit renewed — Protection and Mechanical Methods
Renewed without changes
Q01026454-I1-PMM
11/22/2024
Permit renewed — General Construction
Renewed without changes
Q00982858-I1-GC
09/24/2024
Signed off — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-S1
08/27/2024
Filed — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-P3
08/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
08/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2024
Filed — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-P2
07/23/2024
Signed off — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-I1
05/22/2024
Filed — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-P1
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/15/2024
Permit issued — Mechanical Systems
Q01043081-I1-MS
05/15/2024
Permit issued — General Construction
Q00982858-I1-GC
05/15/2024
Permit issued — Plumbing
Q01043081-S1-PL
05/09/2024
Filed — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-S1
05/08/2024
Filed — Alteration
GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT
Q01043081-I1
05/08/2024
Boiler inspection report filed
Initial · defects found · Accepted
03/29/2024
Filed — Alteration
Q01026454-I1
03/29/2024
Permit issued — Protection and Mechanical Methods
Q01026454-I1-PMM
03/21/2024
Filed — Alteration
Q01015190-I1
03/21/2024
Permit issued — Supported Scaffold
Q01015190-I1-SF
03/07/2024
Filed — Alteration
Q01015059-I1
03/07/2024
Permit issued — Sidewalk Shed
Q01015059-I1-SH
01/17/2024
Objection resolved — Addressed
01/12/2024
Objection raised — Scope
01/12/2024
Objection raised — Inspections
01/12/2024
Objection raised — Other
01/12/2024
Objection raised — Energy
01/03/2024
Filed — Alteration
Facade and roof repairs as per plans filed herewith. no change to use, egress or occupancy.
Q00982858-I1
12/28/2023
Special inspection requirement — Insulation placement and R values
CARLO ZASKORSKI
12/28/2023
Special inspection requirement — Air barrier - visual inspection
CARLO ZASKORSKI
12/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
12/27/2023
Special inspection requirement — Final
CARLO ZASKORSKI
12/27/2023
Special inspection requirement — Masonry
CARLO ZASKORSKI
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
CARLO ZASKORSKI
12/27/2023
Special inspection requirement — Preliminary
CARLO ZASKORSKI
10/02/2023
Boiler inspection report filed
Initial · no defects · Accepted
06/30/2023
Permit expired, never signed off — Protection and Mechanical Methods
The city's record still shows this permit as issued, with no sign-off on its filing
Q00758656-I1-PM
02/21/2023
Signed off — Alteration
Q00725760-I1
12/23/2022
Signed off — Alteration
Installation of temporary supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00735405-I1
12/23/2022
Signed off — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00735382-I1
09/28/2022
Permit renewed — Sidewalk Shed
Renewed without changes
Q00735382-I1-SH
06/30/2022
Permit renewed — Protection and Mechanical Methods
Renewed without changes
Q00758656-I1-PM
06/30/2022
Permit issued — General Construction
Q00725760-I1-GC
06/17/2022
Permit issued — Protection and Mechanical Methods
Q00758656-I1-PM
06/16/2022
Filed — Alteration
Installation of temporarily material hoist as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00758656-I1
05/11/2022
Permit issued — Supported Scaffold
Q00735405-I1-SF
05/11/2022
Permit issued — Sidewalk Shed
Q00735382-I1-SH
05/10/2022
Filed — Alteration
Installation of temporary supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00735405-I1
05/10/2022
Filed — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00735382-I1
05/06/2022
Boiler inspection report filed
Initial · no defects · Accepted
04/26/2022
Filed — Alteration
Q00725760-I1
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—WA-WA Construction—
DOB NOW—Intersystems Installation S&S—
DOB NOW—Intersystems Installation S&S—
DOB NOW—WA-WA Construction—
DOB NOW—WA-WA Construction—
DOB NOW—Craine Air Conditioning I—
DOB NOW—WA-WA Construction—
DOB NOW—F1 Mechanical—
DOB NOW—WA-WA Construction—
DOB NOW—Intersystems Installation S&S—
DOB NOW—Intersystems Installation S&S—
DOB NOW—Intersystem Installation—
DOB NOW—Hudson Meridian Construction GP—
DOB NOW—Hudson Meridian Construction GP—
DOB NOW—Hudson Meridian Construction GP—
DOB NOW—Intersystem Installation—
DOB NOW—Intersystem Installation—
BIS—Craine Air Conditioning—
BIS—Craine Air Conditioning—
BIS—Craine Air Cond—
BIS—Craine Air Conditioning—
BIS—Craine Air Conditioning—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026Q00725760-I1Request the plans ↗
08/26/2026Q00735405-I1Request the plans ↗
08/26/2026Q00735382-I1Request the plans ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026Q00735382-I1Open ↗
08/23/2026Q00982858-I1Open ↗
08/23/2026Q01015059-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026Q00725760-I1Open ↗
09/01/2026Q00982858-I1Open ↗
09/01/2026Q00982858-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00982858-I1Open ↗
09/01/2026Q00982858-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/23/2026Q00982858-I1Open ↗
08/13/2026Q01043081-S1Open ↗
08/13/2026Q00725760-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/22/2026Q01043081-P2Open ↗
08/22/2026Q01043081-S1Open ↗
08/22/2026Q01043081-P1Open ↗
Showing 3 of 12 on file for this type