3 Active Violations 2 unresolved · 1 paperwork only▸
ECB02/28/2025Failure to maintain. Noted: observed a 2 story building that has a construction fence surrounding the front yard which is in not maintained in code-compliant manner. There is a pipe sticking out of left side co$6K due
HPD06/19/2017§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
ECB12/29/2016Planting requirements insufficient planting at side yard with street frontage as required for corner lot.Nothing owed — awaiting certificate of correction
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
New Ho Xin Development
General Contractor
1
10/23/2012
Building Lifecycle
06/19/2017
§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND…
HPD violation · open
12/29/2016
Planting requirements insufficient planting at side yard with street frontage as required for corner lot.
ECB violation · open
09/14/2012
Work w/o a permit. Work noted: at rear vestibule in place w/door & window provided approx 4 feet x 6 feet x 7 feet high w/roof & partially covering…
ECB violation · closed
09/14/2012
Illegal use in residential district. At exposure 4 side yard - dead storage 1 motor vehicle 2 door sedan mitsubishi eclipse gsx w/no visible plates…
ECB violation · closed
09/14/2012
Failure to maintain building in code compliant manner. At exposure 4 side portion of exterior vinyl siding missing on the upper portion evident…