← Back
Two family frame
58-12 57 DRIVE
QUEENS · BIN 4059880
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
M1-1DZoning
1,637 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,100 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
1 job · most recent 09/04/2025
Wood
FiledStatusContractorScope
09/04/2025Permit IssuedAHTRAM SERVICES CORPWood
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Violation (2)Special Inspection (3)
09/08/2025
Permit issued — General Construction
Q01271022-I1-GC-CX
09/04/2025
Filed — Alteration
Hereby filing for the replacement of structural elements supporting the attic stucture. Replace entire roof structure supporting the attic, replace existing floor joists of the attic, retrofit end wall trusses. No change to use occupancy or egress.
Q01271022-I1
08/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
bassam (sam) rimawi
08/13/2025
Special inspection requirement — Final
bassam (sam) rimawi
08/13/2025
Special inspection requirement — Structural Wood Frame
bassam (sam) rimawi
07/02/1999
Violation issued (ECB, closed)
Quality of Life
07/02/1999
Violation issued (ECB, closed)
Quality of Life
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSS ENGINEERS109/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AHTRAM SERVICES CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492109/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAHTRAM SERVICES CORP09/08/2025
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/13/2025Structural Stability – Alterations of existing buildingsbassam (sam) rimawispecial
08/13/2025Finalbassam (sam) rimawiprogress
08/13/2025Structural Wood Framebassam (sam) rimawiprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01271022-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01271022-I1Open ↗
08/29/2026Q01271022-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01271022-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q01271022-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01271022-I1Open ↗