← Back
Cape Cod
58-14 OCEANIA STREET
QUEENS · Bayside · BIN 4160617
💬 Discuss this project
1955Year Built
1.67Stories
A0Building Class
R2AZoning
1,072 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Cape Cod · 4,000 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Roof7p · 1 filing · 20 docs
Floor 29p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2023$850K—— → —$793/sf building
09/19/2023$750K—JOSEPH T. SENKO TRUST → Private party$700/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.408/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor404/09/2026
P.S.I. MECHANICALPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129308/29/2024
TRIANGLE INSPECTION & TES7495208/29/2024
Building Lifecycle
All (48)Filed (4)Permit Issued (6)Signed Off (3)Inspection (7)Special Inspection (28)
08/20/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-S2
08/20/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-S1
07/11/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-S3
07/09/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2025
Permit issued — Curb Cut
Q00982071-S3-CC
06/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/23/2025
Permit issued — Plumbing
Q00982071-S2-PL
09/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
08/30/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
08/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
08/30/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
08/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
08/29/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-P3
08/28/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
08/28/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/03/2024
Permit issued — Plumbing
Q00982071-S2-PL
05/09/2024
Permit issued — Foundation
Q00982071-S1-FO-EA
05/09/2024
Permit issued — Earth Work
Q00982071-S1-ST
05/09/2024
Permit issued — Structural
Q00982071-S1-GC
04/25/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-S2
04/25/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-S3
04/24/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00982071-S1
04/24/2024
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
04/24/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/24/2024
Special inspection requirement — Masonry
MEHDI GHAZI
04/24/2024
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
04/24/2024
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
04/24/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
04/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
04/24/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
04/24/2024
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/24/2024
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
04/24/2024
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
04/23/2024
Special inspection requirement — Final
MEHDI GHAZI
04/23/2024
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPRIMROSE SERVICE INC06/17/2025
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL01/23/2025
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL07/03/2024
DOB NOWFoundationSigned-offPRIMROSE SERVICE INC05/09/2024
DOB NOWEarth WorkSigned-offPRIMROSE SERVICE INC05/09/2024
DOB NOWStructuralSigned-offPRIMROSE SERVICE INC05/09/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/09/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/06/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/30/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
08/30/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
08/30/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
08/30/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/30/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
08/30/2024HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
08/28/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
08/28/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/28/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/28/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
08/28/2024HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
08/28/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
08/28/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/24/2024Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
04/24/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/24/2024MasonryMEHDI GHAZIspecial
04/24/2024Structural Steel - DetailsMEHDI GHAZIspecial
04/24/2024Concrete - Cast-In-PlaceMEHDI GHAZIspecial
04/24/2024Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
04/24/2024Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
04/24/2024Structural Steel - High Strength BoltingMEHDI GHAZIspecial
04/24/2024Structural Steel - WeldingMEHDI GHAZIspecial
04/24/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/24/2024Structural Wood FrameMEHDI GHAZIprogress
Latest 25 of 28.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026Q00982071-P5Request digital key ↗
08/22/2026Q00982071-P3Request digital key ↗
08/22/2026Q00982071-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/22/2026Q00982071-I1Open ↗
08/22/2026Q00982071-P5Open ↗
08/13/2026Q00982071-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/22/2026Q00982071-I1Open ↗
08/22/2026Q00982071-P5Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026Q00982071-P5Open ↗
08/22/2026Q00982071-S2Open ↗
08/22/2026Q00982071-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/22/2026Q00982071-P5Open ↗
08/22/2026Q00982071-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00982071-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026Q00982071-P5Open ↗
08/22/2026Q00982071-S2Open ↗
08/22/2026Q00982071-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/22/2026Q00982071-I1Open ↗
08/22/2026Q00982071-P5Open ↗
08/13/2026Q00982071-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00982071-S1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/22/2026Q00982071-I1Open ↗
08/22/2026Q00982071-P5Open ↗
08/13/2026Q00982071-S1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026Q00982071-P5Open ↗
08/22/2026Q00982071-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026Q00982071-I1Open ↗
08/22/2026Q00982071-P5Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00982071-S1Open ↗
▸DOB NOWFinal Survey1
08/22/2026Q00982071-I1Open ↗