← Back
Two family converted from one family
58-15 83 PLACE
QUEENS · BIN 4066340
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R4-1Zoning
2,299 sfGross Floor Area
2Units
Two family converted from one family · 6,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Floor 214p · 2 filings · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar14p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC702/26/2025
NORMAN C. LOK, PE108/28/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK CONSTRUCTION MA*General Contractor407/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330602/26/2025
TRIANGLE INSPECTION & TES7495206/11/2024
Building Lifecycle
All (79)Filed (8)Permit Issued (3)Signed Off (3)Inspection (7)Objection (28)Special Inspection (30)
11/07/2025
Signed off — Alteration CO
CONVERT & ENLARGE EXISTING ONE FAMILY INTO TWO FAMILY DWELLING UNITS.
Q00940902-I1
07/02/2025
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE ONLY.
Q00947814-I1
07/02/2025
Signed off — Alteration
Q00947823-I1
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
03/20/2025
Special inspection requirement — Electric vehicle service equipment requirements
Jinfar Liu
03/20/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
03/20/2025
Special inspection requirement — Structural Wood Frame
Jinfar Liu
03/20/2025
Special inspection requirement — Insulation placement and R values
Jinfar Liu
03/20/2025
Special inspection requirement — Air barrier - visual inspection
Jinfar Liu
03/20/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
03/20/2025
Special inspection requirement — Structural Steel - Details
Jinfar Liu
03/20/2025
Special inspection requirement — Final
Jinfar Liu
03/20/2025
Special inspection requirement — Fenestration areas
Jinfar Liu
03/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
03/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
Jinfar Liu
03/20/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
03/20/2025
Special inspection requirement — Heating Systems
Jinfar Liu
03/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/20/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
03/20/2025
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
03/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
03/20/2025
Special inspection requirement — Chimneys and vents
Jinfar Liu
03/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
03/20/2025
Special inspection requirement — Footing and Foundation
Jinfar Liu
03/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
03/20/2025
Special inspection requirement — Fenestration air leakage
Jinfar Liu
03/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
03/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jinfar Liu
03/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
03/20/2025
Special inspection requirement — Air barrier — testing
Jinfar Liu
03/20/2025
Special inspection requirement — Protection of exposed foundation insulation
Jinfar Liu
03/20/2025
Special inspection requirement — Maintenance information
Jinfar Liu
02/26/2025
Filed — Alteration CO
CONVERT & ENLARGE EXISTING ONE FAMILY INTO TWO FAMILY DWELLING UNITS.
Q00940902-P4
01/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/06/2024
Filed — Alteration CO
CONVERT & ENLARGE EXISTING ONE FAMILY INTO TWO FAMILY DWELLING UNITS.
Q00940902-P3
10/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2024
Filed — Alteration
Q00947823-P1
05/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Permit issued — Plumbing
Q00947823-I1-PL
12/13/2023
Permit issued — Foundation
Q00940902-I1-GC-CX
11/22/2023
Permit issued — Construction Fence
Q00947814-I1-FN
11/21/2023
Filed — Alteration CO
CONVERT & ENLARGE EXISTING ONE FAMILY INTO TWO FAMILY DWELLING UNITS.
Q00940902-P1
11/14/2023
Objection resolved — Addressed
11/03/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/24/2023
Objection raised — Structural
10/24/2023
Objection raised — Structural
10/24/2023
Objection raised — Scope
10/24/2023
Objection raised — Admin
10/24/2023
Objection raised — Structural
10/24/2023
Objection raised — Admin
10/14/2023
Filed — Alteration
Q00947823-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP01/22/2024
DOB NOWFoundationPermit IssuedNEW YORK CONSTRUCTION MA*12/13/2023
DOB NOWConstruction FenceSigned-offNEW YORK CONSTRUCTION MA*11/22/2023
BIS—ISSUEDA. RANDAZZO AND SONS INC10/12/2001
1 job · most recent 02/26/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2025Permit IssuedNEW YORK CONSTRUCTION MA*Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSY-GL18NA-U1 18,000 BTU · Split System ×24
Heating
Williamson GWA-105 105,000 BTU · Boiler ×8
1 job · most recent 11/14/2024
General Wiring
FiledStatusContractorScope
11/14/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
2 jobs · most recent 02/26/2025
Wood Steel
FiledStatusContractorScope
02/26/2025Permit IssuedNEW YORK CONSTRUCTION MA*Steel, Wood
08/28/2023——Wood
1 job · most recent 02/26/2025
Earthwork
FiledStatusContractorScope
02/26/2025Permit IssuedNEW YORK CONSTRUCTION MA*Earthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 135
DateRequirementInspectorRole
03/20/2025Fenestration areasJinfar Liuenergy_progress
03/20/2025MeteringJinfar Liuenergy_progress
03/20/2025Maintenance informationJinfar Liuenergy_progress
03/20/2025Electric vehicle service equipment requirementsJinfar Liuenergy_progress
03/20/2025Air barrier - visual inspectionJinfar Liuenergy_progress
03/20/2025Interior lighting powerJinfar Liuenergy_progress
03/20/2025Protection of exposed foundation insulationJinfar Liuenergy_progress
03/20/2025Duct leakage testing, insulation and designJinfar Liuenergy_progress
03/20/2025Air barrier — testing Jinfar Liuenergy_progress
03/20/2025HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
03/20/2025Insulation placement and R valuesJinfar Liuenergy_progress
03/20/2025HVAC-R and service water heating equipmentJinfar Liuenergy_progress
03/20/2025Fenestration and door U-factor and product ratingsJinfar Liuenergy_progress
03/20/2025HVAC-R and service water heating system controlsJinfar Liuenergy_progress
03/20/2025Fenestration air leakageJinfar Liuenergy_progress
03/20/2025Fire-Resistance Rated ConstructionJinfar Liuprogress
03/20/2025Energy Code Compliance InspectionsJinfar Liuprogress
03/20/2025Structural Wood FrameJinfar Liuprogress
03/20/2025FinalJinfar Liuprogress
03/20/2025Footing and FoundationJinfar Liuprogress
03/20/2025Concrete - Cast-In-PlaceJinfar Liuspecial
03/20/2025Structural Steel - DetailsJinfar Liuspecial
03/20/2025Chimneys and ventsJinfar Liuspecial
03/20/2025Structural Stability – Alterations of existing buildingsJinfar Liuspecial
03/20/2025Structural Steel - High Strength BoltingJinfar Liuspecial
Latest 25 of 135.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00947823-I1Request digital key ↗
08/24/2026Q00947823-P1Request digital key ↗
08/24/2026Q00947814-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00940902-P1Open ↗
08/13/2026Q00925987-I1Open ↗
08/13/2026Q00940902-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00940902-P3Open ↗
08/13/2026Q00940902-P1Open ↗
08/13/2026Q00940902-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00940902-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026Q00940902-P4Open ↗
09/23/2026Q00940902-P4Open ↗
09/23/2026Q00940902-P4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026Q00940902-P4Open ↗
09/23/2026Q00940902-P4Open ↗
09/23/2026Q00940902-P4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00947823-P1Open ↗
08/24/2026Q00947823-I1Open ↗
08/24/2026Q00947814-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00940902-P3Open ↗
08/13/2026Q00940902-P1Open ↗
08/13/2026Q00940902-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00947823-P1Open ↗
08/24/2026Q00947823-I1Open ↗
08/13/2026Q00940902-P3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026Q00940902-P1Open ↗
08/13/2026Q00940902-P4Open ↗
08/13/2026Q00940902-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00940902-I1Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/13/2026Q00940902-P1Open ↗
08/13/2026Q00940902-P3Open ↗
08/13/2026Q00940902-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/13/2026Q00940902-I1Open ↗
08/13/2026Q00940902-P3Open ↗
08/13/2026Q00940902-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00940902-P3Open ↗
08/13/2026Q00940902-P4Open ↗
08/13/2026Q00940902-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00940902-P1Open ↗
08/13/2026Q00940902-P4Open ↗
08/13/2026Q00940902-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00940902-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00940902-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00940902-I1Open ↗