58-25 CATALPA AVENUE
QUEENS · Ridgewood · BIN 4437724
💬 Discuss this project
1925Year Built
3Stories
M1Building Class
R6BZoning
59,100 sfGross Floor Area
0Units
LL97 Covered
Church, synagogue, chapel · 50,200 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 3Temporary heavy duty sidewalk shed and pipe scaffold install8p · 1 filing · 3 docs
Floor 2Temporary heavy duty sidewalk shed and pipe scaffold install8p · 1 filing · 3 docs
Floor 1Temporary heavy duty sidewalk shed and pipe scaffold install13p · 2 filings · 11 docs
CellarMechanical ConstructionUnder Construction3p · 2 filings · 11 docs
Sub-Basement1 filing · 3 docs
Site & exteriorTemporary heavy duty sidewalk shed and pipe scaffold install8p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Andrew Robert Levenbaum P.E410/02/2026
Nelson and Pope108/11/2026
Royal T&E106/11/2019
Building Lifecycle
All (7)Filed (6)Signed Off (1)
10/02/2026
Filed — No Work
Q01299795-I1
08/11/2026
Filed — Alteration
Modification to HVAC system as per plans filed herewith.
Q01411354-I1
04/14/2026
Filed — No Work
Q01259649-P3
09/10/2025
Filed — No Work
Q01259649-P2
07/23/2025
Filed — No Work
Q01259649-I1
11/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00178563-I1
06/11/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00178563-I1
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/03/2026Mechanical Systems—special
06/03/2026Final—progress
01/08/2026Public Assembly Emergency LightingAndrew Levenbaumprogress
10/08/2025Public Assembly Emergency LightingAndrew Levenbaumprogress
09/05/2025Public Assembly Emergency LightingAndrew Levenbaumprogress
Nothing on file for this building.