← Back
BuildNYC
Church, synagogue, chapel
58-25 CATALPA AVENUE
QUEENS · Ridgewood · BIN 4437724
💬 Discuss this project
1925Year Built
3Stories
M1Building Class
R6BZoning
59,100 sfGross Floor Area
0Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Church, synagogue, chapel · 50,200 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 3Temporary heavy duty sidewalk shed and pipe scaffold install8p · 1 filing · 3 docs
Floor 2Temporary heavy duty sidewalk shed and pipe scaffold install8p · 1 filing · 3 docs
Floor 1Temporary heavy duty sidewalk shed and pipe scaffold install13p · 2 filings · 11 docs
CellarMechanical ConstructionUnder Construction3p · 2 filings · 11 docs
Sub-Basement1 filing · 3 docs
Site & exteriorTemporary heavy duty sidewalk shed and pipe scaffold install8p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset410/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Andrew Robert Levenbaum P.E410/02/2026
Nelson and Pope108/11/2026
Royal T&E106/11/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold207/08/2026
Cambridge HVACspecialty_contractor110/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. Testing Laboratory1352108/11/2026
Building Lifecycle
All (24)Filed (6)Permit Issued (3)Signed Off (1)Violation (1)Objection (8)Special Inspection (5)
10/02/2026
Filed — No Work
Q01299795-I1
10/01/2026
Permit issued — Mechanical Systems
Q01411354-I1-MS
09/01/2026
Objection resolved — Addressed
08/25/2026
Objection raised — Other
08/11/2026
Filed — Alteration
Modification to HVAC system as per plans filed herewith.
Q01411354-I1
06/03/2026
Special inspection requirement — Mechanical Systems
06/03/2026
Special inspection requirement — Final
04/14/2026
Filed — No Work
Q01259649-P3
01/08/2026
Special inspection requirement — Public Assembly Emergency Lighting
Andrew Levenbaum
10/08/2025
Special inspection requirement — Public Assembly Emergency Lighting
Andrew Levenbaum
09/10/2025
Filed — No Work
Q01259649-P2
09/05/2025
Special inspection requirement — Public Assembly Emergency Lighting
Andrew Levenbaum
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Scope
08/12/2025
Objection raised — Inspections
08/12/2025
Objection raised — Inspections
07/23/2025
Filed — No Work
Q01259649-I1
11/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00178563-I1
06/13/2019
Permit issued — Supported Scaffold
Q00178563-I1-SF
06/13/2019
Permit issued — Sidewalk Shed
Q00178563-I1-SH
06/11/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00178563-I1
08/29/2001
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCambridge HVAC10/01/2026
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR06/13/2019
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR06/13/2019
BISFSISSUEDManhattan Boiler & Equipment08/13/1999
3 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026CompleteDenmar ElectricGeneral Wiring
03/12/2026Permit IssuedGemini Electric CoGeneral Wiring
06/11/2019CompleteElpo Electrical Contg—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/03/2026Mechanical Systems—special
06/03/2026Final—progress
01/08/2026Public Assembly Emergency LightingAndrew Levenbaumprogress
10/08/2025Public Assembly Emergency LightingAndrew Levenbaumprogress
09/05/2025Public Assembly Emergency LightingAndrew Levenbaumprogress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Place of Assembly4
10/04/2026Q01299795-I1Request digital key ↗
08/17/2026Q01259649-P3Request digital key ↗
08/17/2026Q01259649-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00178563-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00178563-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/16/2026Q01411354-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
04/22/2020421946595Open ↗
04/17/2020421946595Open ↗
08/22/2019421895541Open ↗
▸BISWORK PERMIT APPLICATION2
09/20/2021421946595Open ↗
08/22/2019421895541Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026Q01299795-I1Open ↗
08/28/2026Q00178563-I1Open ↗
08/17/2026Q01259649-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/20/2021421946595Open ↗
04/17/2020421946595Open ↗
03/23/2020421895541Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
10/07/2026Q01299795-I1Open ↗
08/26/2026Q01259649-P3Open ↗
08/23/2026Q01259649-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/22/2019421895541Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/22/2019421895541Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/17/2020421946595Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/22/2019421895541Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/20/2021421946595Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/01/2021421946595Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/01/2021421946595Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/01/2021421946595Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
10/04/2026Q01299795-I1Open ↗
08/28/2026Q00178563-I1Open ↗
08/17/2026Q01259649-P3Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/01/2021421946595Open ↗
03/23/2020421895541Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/19/2019421895541Open ↗
▸BISLANDMARKS SIGNOFF1
10/01/2021421946595Open ↗
▸DOB NOWLandmark Approval1
08/16/2026Q01411354-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/01/2021421946595Open ↗
04/17/2020421946595Open ↗
03/23/2020421895541Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
04/17/2020421946595Open ↗
08/22/2019421895541Open ↗
07/19/2019421895541Open ↗
▸BISBOROUGH INTAKE FORM2
09/20/2021421946595Open ↗
04/17/2020421946595Open ↗
▸Other Documents2
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
03/23/2020421895541Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/28/2026Q00178563-I1Open ↗