← Back
Two family frame
58-35 WALDRON STREET
QUEENS · BIN 4048345
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5Zoning
1,806 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 20 docs
Floor 3Under Construction12p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
1 job · most recent 07/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2026Permit IssuedL&L CONSTRUCTION DEVELOPHeating and Air Conditioning Systems
Heat / Cool
Gree MULTI24HP230V1EO 23,200 BTU · Heat Pump Outdoor ×5
MULTI36HP230V1EO 34,000 BTU · Heat Pump Outdoor ×2
1 job · most recent 01/22/2026
Fence
FiledStatusContractorScope
01/22/2026Permit IssuedGOLDEN TIME CONTRACTING IFence
Building Lifecycle
All (29)Filed (6)Permit Issued (6)Signed Off (1)Objection (2)Special Inspection (14)
08/24/2026
Permit issued — General Construction
Q01339842-I1-GC
08/24/2026
Permit issued — General Construction
Q01339842-I1-MS
08/20/2026
Permit issued — Structural
Q01339842-S2-ST
07/14/2026
Filed — New Building
NEW 3-STORY BUILDING FOR 3-FAMILY RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01339842-S3
06/24/2026
Permit issued — Earth Work
Q01339842-S1-FO-EA
06/17/2026
Filed — New Building
NEW 3-STORY BUILDING FOR 3-FAMILY RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01339842-S2
06/17/2026
Filed — New Building
NEW 3-STORY BUILDING FOR 3-FAMILY RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01339842-S1
06/17/2026
Special inspection requirement — Masonry
MEHDI GHAZI
06/17/2026
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
06/17/2026
Special inspection requirement — Wood – Seismic Resistance
MEHDI GHAZI
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
06/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
06/17/2026
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
06/17/2026
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
06/16/2026
Special inspection requirement — Final
MEHDI GHAZI
06/16/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
06/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
06/16/2026
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
06/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/16/2026
Special inspection requirement — Final
MEHDI GHAZI
06/16/2026
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
06/08/2026
Signed off — Full Demolition
FULL DEMOLITION OF EXISTING 2-STORY DETACHED RESIDENCE.
Q01331468-I1
05/29/2026
Permit issued — Full Demolition
Q01331468-I1-FD
05/26/2026
Permit issued — Construction Fence
Q01335290-I1-FN
04/02/2026
Objection resolved — Resolved
03/04/2026
Objection raised — Scope
01/22/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE IN LOT #57 AND #55 AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01335290-I1
01/19/2026
Filed — New Building
NEW 3-STORY BUILDING FOR 3-FAMILY RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01339842-I1
01/07/2026
Filed — Full Demolition
FULL DEMOLITION OF EXISTING 2-STORY DETACHED RESIDENCE.
Q01331468-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
58 WALDRON1208/25/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC607/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN TIME CONTRACTING IGeneral Contractor307/08/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor308/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495107/14/2026
MEHDI GHAZI, P.E. P.C.7129306/17/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP08/24/2026
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP08/24/2026
DOB NOWStructuralPermit IssuedL&L CONSTRUCTION DEVELOP08/20/2026
DOB NOWEarth WorkPermit IssuedGOLDEN TIME CONTRACTING I06/24/2026
DOB NOWFull DemolitionSigned-offGOLDEN TIME CONTRACTING I05/29/2026
DOB NOWConstruction FencePermit IssuedGOLDEN TIME CONTRACTING I05/26/2026
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/17/2026MasonryMEHDI GHAZIspecial
06/17/2026Structural Steel - DetailsMEHDI GHAZIspecial
06/17/2026Wood – Seismic ResistanceMEHDI GHAZIspecial
06/17/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
06/17/2026Structural Steel - High Strength BoltingMEHDI GHAZIspecial
06/17/2026Structural Steel - WeldingMEHDI GHAZIspecial
06/17/2026Structural Wood FrameMEHDI GHAZIprogress
06/16/2026FinalMEHDI GHAZIprogress
06/16/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
06/16/2026Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
06/16/2026Subgrade InspectionsMEHDI GHAZIspecial
06/16/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
06/16/2026FinalMEHDI GHAZIprogress
06/16/2026Footing and FoundationMEHDI GHAZIprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01331468-I1Request digital key ↗
08/17/2026Q01339842-S2Request digital key ↗
08/17/2026Q01339842-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01339842-I1Open ↗
08/13/2026Q01339842-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01339842-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01339842-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01331468-I1Open ↗
08/17/2026Q01339842-S2Open ↗
08/17/2026Q01339842-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026Q01339842-S1Open ↗
08/27/2026Q01339842-S1Open ↗
08/24/2026Q01339842-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01339842-S1Open ↗
08/24/2026Q01339842-S2Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWSewer Cut-Off1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01339842-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q01339842-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01339842-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWRodent Control1
08/17/2026Q01331468-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01339842-S1Open ↗
08/17/2026Q01339842-I1Open ↗
▸DOB NOWSOIL REPORT2
08/17/2026Q01339842-S1Open ↗
08/13/2026Q01339842-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01331468-I1Open ↗
08/13/2026Q01339842-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01331468-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01339842-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/17/2026Q01331468-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01339842-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01339842-S1Open ↗