BROOKLYN
58 4 AVENUE
BROOKLYN · BIN 3430433
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 4 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Floor 112p · 2 filings · 20 docs
Floor 101p · 1 filing · 20 docs
Floor 92p · 3 filings · 20 docs
Floor 82p · 2 filings · 20 docs
Floor 73p · 3 filings · 20 docs
Floor 62p · 2 filings · 20 docs
Floor 53p · 3 filings · 20 docs
Floor 43p · 3 filings · 20 docs
Floor 33p · 3 filings · 20 docs
Floor 23p · 4 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC1004/27/2026
PAUL G. JONES, P.E.509/16/2025
SKYLINE RIGGING108/20/2025
WEXLER ASSOCIATES202/21/2024
PAUL PERDEK, PROF. ENG. PLLC301/25/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGHTWAY PLBG AND HTG INCFire Protection206/28/2026
BEST MECHANICAL SVCS INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616504/27/2026
SKYLINE RIGGING7880108/20/2025
REGIONAL TESTING CORP.394603/22/2024
Building Lifecycle
All (129)Filed (21)Permit Issued (19)Signed Off (9)Inspection (14)Objection (36)Special Inspection (30)
08/31/2026
Signed off — Alteration
STRUCTURAL WORK APPLICATION FILED IN CONJUNCTION TO NB BIS APPLICATION 340797141
B00585968-I1
08/26/2026
Signed off — Alteration
B01273781-I1
08/13/2026
Signed off — Alteration
SUBSEQUENT PLUMBING WORK-TYPE FILED IN CONJUNCTION TO NB BIS APPLICATION #340797141
B00507407-I1
08/12/2026
Signed off — Alteration
TEMPORARY STANDPIPIE SYSTEM FILING IN CONJUNCTION TO HIGH-RISE NEW BUILDING APPLICATION 340797141
B00585974-I1
05/01/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/01/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/01/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/27/2026
Filed — Alteration
SUBSEQUENT PLUMBING WORK-TYPE FILED IN CONJUNCTION TO NB BIS APPLICATION #340797141
B00507407-P5
04/27/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/27/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
04/27/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
04/24/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00814873-I1
04/13/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-I1
04/13/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-S1
03/24/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/23/2026
Signed off — Alteration
SUBSEQUENT MECHANICHAL WORK-TYPE FILED IN CONJUNCTION TO NB BIS APPLICATION #340797141
B00507408-I1
12/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00583410-I1
09/16/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-P3
08/21/2025
Permit issued — Suspended Scaffold
B01273781-I1-SC
08/20/2025
Filed — Alteration
B01273781-I1
08/19/2025
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
08/15/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/14/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-P2
08/13/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
07/16/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-P1
07/16/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/14/2025
Permit issued — Plumbing
B00507407-I1-PL
07/03/2025
Permit issued — Structural
B00585968-I1-ST
06/30/2025
Permit issued — Standpipe
B00585974-I1-EW-SD
06/18/2025
Permit issued — Sprinklers
B00507407-S1-EW-SP
06/18/2025
Permit issued — Standpipe
B00507407-S1-EW-SD
06/17/2025
Permit issued — Mechanical Systems
B00507408-I1-MS
06/03/2025
Permit issued — Sidewalk Shed
B01234913-I1-SH
06/03/2025
Permit issued — Protection and Mechanical Methods
B01234913-S1-PMM
06/03/2025
Permit issued — Supported Scaffold
B01234913-I1-SF
06/02/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-I1
06/02/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01234913-S1
05/27/2025
Permit issued — Structural
B00585968-I1-ST
04/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/11/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/22/2024
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
05/22/2024
Special inspection requirement — Final
FAHAD FATEH
05/22/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/22/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/22/2024
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
05/22/2024
Special inspection requirement — Structural Steel - High Strength Bolting
FAHAD FATEH
05/20/2024
Objection resolved — Addressed
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/15/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/15/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDORIA SCAFFOLDING08/21/2025
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC07/14/2025
DOB NOWStructuralSigned-offON STAR MANAGEMENT LLC07/03/2025
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC06/30/2025
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC06/18/2025
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC06/18/2025
DOB NOWMechanical SystemsSigned-offON STAR MANAGEMENT LLC06/17/2025
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING06/03/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/03/2025
DOB NOWStructuralSigned-offON STAR MANAGEMENT LLC05/27/2025
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC12/13/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC12/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/19/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/12/2023
DOB NOWStructuralSigned-offON STAR MANAGEMENT LLC11/25/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC11/16/2022
DOB NOWStandpipeSigned-offA M B MECHANICAL INC11/10/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES08/27/2021
1 project · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026Signed-offRIGHTWAY PLBG AND HTG INC1,026 heads, 2 outlets
1 project · most recent 04/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/27/2026Signed-offBEST MECHANICAL SVCS INCStorm, Water/Sanitary
4 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
06/25/2025CompleteSOLAS ELECTRICAL CORP—
08/19/2021CompleteV. VASS ELECTRIC CORP—
08/19/2021Permit IssuedV. VASS ELECTRIC CORP—
1 project · most recent 02/21/2024
Concrete
FiledStatusContractorScope
02/21/2024Signed-offON STAR MANAGEMENT LLCConcrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/24/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/15/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/13/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/16/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
05/01/2026Post-installed AnchorsFAHAD FATEHspecial
05/01/2026Sprinkler SystemsFAHAD FATEHspecial
05/01/2026Standpipe SystemsFAHAD FATEHspecial
05/01/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/27/2026Post-installed AnchorsFAHAD FATEHspecial
04/27/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/27/2026Standpipe SystemsFAHAD FATEHspecial
04/27/2026Sprinkler SystemsFAHAD FATEHspecial
08/19/2025Post-installed AnchorsZELJKO STEVANOVICspecial
05/22/2024Structural Steel - WeldingFAHAD FATEHspecial
05/22/2024FinalFAHAD FATEHprogress
05/22/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/22/2024Post-installed AnchorsFAHAD FATEHspecial
05/22/2024Structural Steel - DetailsFAHAD FATEHspecial
05/22/2024Structural Steel - High Strength BoltingFAHAD FATEHspecial
04/15/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/15/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/15/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
04/15/2024Maintenance informationFAHAD FATEHenergy_progress
04/15/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/15/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/20/2024Standpipe SystemsPaul Raymondspecial
02/20/2024Mechanical SystemsPaul Raymondspecial
02/20/2024Energy Code Compliance InspectionsPaul Raymondprogress
02/20/2024Heating SystemsPaul Raymondspecial
Latest 25 of 57.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/01/2026B00507408-P1Request digital key ↗
09/01/2026B00507408-P2Request digital key ↗
09/01/2026B00507408-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00507408-I1Open ↗
09/01/2026B00507408-P2Open ↗
09/01/2026B00507408-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/29/2026B00507408-P2Open ↗
09/29/2026B00507408-P2Open ↗
09/29/2026B00507408-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026B00507408-P2Open ↗
09/29/2026B00507408-P2Open ↗
09/29/2026B00507408-P2Open ↗
Showing 3 of 16 on file for this type
▸Environmental & Asbestos8
▸DOB NOWOER: Notice of Satisfaction4
09/01/2026B00585968-I1Open ↗
09/01/2026B00585968-I1Open ↗
08/15/2026B00507407-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
09/01/2026B00585968-I1Open ↗
08/15/2026B00507407-I1Open ↗
08/13/2026B00585968-P3Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00507408-I1Open ↗
08/13/2026B00507407-I1Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01273781-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01273781-I1Open ↗